Agenda item

24/00352/FUL - 135 Marine Parade, Leigh-on-Sea (West Leigh Ward)

Minutes:

Proposal: Demolish existing building and erect three storey building comprising four self-contained flats with balconies to front, layout parking, refuse and cycle store to rear (amended proposal)

Applicant: P Miller + P Hills of P + PR Property Developments Ltd

Agent: Miss Liz Schofield of BDA Architecture

 

Resolved:-

 

That planning permission be GRANTED subject to the following conditions:

 

01 The development hereby permitted shall begin no later than three years from the date of this decision.

 

Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.

 

02 The development shall only be undertaken in accordance with the following approved plans: 23.172/01, 23.172/02 Rev C, 23.172/03 Rev B, 23.172/04 Rev B, 23.172/05 Rev B.

 

Reason: To ensure the development is carried out in accordance with the consent sought, has an acceptable design and complies with Policy DM1 of the Development Management Document (2015).

 

03 Prior to commencement of the development above ground floor slab level, full product details of the materials to be used in the construction of all the external elevations of the development hereby approved shall be submitted to and agreed in writing by the Local Planning Authority under the terms of this condition. The development shall be carried out solely in accordance with the approved details before it is first occupied.

 

Reason: In the interests of visual amenities, in accordance with the National Planning Policy Framework (2023), Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1 and DM3 of the Development Management Document (2015) and the advice contained within the Southend-on-Sea Design and Townscape Guide (2009).

 

04 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition above ground floor slab level shall take place unless and until full detailed design drawings and cross sections of the approved development’s gable and dormer framing and balconies including any privacy screens at a scale of 1:20 or 1:10 as appropriate have first been submitted to and agreed in writing by the Local Planning Authority under the terms of this condition. The development shall be carried out in full accordance with such approved details before it is first occupied.

 

Reason: To safeguard the visual amenities of the area including the character and appearance of the area in accordance with the National Planning Policy Framework (2023), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1 and DM5 and the advice contained within the Southend-on-Sea Design and Townscape Guide (2009) and the National Design Guide (2021)

 

05 The roof of the single storey rear projection within the development hereby approved shall not be used as a balcony, roof garden or similar amenity area or for any other purpose unless express planning permission has previously been obtained. The roof can however be used for the purposes of maintenance or to escape in an emergency.

 

Reason: To protect the privacy and environment of people in neighbouring residential properties, in accordance with Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1 and DM3 and advice contained within the Southend-on-Sea Design and Townscape Guide (2009).

 

06 No development above ground floor slab level shall take place unless and until full details of hard and soft landscape works and boundary treatments to be carried out at the site have been submitted to and approved in writing by the Local Planning Authority under the terms of this condition. The approved hard landscape works and boundary treatments shall be completed prior to first occupation of the development hereby approved, and the soft landscaping works within the first planting season following first occupation of the development. The details submitted shall include, but not be limited to:

 

i.) Existing and proposed site levels.

ii.) Means of enclosure, of the site including any gates or boundary fencing;

iii.) Details of external hard surfacing, to include permeable paving;

iv.) Details of the number, size and location of trees, shrubs and plants to be planted together with a planting specification;

v.) Details of measures to enhance biodiversity within the site;

vi.) All and any means of subdividing and enclosing the site.

 

Any trees or shrubs dying, removed, being severely damaged or becoming seriously diseased within five years of planting shall be replaced with trees or shrubs of such size and species as agreed with the Local Planning Authority under the terms of this condition.

 

Reason: In the interests of visual amenity and the amenities of occupiers and to ensure a satisfactory standard of landscaping is implemented pursuant to Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

07 The 8 car parking spaces and the associated vehicular access for the spaces to be accessed from the public highway, shown on approved plan 23.172/02 Rev C shall be provided and made available for use at the site prior to the first occupation of the development hereby approved. The car parking spaces and the associated vehicular access to and from the public highway shall thereafter be permanently retained solely for the parking of vehicles and the accessing of the car parking spaces in connection with the occupiers of the dwellings hereby approved and their visitors. At least one parking space for each flat must have access to active electric vehicle charging. The redundant vehicular crossover must be reinstated to pavement prior to the first occupation of the development.

 

Reason: In the interests of the living conditions of future occupiers and highway safety, further to the National Planning Policy Framework (2023), Core Strategy (2007) Policies KP2, CP3 and CP4, Development Management Document (2015) Policy DM15 and the advice contained within the Southend-on-Sea Design and Townscape Guide (2009) and the Southend-on-Sea Vehicle Crossing Policy & Application Guidance (2021).

 

08 A scheme detailing how at least 10% of the total energy needs of the development hereby approved will be supplied, using on site renewable sources must be submitted to and agreed in writing by the Local Planning Authority under the terms of this condition and implemented in full prior to the first occupation of the development. This provision shall be made for the lifetime of the development.

 

Reason: In the interests of providing sustainable development in accordance with Policy KP2 of the Southend-on-Sea Core Strategy (2007), and Policy DM2 of the Southend-on-Sea Development Management Document (2015).

