Agenda item

17/00563/OUTM - 939 - 953 London Road, Leigh on Sea (Blenheim Park Ward)

Minutes:

Proposal:  Demolish existing building and erect two blocks part 2, part 3, part 4 storey comprising of 30 flats, 1 commercial unit on ground floor  lay out parking, refuse and cycle stores (Outline Application) (Amended Proposal)

Applicant:  EMEX International

Agent:  Third Dimension Architectural Group Ltd.

 

Resolved: 

 

(a) That the Deputy Chief Executive (Place), Director of Planning and Transport or Group Manager of Planning and Building Control be DELEGATED to GRANT OUTLINE PLANNING PERMISSION subject to completion of a PLANNING AGREEMENT UNDER SECTION 106 of the Town and Country Planning Act 1990 (as amended) and all appropriate legislation to secure the provision of:

 

  Provision of 6 affordable housing units (comprising of 1x1bed, 3x2bed and 2x3bed, and including 4 affordable rented units and 2 shared ownership units) prior to occupation of the 10th dwelling

 

  A financial contribution towards secondary education provision of £88,728.77 (index-linked), specifically providing increased capacity at Belfairs Academy, which is payable prior to commencement

 

(b)  That the Deputy Chief Executive (Place), Director of Planning and Transport or the Group Manager (Planning & Building Control) be authorised to determine the application upon completion of the above obligation, so long as planning permission when granted and the obligation when executed, accords with the details set out in the report submitted and the conditions listed below:

 

01  Details of the appearance and landscaping (hereinafter called the "Reserved Matters") of the development shall be submitted to and approved in writing by the Local Planning Authority before any development begins and the development shall be carried out as approved. Application for approval of the reserved matters shall be made to the Local Planning Authority not later than 3 (three) years from the date of this permission. The development hereby permitted shall begin not later than 2 (two) years from the date of approval of the last of the reserved matter to be approved.

 

Reason:  Required to be imposed pursuant to Section 92 of the Town and Country Planning Act 1990 (as amended) and because the application is for outline planning permission only and the particulars submitted are insufficient for consideration of details mentioned.

 

02  The development hereby permitted shall be carried out in accordance with the approved plans 100 Location Plan; 201 Proposed site plan; 105 Existing Floor Plans; 106 Existing Elevations; 201 Indicative Streetscenes; 202A Indicative Basement and Ground Floor plans; 202 Indicative First and Second Floorplans; 204 Indicative Third and Fourth Floor plans.

 

Reason: To ensure that the development is carried out in accordance with the policies in the development plan.

 

03  Details of the external materials to be used in the construction of the development hereby approved shall be submitted to the Local Planning Authority concurrently with the Reserved Matters application. The development shall only be implemented in accordance with the approved materials unless otherwise agreed in writing by the Local Planning Authority.

 

Reason:  In the interests of visual amenity and to ensure that the appearance of the building makes a positive contribution to the character and appearance of the area.  This is as set out in the National Planning Policy Framework (NPPF), Development Plan Document 1 Southend on Sea Core Strategy 2007 policy KP2 and CP4; Development Plan Document 2 Southend on Sea Development Management 2015 policy DM1, and SPD1 (Design and Townscape Guide) 2009.

 

04  No development approved by this permission shall be commenced until the Local Planning Authority has approved in writing a full scheme of highway works (including detailed designs and contract details) and the relevant highways approvals are in place, in relation to loading bay on London Road.  

 

The works shall thereafter be undertaken in accordance with the approved details and completed prior to occupation of the hotel hereby approved unless otherwise agreed in writing by the local planning authority.

 

Reason: In the interests of highways management and safety in accordance with (Core Strategy) DPD1 policy KP2, CP3, CP4; (Development Management) DPD2 policy DM15 and the Design and Townscape Guide.

