Agenda item

24/01185/FUL - 9 Hainault Avenue, Westcliff-on-Sea (Westborough Ward)

Minutes:

Proposal: Demolition of existing storage shed and erect dwelling house

Applicant: Mr Rob McBain of Neobards Limited

Agent: Mr Rob Neobard of Neobards Limited

 

Resolved:-

 

That PLANNING PERMISSION be GRANTED subject to the following conditions:

 

01 The development hereby permitted shall begin no later than three years from the date of this decision.

 

Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.

 

02 The development hereby approved shall only be undertaken in accordance with the following approved plans: 0100; 0101 Rev B.

 

Reason: To ensure the development is carried out in accordance with the consent sought, has an acceptable design and complies with Policy DM1 of the Development Management Document (2015)

 

03 Notwithstanding the information submitted with the application, no development above ground floor slab level shall take place unless and until full details of the detailed fenestration design and all materials to be used on all the external elevations of the development hereby approved including for the external walls, roofing, fascia and soffits, doors and windows, have been submitted to and approved in writing by the Local Planning Authority under the terms of this condition. The development shall only be carried out and completed in full accordance with the approved details.

 

Reason: To safeguard the character and appearance of the surrounding area in accordance with Policies KP2 and CP4 of the Core Strategy (2007) and Policy DM1 of the Development Management Document (2015).

 

04 Construction works for the approved development on site shall only be undertaken between 8 am to 6 pm on weekdays, between 8 am and 1 pm on Saturdays and not at any time on Sundays and Bank and Public Holidays.

 

Reason: In the interest of the residential amenity of nearby occupiers in accordance with the National Planning Policy Framework (2023), Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

05 No development above ground level shall take place unless and until full details of both hard and soft landscape works to be carried out at in the front and rear parts of the site have been submitted to and approved in writing by the Local Planning Authority under the terms of this condition. The approved hard landscaping works shall be carried out prior to first occupation of the development and the soft landscaping works within the first planting season following first occupation of the development. The details submitted shall include, but not be limited to:

 

i.) means of enclosure of and subdividing the site, including enclosure of the front garden and including details of any gates or boundary treatments.

ii.) hard surfacing materials.

iii.) details of the number, size and location of the trees, shrubs and plants to be retained and planted together with a planting specification.

iv.) details of measures to enhance biodiversity within the site.

v.) details of any permeable paving or other sustainable drainage measures to be implemented.

vi.) existing and proposed finished site levels or contours.

 

Any trees or shrubs dying, removed, being severely damaged or becoming seriously diseased within five years of planting shall be replaced with trees or shrubs of such size and species as agreed in writing by the Local Planning Authority under the terms of this condition.

 

Reason: In the interests of visual amenity and the amenities of occupiers and to ensure a satisfactory standard of landscaping are implemented pursuant to Policy CP4 of the Core Strategy (2007) and Policy DM1 of the Development Management Document (2015).

 

06 A scheme detailing how at least 10% of the total energy needs of the development hereby approved will be supplied using on site renewable sources shall be submitted to and agreed in writing by the Local Planning Authority under the terms of this condition and implemented in full prior to the first occupation of the development. This provision shall be made for the lifetime of the development and in accordance with the agreed details.

 

Reason: In the interests of providing sustainable development in accordance with Policy KP2 of the Core Strategy (2007), Development Management Document (2015) Policy KP2 and the advice within the Southend-on-Sea Design and Townscape Guide (2009).

 

07 Prior to occupation of the development hereby approved water efficient design measures as set out in Policy DM2 (iv) of the Development Management Document to limit internal water consumption to 105 litres per person per day (lpd) (110 lpd when including external water consumption), including measures of water efficient fittings, appliances and water recycling systems such as grey water and rainwater harvesting shall be installed in the development hereby approved and be retained in perpetuity thereafter.

 

Reason: To minimise the environmental impact of the development through efficient use of water in accordance with the National Planning Policy Framework (2023), Core Strategy (2007) Policy KP2, Development Management Document (2015) Policy DM2 and the advice within the Southend-on-Sea Design and Townscape Guide (2009).

 

08 The flat roof of the development hereby approved shall not be used as a balcony, roof garden or terrace or for any other purpose at any time without planning permission having been granted. The roof can however be used for the purposes of maintenance or to escape in the event of an emergency.

 

Reason: To ensure the development has an acceptable design and protects the amenities of neighbouring occupiers in accordance with Policy DM1 of the Development Management Document (2015).

 

09 The development hereby approved shall be carried out in a manner to ensure that the dwelling complies with Building Regulation Part M4(2) ‘accessible and adaptable dwellings’ before it is brought into use and first occupied.

 

Reason: To ensure the residential unit hereby approved provides high quality and flexible internal layouts to meet the changing needs of residents in accordance with the National Planning Policy Framework (2023), Core Strategy (2007) Policy KP2, Development Management Document (2015) Policy DM2 and the advice within the Southend-on-Sea Design and Townscape Guide (2009).