 

09 The development hereby approved shall incorporate water efficient design measures set out in Policy DM2 (iv) of the Development Management Document to limit internal water consumption to 105 litres per person per day (lpd) (110 lpd when including external water consumption), including measures of water efficient fittings, appliances and water recycling systems such as grey water and rainwater harvesting before it is brought into use.

 

Reason: To minimise the environmental impact of the development through efficient use of water in accordance with the National Planning Policy Framework (2023), Policy KP2 of the Southend-on-Sea Core Strategy (2007), Policy DM2 of the Southend-on-Sea Development Management Document (2015) and the advice contained within the Southend-on-Sea Design and Townscape Guide (2009).

 

10 The four dwellings hereby approved shall be completed in a manner to ensure compliance with Building Regulations part M4(2) ‘Accessible Dwellings’ before they are first occupied.

 

Reason: To ensure the provision of flexible internal layouts to meet the changing needs of residents in accordance with the National Planning Policy Framework (2023), Core Strategy (2007) Policy KP2, Development Management Document (2015) Policy DM2 and the advice contained within the Southend-on-Sea Design and Townscape Guide (2009).

 

11 Notwithstanding the plans submitted and otherwise approved, the development hereby approved shall not be occupied until and unless secure, covered cycle storage and refuse/recycling storage for users of the development have been provided at the site in accordance with details which have been previously submitted to and approved in writing by the Local Planning Authority. The approved cycle and refuse/recycling storage shall be made available for use by the users of the development hereby approved prior to its occupation and shall be retained as such for the lifetime of the development thereafter.

 

Reason: To ensure that adequate refuse and recycling storage and secure cycle parking is provided and retained to serve the development in accordance with Policy CP3 of the Core Strategy (2007) and Policy DM15 of the Development Management Document (2015).

 

12 No drainage infrastructure associated with this development shall be undertaken unless and until details of the design implementation, maintenance and management of a scheme for surface water drainage works (incorporating Sustainable Urban Drainage (SuDs) Principles) have been submitted to and approved in writing by the Local Planning Authority under the terms of this condition. The approved scheme shall be implemented, in accordance with the approved details before the development is first occupied and shall be maintained as such thereafter in perpetuity.

 

Reason: To prevent flooding by ensuring the satisfactory storage and disposal of surface water from the site for the lifetime of the development and to prevent environmental and amenity problems arising from flooding in accordance with the National Planning Policy Framework (2023), Policy KP2 and CP4 of the Core Strategy (2007) and Policy DM2 of the Development Management Document (2015).

 

13 All glazing to habitable rooms windows shall be acoustic glazing RW 37 for bedrooms and RW 31 for Living Rooms to meet the requirements of British Standard 8233:2014 as set out on Table 10 in plan reference 23.172/03B unless alternative details are otherwise submitted to and agreed in writing with the Local Planning Authority under the scope of this planning condition.

 

Reason: In order to protect the amenities of occupiers of the development from traffic noise in accordance with Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

14 Unexpected Contamination - In the event that contamination is found at any time when carrying out the approved development that was not previously identified development must stop and it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken, and where remediation is necessary a remediation scheme must be prepared submitted for the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority.

 

Investigation, remediation and verification must be undertaken by competent persons and in accordance with the Essex Contaminated Land Consortium's 'Land Affected by Contamination: Technical Guidance for Applicants and Developers' and DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11' and other current guidance deemed authoritative for the purposes.

 

Reason: To ensure that any contamination on the site is identified and treated so that it does not harm anyone who uses the site in the future, and to ensure that the development does not cause pollution to Controlled Waters in accordance with Core Strategy (2007) Policies KP2 and CP4 and Policies DM1 and DM14 of the Development Management Document (2015).

 

15 The development hereby approved shall be constructed in full accordance with the Construction Method Statement by BDA dated May 2024 or any other construction method statement which has previously been submitted to and agreed in writing by the Local Planning Authority under the terms of this condition and prior to any development commencing.

 

Reason: To minimise the environmental impact and disturbance to existing residents, during construction of the development in accordance with the National Planning Policy Framework (2023), Core Strategy (2007) Policies KP2 and CP4 and Development Management Document (2015) Policies DM1 and DM3.

 

16 Construction hours for the development hereby approved shall be restricted to 8am to 6pm Monday to Friday, 8am to 1pm on Saturdays and not at all on Sundays or Bank or Public Holidays.

 

Reason: To protect the environment of people in neighbouring residential properties, in accordance with the National Planning Policy Framework (2023), Policies KP2 and CP4 of the Southend-on-Sea Core Strategy (2007), Policies DM1 and DM3 of the Southend-on-Sea Development Management Document (2015) and the advice contained within the Southend-on-Sea Design and Townscape Guide (2009).

 

17 Privacy screens of not less than 1.7m high above terrace/balcony level shall be fitted on the centre line of the southern terrace/balcony at ground and first floor levels in accordance with details that have previously been submitted and approved by the Local Planning Authority prior to first occupation of the development. The screens shall be retained for the lifetime of the development in accordance with the approved details.

 

Reason: To protect the privacy and environment of people in new and neighbouring residential properties, in accordance with the National Planning Policy Framework (2023), Core Strategy (2007) Policy CP4, Development Management Document (2015) Policy DM1, and advice contained within the Southend-on-Sea Design and Townscape Guide (2009).