 

05  No dwelling shall be first occupied until one parking space to serve that dwelling and four disabled spaces have been laid out, together with properly constructed vehicular access to the adjoining highway, all in accordance with details which shall have been submitted to and approved by the local planning authority, such provision to be permanently reserved for the parking of vehicles of occupiers and callers to the property and not used for any other purpose whether or not permitted by the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking or re-enacting that order).

 

Reason: To make provision for parking off the highway, in the interests of highway and pedestrian safety and to safeguard the character and amenities of the area in accordance with Policy CP3 of the Core Strategy DPD1, DPD2 (Development Management) policy DM15 and the Design and Townscape Guide.

 

06  The commercial premises shall not be occupied until twenty four parking space to serve commercial unit have been laid out, together with properly constructed vehicular access to the adjoining highway, all in accordance with details which shall have been submitted to and approved by the local planning authority, such provision to be permanently reserved for the parking of vehicles of occupiers and callers to the property and not used for any other purpose whether or not permitted by the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking or re-enacting that order).

 

Reason: To make provision for parking off the highway, in the interests of highway and pedestrian safety and to safeguard the character and amenities of the area in accordance with Policy CP3 of the Core Strategy DPD1, DPD2 (Development Management) policy DM15 and the Design and Townscape Guide.

 

07  Details of waste and cycle storage to be provided at the site shall be submitted to the Local Planning Authority concurrently with the Reserved Matters application. The waste and cycle storage shall be implemented in accordance with the approved details before the development is occupied and shall be retained in perpetuity thereafter.

 

Reason:  To ensure that satisfactory secure off-street bicycle parking is provided to promote sustainable transport and to protect the environment and provide suitable storage for waste and materials for recycling in accordance with Development Plan Document: Southend on Sea Core Strategy 2007 policies KP2, CP3 and CP4: Southend on Sea Development Plan Document 2 Development Management 2015 policies DM1 and DM15, and Supplementary Planning Document 1 (Design and Townscape Guide) 2009.

 

08  A scheme detailing how at least 10% of the total energy needs of the development will be supplied using on site renewable sources shall be submitted concurrently with the Reserved Matters application and be implemented in full in accordance with the approved details prior to the first occupation of the flats. This provision shall be made for the lifetime of the development.

 

Reason:  In the interests of providing sustainable development in accordance with Development Plan Document 1 Southend on Sea Core Strategy 2007 Policy KP2; Development Plan Document 2 Southend on Sea Development Management Document Policy DM2 (2015).

 

09  No development shall take place until details of the implementation, maintenance and management of a scheme for surface water drainage works (incorporating Sustainable Urban Drainage (SuDs) Principles have been submitted to and approved by the local planning authority. The scheme shall be implemented and thereafter managed in accordance with the approved details before the development is occupied and brought into use and be maintained as such thereafter. Those details shall include:

 

i)   An investigation of the feasibility of infiltration SUDS as the preferred approach to establish if the principles of any infiltration based surface water drainage strategy are achievable across the site, based on ground conditions.  Infiltration or soakaway tests should be provided which fully adhere to BRE365 guidance to demonstrate this.  Infiltration features should be included where infiltration rates allow; 

 

ii)  Drainage plans and drawings showing the proposed locations and dimensions of all aspects of the proposed surface water management scheme.  The submitted plans should demonstrate the proposed drainage layout will perform as intended based on the topography of the site and the location of the proposed surface water management features; 

 

iii)   a timetable for its implementation; and

 

iv)  a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public body or statutory undertaker, or any other arrangements to secure the operation of the sustainable drainage scheme throughout its lifetime.

 

Reason: To prevent flooding by ensuring the satisfactory storage and disposal of surface water from the site for the lifetime of the development and to prevent environmental and amenity problems arising from flooding in accordance with Policy KP2 and CP4 of the Core Strategy 2007 and area in accordance with policies  KP2 and CP4 of the Core Strategy DPD1 and Policy DM2 of the Development Management DPD 2015.