 

10 No drainage infrastructure associated with the development hereby approved is to be installed unless and until details of surface water attenuation for the site, based on Sustainable Urban Drainage principles, have been submitted to and approved in writing by the Local Planning Authority under the provisions of this condition.

 

The development shall be carried out fully in accordance with the approved details before it is first occupied.

 

Reason: In order to ensure a satisfactory standard of sustainable drainage and to prevent environmental and amenity problems arising from flooding in accordance with the National Planning Policy Framework (2023), Policies KP2 and CP4 of the Core Strategy (2007) and Policy DM2 of the Development Management Document (2015).

 

11 Prior to the first occupation of the development hereby approved, full details (including scaled elevations) shall be submitted to and approved in writing by the Local Planning Authority under the terms of this condition identifying the provision of secure and enclosed refuse and recycling and cycle storage for the approved development at the site. The approved refuse and recycling and cycle storage shall be provided in full and made available for use by the occupants of the approved dwelling prior to the first occupation of the dwelling hereby approved and shall be retained as such thereafter for the lifetime of the development.

 

Reason: In the interest of visual amenity in accordance with the National Planning Policy Framework (2023), Core Strategy (2007) Policies KP2, CP3 and CP4, Development Management Document (2015) Policies DM1, DM3, DM8 and DM15, and the advice contained within the National Design Guide (2021), the Southend-on-Sea Design and Townscape Guide (2009), and the Waste Storage, Collection and Management Guide for New Developments (2019).

 

12 No development shall take place, including any works of demolition, unless and until a Demolition and Construction Management Plan and Strategy (to include Noise and Dust Mitigation Strategies) has been submitted to and approved in writing by the Local Planning Authority pursuant to this condition. The approved Demolition and Construction Management Plan and Strategy shall be adhered to in full throughout the construction period. The Strategy shall provide, amongst other things, for:

 

i.) the parking of vehicles of site operatives and visitors.

ii.) loading and unloading of plant and materials.

iii.) storage of plant and materials used in constructing the development,

iv.) the erection and maintenance of security hoarding.

v.) measures to control the emission of dust, dirt, mud being carried onto the road and noise during construction.

vi.) a scheme for recycling/disposing of waste resulting from construction works that does not allow for the burning of waste on site.

vii.) a dust management plan to include mitigation and boundary particulate monitoring during demolition and construction.

viii.) details of the duration and location of any noisy activities.

 

Reason: A pre-commencement condition is justified in the interest of the residential amenity of nearby occupiers and for highway safety in accordance with the National Planning Policy Framework (2023), Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

13 The first floor window in the northern side elevation of the development hereby approved shall only be glazed in obscure glass (the glass to be obscure to at least Level 4 on the Pilkington Levels of Privacy) and fixed shut (except for any top hung fan light which shall be a minimum of 1.7 metres above internal finished floor level) prior to the first occupation of the development hereby permitted and shall be retained as such thereafter. In the case of multiple or double-glazed units at least one layer of glass in the relevant units shall be glazed in obscure glass to at least Level 4 on the Pilkington scale.

 

Reason: To ensure the development has an acceptable design and protects the amenities of neighbouring occupiers in accordance with Policy DM1 of the Development Management Document (2015).

 

14 In the event that contamination is found at any time when carrying out the development it shall be reported in writing immediately to the Local Planning Authority and the carrying out of the development shall stop immediately under the terms of this condition. An investigation and risk assessment shall be undertaken, and where remediation is necessary, a remediation scheme must be submitted and approved in writing by the Local Planning Authority under the terms of this condition.

 

Following completion of measures identified in the approved remediation scheme a verification report must be submitted to and approved in writing by Local Planning Authority under the terms of this condition.

 

Investigation, remediation and verification must be undertaken by competent persons and in accordance with the Essex Contaminated Land Consortium's 'Land Affected by Contamination: Technical Guidance for Applicants and Developers' and DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11' and other current guidance deemed authoritative for the purposes.

 

Reason: For the avoidance of land contamination and human health in accordance with the National Planning Policy Framework (2023), Core Strategy (2007) Policies KP1 and KP2 and Policy DM14 of the Development Management Document (2015).

 

15 Notwithstanding the provisions of Class A of Part 1 of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any statutory amendment, modification or re-enactment or replacement thereof (as the case may be) for the time being in force), no extensions shall be erected at the dwelling hereby approved at any time without express planning permission being granted.

 

Reason: To allow consideration of impacts on neighbouring occupiers, in the interests of neighbour amenities, further to the National Planning Policy Framework (2023), Policies KP2 and CP4 of the Southend-on-Sea Core Strategy (2007), Policies DM1 and DM3 of the Southend-on-Sea Development Management Document (2015) and the advice contained within the Southend-on-Sea Design and Townscape Guide (2009).

 

 

POSITIVE AND PROACTIVE STATEMENT:

 

The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including planning policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework. The detailed analysis is set out in a report on the application prepared by officers.

