Agenda item

23/01285/FUL - 314 Station Road, Westcliff-on-Sea (Chalkwell Ward)

Minutes:

Proposal: Change of use from mixed-use laundrette on basement/ground floors and residential on first and second floors (Sui Generis/Class C3) to assisted living accommodation to front (C3(b)) and new dwelling to rear (Class C3), erect second floor rear extension and alter elevations (amended proposal)

Applicant: Mr Joe Thomas

Agent: Edith Garland Architecture

 

Resolved:-

 

That planning permission be GRANTED subject to the following conditions:

 

01 The development hereby permitted shall begin no later than three years from the date of this decision.

 

Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.

 

02 The development hereby approved shall be carried out in accordance with the approved plans: 384/R04/E, 384/R03/H, 384/R02/A, 384/R01/C.

 

Reason: To ensure the development is carried out in accordance with the development plan.

 

03 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition and construction up to ground floor slab level shall take place unless and until details, including full product details, of the materials to be used on all the external elevations of the development hereby approved, including but not limited to the exterior walls and associated brick and cladding details including details of the brick banding; roof, including coping; windows, doors, rooflights and fascias; have been submitted to and approved in writing by the Local Planning Authority under the terms of this condition. The development shall be carried out in accordance with the approved details before it is first occupied or brought into first use.

 

Reason: To safeguard the visual amenities of the area, in accordance with the National Planning Policy Framework (2023), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policy DM1 and the advice contained within the National Design Guide (2021) and the Southend-on-Sea Design and Townscape Guide (2009).

 

04 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition and construction up to ground floor slab level shall take place unless and unless and until full details of hard and soft landscape works and boundary treatments to be carried out at the site have been submitted to and approved in writing by the Local Planning Authority under the terms of this condition. The approved hard landscape works and boundary treatments shall be completed prior to first occupation of the development hereby approved, and the soft landscaping works within the first planting season following first occupation of the development. The details submitted shall include, but not be limited to:

 

i.) Means of enclosure of the site and plots including any walls, gates or boundary fencing.

ii.) Details of external hard surfacing.

iii.) Details of the number, size and location of trees, shrubs and plants to be planted together with a planting specification and management.

iv.) Details of measures to enhance biodiversity within the site.

 

Any trees or shrubs dying, removed, being severely damaged or becoming seriously diseased within five years of planting shall be replaced with trees or shrubs of such size and species as agreed with the Local Planning Authority under the terms of this condition.

 

Reason: In the interests of visual amenity and the amenities of occupiers and to ensure a satisfactory standard of landscaping are implemented pursuant to Policy DM1 of the Development Management Document (2015) and Policy CP4 of the Core Strategy (2007)

 

05 Construction and demolition works for the approved development on site shall only be undertaken between 8 am to 6 pm on weekdays, between 8 am and 1 pm on Saturdays and not at any time on Sundays and Bank and Public Holidays.

 

Reason: In the interest of the residential amenity of nearby occupiers in accordance with the National Planning Policy Framework (2023), Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

06 Prior to first occupation of the development hereby approved details of energy efficiency and other sustainability measures to be included in the scheme, including the provision of at least 10% of the energy needs of the development hereby approved being provided from onsite renewable sources, shall be submitted to and agreed in writing by the Local Planning Authority under the terms of this condition and implemented on site in accordance with the agreed details. The agreed measures shall be maintained on site as approved thereafter.

 

Reason: To minimise the environmental impact of the development through efficient use of resources and better use of sustainable and renewable resources in accordance with the National Planning Policy Framework (2023), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policy DM2, and the advice contained within the National Design Guide (2021) and the Southend-on-Sea Design and Townscape Guide (2009).

 

07 The dwellings hereby approved shall incorporate water efficient design measures set out in Policy DM2 (iv) of the Development Management Document to limit internal water consumption to 105 litres per person per day (lpd) (110 lpd when including external water consumption), including measures of water efficient fittings, appliances and water recycling systems such as grey water and rainwater harvesting before they are occupied.

 

Reason: To minimise the environmental impact of the development through efficient use of resources and better use of sustainable and renewable resources in accordance with the National Planning Policy Framework (2023), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policy DM2, and the advice contained within the National Design Guide (2021) and the Southend-on-Sea Design and Townscape Guide (2009).