 

10  Details of the water efficient design measures set out in Policy DM2 (iv) of the Development Management Document to limit internal water consumption to 105 litres per person per  day  (lpd)  (110  lpd  when  including  external  water consumption), including measures of water efficient fittings, appliances and water recycling systems such as grey water and rainwater harvesting, shall be submitted to and agreed in writing by the Local Planning Authority prior to commencement of the development hereby approved.  The approved details shall be implemented in full prior to the first occupation of the development. This provision shall be made for the lifetime of the development.

 

Reason:  To minimise the environmental impact of the development through efficient use of water in accordance with the National Planning Policy Framework, Development Plan Document 1: Southend on Sea Core Strategy policy KP2, Development Plan Document 2: Southend on Sea Development Management Document policy DM2 (2015) and SPD1 (Design and Townscape Guide) 2009.

 

11  No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to, and approved in writing by, the local planning authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide, amongst other things, for:

 

i)  the parking of vehicles of site operatives and visitors

ii)  loading and unloading of plant and materials

iii)  storage of plant and materials used in constructing the development

iv)  the erection and maintenance of security hoarding 

v)  measures to control the emission of dust and dirt during construction

vi)  a scheme for recycling/disposing of waste resulting from demolition and construction works that does not allow for the burning of waste on site.

 

Reason: In the interests of visual amenity and the amenities of occupiers and to ensure a satisfactory standard of landscaping pursuant to Policy CP4 of the Core Strategy DPD1 with CP4 of the Core Strategy DPD1 and Policy DM1 of the Development Management DPD 2015.

 

12  Details of any external lighting to be installed in the development shall be submitted to and approved in writing by the local planning authority before the development is occupied or brought into use.  Development shall be carried out in accordance with the approved details before the development is occupied or brought into use.  No additional external lighting shall be installed on the building without the consent of the Local Planning Authority. 

 

Reason: In the interest of the visual amenities and character of the area, and to protect the amenities of surrounding occupiers in accordance with policies  KP2 and CP4 of the Core Strategy DPD1 and with CP4 of the Core Strategy DPD1 and Policies DM1 of the Development Management DPD 2015.

 

13  The commercial units, hereby permitted, shall only be used for the purposes falling with Class A1, A2, B1 (a), D2 (gym) of the Schedule to the Town and Country Planning (Use Classes) Order, unless otherwise agreed in writing by the Local Planning Authority.

 

Reason: To safeguard the character and amenities of the area and in particular to protect the amenities of nearby residential properties and the employment provision within the borough, in accordance with Policy CP1 of the Core Strategy, DPD2 (Development Management Document) 2015 policy DM10 and DM11.

 

14  Details of the proposed hours and days of opening in conjunction with A1, A2, B1 (a), D2 (gym) and Class uses shall be submitted to and approved in writing prior to occupation of each unit respectively. Thereafter the A1, A2, B1 (a), D2 (gym) uses shall be operated only in accordance with the approved hours of opening.

 

Reason: To safeguard the character and amenities of the area and in particular to protect the amenities of nearby residential properties in accordance with DPD2 (Development Management Document) 2015 policy DM1.

 

15  No dust or fume extraction or filtration equipment, or air conditioning, ventilation or refrigeration equipment shall be installed until full details of its design, siting, discharging points and predicted acoustic performance have been submitted to and approved by the local planning authority. The equipment as installed shall be retained in good working order at all times thereafter. The development shall only be implemented in accordance with the approved details.

 

Reason: To safeguard the character and amenities of the area and in particular to protect the amenities of nearby residential properties and the employment provision within the borough, in accordance with DPD2 (Development Management Document) 2015 policy DM1.

 

16  Before the development is occupied or brought into use, the development hereby approved shall be carried out in a manner to ensure that 3 of the flats hereby approved comply with building regulation M4 (3) ‘wheelchair user dwellings’ and the remaining 27 flats comply with building regulation part M4(2) ‘accessible and adaptable dwellings’.