 

INFORMATIVES:

 

1. Please note that the development the subject of this application is liable for a charge under the Community Infrastructure Levy (CIL) Regulations 2010 (as amended) and it is the responsibility of the landowner(s) to ensure they have fully complied with the requirements of these regulations. A failure to comply with the CIL regulations in full can result in a range of penalties. For full planning permissions, a CIL Liability Notice will be issued by the Council as soon as practicable following this decision notice. For general consents, you are required to submit a Notice of Chargeable Development (Form 5) before commencement; and upon receipt of this, the Council will issue a CIL Liability Notice including details of the chargeable amount and when this is payable. If you have not received a CIL Liability Notice by the time you intend to commence development it is imperative that you contact S106andCILAdministration@southend.gov.uk to avoid financial penalties for potential failure to comply with the CIL Regulations 2010 (as amended). If the chargeable development has already commenced, no exemption or relief can be sought in relation to the charge and a CIL Demand Notice will be issued requiring immediate payment. Further details on CIL matters can be found on the Planning Portal (www.planningportal.co.uk/info/200136/policy_and_legislation/70/community_infrastructure_levy) or the Council's website (www.southend.gov.uk/cil).  

 

2. You should be aware that in cases where damage occurs during construction works to the highway in implementing this permission that Council will seek to recover the cost of repairing public highways and footpaths from any party responsible for damaging them. This includes damage carried out when implementing a planning permission or other works to buildings or land. Please take care when carrying out works on or near the public highways and footpaths in the city.

 

3. The applicant is advised they will be expected to arrange removal of the H-bar and will need to apply to the Council’s Highways Team regarding its removal so that vehicles will be able to park generally on street outside the proposed dwelling.

 

4. Future occupiers will not be eligible for a town centre or residential parking permit.

 

5. If construction works are to be considered outside of normal hours especially overnight or are expected to cause a nuisance to existing receptors it is recommended that the applicant applies for a prior consent application under section 61 of the Control of Pollution Act 1974. A consent enables the applicant to conduct the works without the worry of enforcement provided they comply with it. The applicant will have to submit details of any noisy works including type of plant and machinery to be used, proposed daily start and finish times, consultation with nearby residents and businesses and duration and time scales of the works. The applicant will need an acoustically qualified person who will be able to calculate the predicted noise levels form the operation and the impact on nearby residents and then be able to evaluate mitigation measures that can be used.

 

If the Regulatory Services Team become aware of any works that are highly likely to cause a nuisance they can serve a notice under section 60 of the Control of Pollution Act 1974 to prevent this. A breach of this will represent a criminal offence.

 

The application form and guidance are available on the Southend-on-Sea City Council website. The applicant can also contact the Regulatory Services Team at Southend-on-Sea City Council for details.

 

6. Prior to demolition of the existing building an appropriate Asbestos survey of the buildings should be undertaken and a scheme implemented to remove and safely dispose of any asbestos-containing materials in accordance with the Control of Asbestos Regulations 2012 and the applicant's/developer's Waste duty of care.

 

It is recommended that the Council's Building Control department is notified of the demolition in order that requirements can be made under section 81 of the Building Act 1984.

 

7. A UXO Preliminary Risk Assessment of the potential for unexploded ordnance at the site should be undertaken by competent person and any recommendations for further action reported to Southend-On-Sea City Council.

 

8. Biodiversity Net Gain - The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition “(the biodiversity gain condition”) that development may not begin unless:

(a) a Biodiversity Gain Plan has been submitted to the planning authority, and

(b) the planning authority has approved the plan.

 

The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan if one is required in respect of this permission would be Southend-on-Sea City Council.

 

There are statutory exemptions and transitional arrangements which mean that the biodiversity gain condition does not always apply.

 

Based on the information available this permission is considered to be one which will require the approval of a biodiversity gain plan before development is begun because none of the statutory exemptions or transitional arrangements are considered to apply.

 

If the onsite habitat includes irreplaceable habitat (within the meaning of the Biodiversity Gain Requirements (Irreplaceable Habitat) Regulations 2024) there are additional requirements for the content and approval of Biodiversity Gain Plans.

 

If planning permission is granted on an application made under section 73 of the Town and Country Planning Act 1990 (application to develop land without compliance with conditions previously attached) and a Biodiversity Gain Plan was approved in relation to the previous planning permission (“the earlier Biodiversity Gain Plan”) there are circumstances when the earlier Biodiversity Gain Plan is regarded as approved for the purpose of discharging the biodiversity gain condition subject to which the section 73 planning permission is granted.

 

Those circumstances are that the conditions subject to which the section 73 permission is granted:

i) do not affect the post-development value of the onsite habitat as specified in the earlier Biodiversity Gain Plan, and

ii) in the case of planning permission for a development where all or any part of the onsite habitat is irreplaceable habitat the conditions do not change the effect of the development on the biodiversity of that onsite habitat (including any arrangements made to compensate for any such effect) as specified in the earlier Biodiversity Gain Plan.

 

Where development is to proceed in phases Biodiversity Gain Plans are required before development may be begun (the overall plan) and required before each phase of development may be begun (phase plans).

 

09 The applicant is advised that it is expected that new trees will be included in the soft landscaping scheme required to be submitted and agreed under Condition 05.

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.