Agenda item

24/01599/FUL - 1 Hastings Road, Southend-on-Sea (Kursaal Ward)

Minutes:

Proposal: Change of use from a 6-bedroom HMO (Class C4) to a 7-bedroom HMO (Sui Generis) and erect cycle and refuse stores

Applicant: Mr Mitchell Nunn

Agent: Mrs Francelita Balbido of Town Planning Expert

 

Resolved:

 

That PLANNING PERMISSION be GRANTED subject to the following conditions:

 

01  The development hereby permitted shall begin no later than three years from the date of this decision.

 

Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.

 

02  The development shall only be undertaken in accordance with the following approved plans: 970-201, 970-101, 970-102 (Rev 01), 970-103 (Rev 05).

 

Reason: To ensure the development is carried out in accordance with the consent sought, has an acceptable design and complies with Policy DM1 of the Development Management Document (2015).

 

03  Notwithstanding the provisions of the Town and Country Planning Act 1990 (as amended) the development and use of the building as a House in Multiple Occupation (HMO), subject of this permission, shall not at any time be adapted to enable formation of more than seven (7) bedrooms and the property shall not be occupied by more than seven (7) residents at any one time. 

 

Reason: To ensure the development hereby approved would offers acceptable living conditions for its occupiers in accordance with the National Planning Policy Framework (2024), Core Strategy (2007) Policies KP2 and CP4 and Development Management Document (2015) Policies DM1, DM3 and DM8.

 

04  Prior to the first occupation of the development hereby approved full details of appropriately secure and covered cycle storage facilities for at least 7 bicycles shall be submitted to and approved in writing by the Local Planning Authority under the terms of this condition. The approved facilities shall be provided in accordance with the approved details, made available for use prior to first occupation of the development hereby approved and shall be thereafter retained as such for the lifetime of the development.

 

Reason: To ensure the provision of adequate cycle parking for future occupiers and in the interest of visual amenity in accordance with the National Planning Policy Framework (2024), Core Strategy (2007) Policies KP2, CP3 and CP4, Development Management Document (2015) Policies DM1, DM3, DM8 and DM15, and the advice contained within the National Design Guide (2021) and the Southend-on-Sea Design and Townscape Guide (2009).

 

05  Prior to the first occupation of the development hereby approved a scheme for the means of appropriately sized and covered refuse and recyclable storage facilities together with a waste management plan shall be submitted to and approved in writing by the Local Planning Authority under the terms of this condition. The agreed scheme shall be implemented and made available for use prior to the first occupation of the development hereby approved and shall be retained for such purposes at all times thereafter.

 

Reason: To ensure the provision of adequate waste, recycling and food waste storage and in the interest of visual amenity in accordance with the National Planning Policy Framework (2024), Core Strategy (2007) Policies KP2, CP3 and CP4, Development Management Document (2015) Policies DM1, DM3, DM8 and DM15, and the advice contained within the National Design Guide (2021), the Southend-on-Sea Design and Townscape Guide (2009) and the Southend-on Sea Waste Storage, Collection and Management Guide for New Developments (2019).

 

06  Prior to the first occupation of the development hereby approved details of energy efficiency and other sustainability measures to be included in the scheme, including the provision of at least 10% of the energy needs of the development hereby approved being provided from onsite renewable sources, shall be submitted to, agreed in writing by the Local Planning Authority and implemented on site in accordance with the agreed details. The energy efficiency and other sustainability measures shall be maintained for the lifetime of the development.

 

Reason: To minimise the environmental impact of the development through efficient use of resources and better use of sustainable and renewable resources in accordance with the National Planning Policy Framework (2024), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policy DM2, and the advice contained within the National Design Guide (2021) and the Southend-on-Sea Design and Townscape Guide (2009).

 

07  Prior to the first occupation of the development hereby approved the development shall incorporate water efficient design measures set out in Policy DM2 (iv) of the Development Management Document to limit internal water consumption to 105 litres per person per day (lpd) (110 lpd when including external water consumption), including measures of water efficient fittings, appliances and water recycling systems such as grey water and rainwater harvesting. The water efficient design measures shall be implemented for the lifetime of the development.

 

Reason: To minimise the environmental impact of the development through efficient use of resources and better use of sustainable and renewable resources in accordance with the National Planning Policy Framework (2024), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policy DM2, and the advice contained within the National Design Guide (2021) and the Southend-on-Sea Design and Townscape Guide (2009).

 

08  Hours of works associated with this permission shall only be 8am - 6pm Monday to Friday, 8am - 1pm Saturday. No works shall be carried out on Sundays or Bank or Public Holidays.

 

Reason: In the interests of residential amenity and to ensure that the development complies with the National Planning Policy Framework (2024), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1 and DM3 and advice in the Southend-on-Sea Design and Townscape Guide (2009).

 

09  Notwithstanding the approved plans within the first available planting season (October to March inclusive) following the first occupation of the development hereby approved, a soft landscaping scheme for the front of the site shall be implemented in accordance with details which have previously been submitted to and approved in writing by the Local Planning Authority under the provisions of this condition. The soft landscaping scheme shall be implemented, completed and maintained thereafter in full accordance with the approved details.

 

Reason: In the interest of visual amenity in accordance with the National Planning Policy Framework (2024), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1 and DM3, and the advice contained within the National Design Guide (2021) and the Southend-on-Sea Design and Townscape Guide (2009).

 

Informatives

 

1.  You are advised that as the development equates to less than 100sqm of new floorspace the development benefits from a Minor Development Exemption under the Community Infrastructure Levy Regulations 2010 (as amended) and as such no charge is payable. See www.southend.gov.uk/cil for further details about the Levy.

 

2.  You should be aware that in cases where damage occurs during construction works to the highway in implementing this permission that Council will seek to recover the cost of repairing public highways and footpaths from any party responsible for damaging them. This includes damage carried out when implementing a planning permission or other works to buildings or land. Please take care when carrying out works on or near the public highways and footpaths in the city.

 

3.  Future occupiers will not be eligible for a town centre or residential parking permit.

 

4.  The applicant should check the room layout of existing rooms that will be above or below the proposed and ensure that the stacking arrangement compliments this. If this is not the same as those proposed in the application additional sound insulation may be required in the ceiling in order to protect against noise from the normal use of the dwellings in the block due to conflicting activities e.g. sleep and living spaces. The applicant should be aware of this as should complaints arise when it is occupied because of this Southend-On-Sea City Council cannot require action under other primary legislation it has i.e. for statutory nuisance.

 

Positive and Proactive Statement

 

The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including planning policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework. The detailed analysis is set out in a report on the application prepared by officers.

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.