 

08 Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended), or any Order or Act of Parliament revoking and re-enacting that Order with or without modification, no extensions or detached buildings shall be erected at the development hereby approved specified within Schedule 2, Part 1, Classes A, B, C, D, E and F of the Town and Country Planning (General Permitted Development) Order 2015 without the receipt of express planning permission in writing from the Local Planning Authority.

 

Reason: To enable the Local Planning Authority to regulate and control development in the interest of the amenity of proposed and neighbouring occupiers and to safeguard the character of the area in accordance the National Planning Policy Framework (2023), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policy DM1 and advice in the Southend-on-Sea Design and Townscape Guide (2009).

 

09 The development hereby approved shall not be occupied until and unless refuse and recycling and cycle storage facilities are provided and made available for use by its occupiers in full accordance with details, including details of allocation of cycle storage, which shall have been previously submitted to and agreed in writing by the Local Planning Authority under the terms of this condition. The refuse and recycling and cycle storage facilities shall be retained for the lifetime of the development in accordance with the approved details.

 

Reason: To ensure that adequate refuse and recycling storage and secure cycle parking is provided and retained to serve the development in accordance with Policies CP3 and CP4 of the Core Strategy (2007) and Policies DM1, DM3 and DM15 of the Development Management Document (2015).

 

10 In the event that contamination is found at any time when carrying out the approved development that was not previously identified development must stop and it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken, and where remediation is necessary a remediation scheme must be prepared submitted for the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority. Investigation, remediation and verification must be undertaken by competent persons and in accordance with the Essex Contaminated Land Consortium's 'Land Affected by Contamination: Technical Guidance for Applicants and Developers' and DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11' and other current guidance deemed authoritative for the purposes.

 

Reason: To ensure that any contamination on the site is identified and treated so that it does not harm anyone who uses the site in the future, and to ensure that the development does not cause pollution to Controlled Waters in accordance with Core Strategy (2007) Policies KP2 and CP4 and Policies DM1 and DM14 of the Development Management Document (2015).

 

POSITIVE AND PROACTIVE STATEMENT

 

The Local Planning Authority has acted positively and proactively in determining this application by identifying matters of concern within the application (as originally submitted) and negotiating, with the Applicant, acceptable amendments to the proposal to address those concerns. As a result, the Local Planning Authority has been able to grant planning permission for an acceptable proposal, in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework. The detailed analysis is set out in a report on the application prepared by officers.

 

INFORMATIVES:

 

1. CIL You are advised that as the development equates to less than 100sqm of new floorspace the development benefits from a Minor Development Exemption under the Community Infrastructure Levy Regulations 2010 (as amended) and as such no charge is payable. See www.southend.gov.uk/cil for further details about the Levy.

 

2. You should be aware that in cases where damage occurs during construction works to the highway in implementing this permission that Council will seek to recover the cost of repairing public highways and footpaths from any party responsible for damaging them. This includes damage carried out when implementing a planning permission or other works to buildings or land. Please take care when carrying out works on or near the public highways and footpaths in the city.

 

3. No waste materials are to be burnt on the site, instead shall be removed by licensed waste contractors.

 

4. The applicant shall provide scheme to prevent the emissions of noise, dust and fumes from leaving the boundary of the site.

 

5. Consideration must be taken to restricting the duration of noisy activities and in locating them away from the periphery of the site. If it is predicted that the construction works are likely to cause a nuisance the applicant should apply for a prior consent application under section 61 of the Control of Pollution Act 1974. A consent enables the applicant to conduct the works without the worry of enforcement provided they comply with it. The applicant will have to submit details of any noisy works including type of plant and machinery to be used, proposed daily start and finish times, consultation with nearby residents and businesses and duration and time scales of the works. The applicant should contact the Regulatory Services Team at Southend-on-Sea City Council for details.

 

6. Overheating and Noise Protection Applicants are advised of the need to ensure the thermal comfort of dwellings under Regulation 40B of the Building Regulations 2010. The code of practice to the Regulations in Approved Document O requires an overheating mitigation strategy and assessment. This includes where noise protection measures require windows and openings to be closed.

 

7. Prior to any alterations to the existing buildings an appropriate Asbestos survey of the buildings should be undertaken and a scheme implemented to remove and safely dispose of any asbestos-containing materials in accordance with the Control of Asbestos Regulations 2012 and the applicant's/developer's Waste duty of care

 

8. Future occupiers will not be eligible for a residential parking permit.

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.