 

Reason: To ensure the residential units hereby approved provides high quality and flexible internal layouts to meet the changing needs of residents in accordance with National Planning Policy Framework, DPD1 (Core Strategy) policy KP2, DPD2 (Development Management Document) policy DM2 and SPD1 (Design and Townscape Guide).

 

17  Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any order revoking, re-enacting or modifying that Order), no structures such as canopies, fences, loggias, trellises or satellite or radio antennae shall be installed within the development or on the buildings hereby approved unless otherwise previously agreed in writing by the Local Planning Authority. 

 

Reason: In order to protect the character and visual amenities of the development and surrounding area and airport safety in accordance with policies KP2 and CP4 of the Core Strategy DPD1 and Policy DM1 of the Development Management DPD 2015.

 

18  Demolition or construction works associated with this permission shall not take place outside 08:00 hours to 18:00hours Mondays to Fridays and 08:00hours to 13:00hours on Saturdays and at no time Sundays or Bank Holidays.

 

Reason: In order to protect the amenities of occupiers of the development surrounding occupiers and to protect the character the area in accordance with policies KP2 and CP4 of the Core Strategy DPD1 and Policies DM1 and DM3 of the Development Management DPD 2015.

 

19  No development shall take place until a site investigation of the nature and extent of contamination has been carried out in accordance with a methodology which has previously been submitted to and approved in writing by the local planning authority. The results of the site investigation shall be made available to the local planning authority before any development begins. If any contamination is found during the site investigation, a report specifying the measures to be taken to remediate the site to render it suitable for the development hereby permitted shall be submitted to and approved in writing by the local planning authority. The site shall be remediated in accordance with the approved measures before development begins. If, during the course of development, any contamination is found which has not been identified in the site investigation, additional measures for the remediation of this source of contamination shall be submitted to and approved in writing by the local planning authority. The remediation of the site shall incorporate the approved additional measures. 

 

Reason: To ensure that any contamination on the site is identified and treated so that it does not harm anyone who uses the site in the future, and to ensure that the development does not cause pollution to Controlled Waters in accordance with DPD1 (Core Strategy) 2007 policy KP2 and Policies DM1 and DM14 of the Development Management DPD 2015

 

20  The development shall comprise: 5 x 1 bed units, 7 x 2 bed units, 12 x 3 bed units, and 6 x 4 bed units. 

 

Reason: To ensure that the  development provides  a range of dwelling types and a sustainable housing mix  in order to meet the housing needs of the Borough in accordance with Policies KP2 and CP8 of the Core Strategy and Policy DM7 of the Development Management DPD.

 

21  The gross internal floorspace of the A1, A2, B1, D2 (gym) development hereby approved shall not exceed 375 sqm. The gross internal   floorspace of residential development hereby approved shall not exceed 3005sqm.

 

Reason: To determine the scope of this permission in accordance with the Development Plan.

 

Informatives

 

01  Please note that the proposed development subject of this application is liable for a charge under the Community Infrastructure Levy Regulations 2010 (as amended). The amount of levy due will be calculated at the time the reserved matters application is submitted. Further information about CIL can be found on the Council's website at www.southend.gov.uk/cil

 

02  This permission is governed by a legal agreement between the applicant and the Borough Council under Section 106 of the Town and Country Planning Act 1990.  The agreement relates to affordable housing provision and an education contribution.

 

03  In relation to Condition 4, you are advised to contact Highways Engineer – Martin Warren (Tel: 01702 534328) to discuss the requisite Highways Licence, and costs of associated works. You are advised that a Highways Licence needs to be in place before any works are carried out to the public highway and you will need to employ a Council approved contractor to carry out any works.

 

(c)  In the event that the planning obligation referred to in part (a) above has not been completed by 1st September 2017 or an extension of this time as may be agreed by the Deputy Chief Executive (Place), Director of Planning and Transport or Group Manager (Planning & Building Control) be authorised to refuse planning permission for the application on the grounds that the development will not provide for affordable housing or education provision. As such, the proposal would be contrary to Policies KP2, KP3, CP6 and CP8.

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.