 

18 The first floor windows in the eastern elevation of the proposed development shall only be glazed in obscure glass (the glass to be obscure to at least Level 4 on the Pilkington Levels of Privacy, or such equivalent as may be agreed in writing with the Local Planning Authority ) and fixed shut up to a height of not less than 1.7m above the relevant rooms internal finished floor level before the occupation of the development hereby approved and the windows shall be retained as such in perpetuity. In the case of multiple or double-glazed units at least one layer of glass in the relevant units shall be glazed in obscure glass to at least Level 4.

 

Reason: To protect the privacy and environment of people in proposed and neighbouring residential properties, in accordance with the National Planning Policy Framework (2023), Core Strategy (2007) Policy CP4, Development Management Document (2015) Policy DM1, and advice contained within the Southend-on-Sea Design and Townscape Guide (2009).

 

POSITIVE AND PROACTIVE STATEMENT:

 

The Local Planning Authority has acted positively and proactively in determining this application by identifying matters of concern within the application (as originally submitted) and negotiating, with the Applicant, acceptable amendments to the proposal to address those concerns. As a result, the Local Planning Authority has been able to grant planning permission for an acceptable proposal, in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework. The detailed analysis is set out in a report on the application prepared by officers.

 

INFORMATIVES:

 

1. Please note that the development the subject of this application is liable for a charge under the Community Infrastructure Levy (CIL) Regulations 2010 (as amended), and it is the responsibility of the landowner(s) to ensure they have fully complied with the requirements of these regulations. A failure to comply with the CIL regulations in full can result in a range of penalties. For full planning permissions, a CIL Liability Notice will be issued by the Council as soon as practicable following this decision notice. For general consents, you are required to submit a Notice of Chargeable Development (Form 5) before commencement; and upon receipt of this, the Council will issue a CIL Liability Notice including details of the chargeable amount and when this is payable. If you have not received a CIL Liability Notice by the time you intend to commence development it is imperative that you contact S106andCILAdministration@southend.gov.uk to avoid financial penalties for potential failure to comply with the CIL Regulations 2010 (as amended). If the chargeable development has already commenced, no exemption or relief can be sought in relation to the charge and a CIL Demand Notice will be issued requiring immediate payment. Further details on CIL matters can be found on the Planning Portal (www.planningportal.co.uk/info/200136/policy_and_legislation/70/community_infrastructure_levy) or the Council's website (www.southend.gov.uk/cil

 

2. You should be aware that in cases where damage occurs during construction works to the highway in implementing this permission that Council will seek to recover the cost of repairing public highways and footpaths from any party responsible for damaging them. This includes damage carried out when implementing a planning permission or other works to buildings or land. Please take care when carrying out works on or near the public highways and footpaths in the city.

 

3. Construction outside of normal hours - If construction works are to be considered outside of normal hours especially overnight or are expected to cause a nuisance to existing receptors it is recommended that the applicant applies for a prior consent application under section 61 of the Control of Pollution Act 1974. A consent enables the applicant to conduct the works without the worry of enforcement provided they comply with it. The applicant will have to submit details of any noisy works including type of plant and machinery to be used, proposed daily start and finish times, consultation with nearby residents and businesses and duration and time scales of the works. The applicant will need an acoustically qualified person who will be able to calculate the predicted noise levels form the operation and the impact on nearby residents and then be able to evaluate mitigation measures that can be used. If we become aware of any works that are highly likely to cause a nuisance we can serve a notice under section 60 of the Control of Pollution Act 1974 to prevent this. A breach of this will represent a criminal offence. The application form and guidance are available on the Southend-On-Sea City Council website. The applicant can also contact the Regulatory Services Team at Southend-on-Sea City Council for details.

 

4. Asbestos - Prior to demolition of the existing buildings an appropriate Asbestos survey of the buildings should be undertaken and a scheme implemented to remove and safely dispose of any asbestos-containing materials in accordance with the Control of Asbestos Regulations 2012 and the applicant's/developer's Waste duty of care. It is recommended that the Council's building control department is notified of the demolition in order that requirements can be made under section 81 of the Building Act 1984.

 

5. Stacking – Where the floor layouts result in sleeping and living rooms stacked over each other between separate apartments the applicant is advised that additional sound insulation may be required in the ceiling in order to protect against noise from the normal use of the dwellings in the block due to conflicting activities e.g. sleep and living. The applicant should be aware of this as should complaints arise when it is occupied because of this Southend-on-Sea City Council cannot require action under other primary legislation it has i.e. for statutory nuisance.

 

6. The applicant is reminded that this permission does not bestow compliance with other regulatory frameworks. In particular, your attention is drawn to the statutory nuisance provisions within the Environmental Protection Act 1990 (as amended) and the noise provisions within the Control of Pollution Act 1974. Applicants should contact the Council’s Regulatory Services Officer in Environmental Protection for more advice on 01702 215005 or at Regulatory Services, Southend-on-Sea City Council, Civic Centre, Victoria Avenue, Southend SS2 6ER’.

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.