Agenda item

20/01227/OUTM - Land Between Barge Pier Road and Ness Road (Shoeburyness Ward)

Minutes:

Proposal:  Erect up to 214 residential units (Use Class C3), provision of a new health centre up to 1000sqm (Use Class D1), up to 400sqm of retail floorspace (Use Class A1-A3), land raising, all associated car parking, new foot and cycle paths, public open space, landscaping and ancillary works and infrastructure, install vehicular access off Barge Pier Road, New Garrison Road and Magazine Road (Outline Application)

Applicant:  Mr Paul Denney Wilkinson

Agent:  Mrs Claire Wilkinson of Lanpro Services

 

Mr Coomber, a local resident, spoke as an objector to the application.  Mr Denney, responded on behalf of the applicants.

 

Resolved:-

 

(a)  That the Interim Director of Planning or Group Manager of Planning & Building Control be DELEGATED to GRANT PLANNING PERMISSION subject to the following conditions and following the completion of a PLANNING AGREEMENT under SECTION 106 of the TOWN AND COUNTRY PLANNING ACT 1990 (as amended) to secure the provision of:

 

  30% units of affordable housing on site (65 units) – with a 60/40 tenure split (39 social/affordable rent and 26 intermediate units). 

  £493,000.40 contribution towards secondary education.

  Essex RAMS payment of £26,874.12 to mitigate the potential disturbance to European designated sites.

  £30,000 highways contribution towards Campfield Road/Ness Road junction improvements.

  Monitoring fee £10,000

 

(b)  The Interim Director of Planning or the Group Manager (Planning & Building Control) be authorised to determine the application upon completion of the above requirement, so long as planning permission when granted and, where it is used, the obligation when executed, accords with the details set out in the report submitted and the conditions listed below:

 

General Conditions

 

01  Details of the appearance, layout and scale (hereinafter called the "reserved matters") shall be submitted to and approved in writing by the Local Planning Authority before any development begins and the development shall be carried out as approved under the reserved matters. Application for approval of the reserved matters shall be made to the Local Planning Authority not later than 3 (three) years from the date of this permission. The development hereby permitted shall begin not later than 2 (two) years from the date of approval of the last of the reserved matters to be approved.

 

Reason: Required to be imposed pursuant to Section 92 of the Town and Country Planning Act 1990 (as amended) and because the application is for outline planning permission only and the particulars submitted are insufficient for consideration of details mentioned.

 

02  No development, other than site preparation works and any works required to comply with requirements of other conditions on this permission, shall take place on site until a phasing plan has been submitted to and approved in writing by the local planning authority. Following approval of the plan, each phase shall be completed in accordance with the plan before the next phase commences.

 

Reason: To ensure a coordinated development that complies with the National Planning Policy Framework (NPPF) and the requirements of the local development plan.

 

03  The development shall be carried out in accordance with the approved parameter plans which set out the parameters for the heights and levels of the development, the locations of the different uses across the site, the landscaping and the access and movement arrangements for the site: 032-S2-P403-E, 032-S2-P402-E, 032-S2-P401-D, 032-S2-P001-C, 2166-00-20-B.

 

Reason: To ensure the development is carried out in accordance with the development plan.

 

04  The development hereby approved shall include no more than 214 dwellings, no more than 1,000sqm health centre (Use Class D1) and no more than 400sqm of commercial floorspace (Use Classes A1, A2 or A3).

 

Reason: To define the scope of the permission and to ensure that the development meets the requirements of the Development Plan.

 

Design and Heritage related conditions

 

05  Notwithstanding the details shown on the plans submitted and otherwise hereby approved the development hereby permitted shall not commence, other than for groundworks and site preparation works, unless and until full details and appropriately sized samples of the materials to be used for all the external surfaces of the proposed buildings at the site including facing materials, roof detail, windows (including sections, profiles and reveals), doors, balustrading, fascia and balconies have been submitted to and approved in writing by the local planning authority. The works must then be carried out in full accordance with the approved details before the dwellings or non-residential parts of the development hereby approved are first occupied or brought into use.

 

Reason: To safeguard character and appearance of the area and the visual amenities of neighbouring occupiers in accordance with Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1 and DM3 of the Development Management Document (2015) and the Design and Townscape Guide (2009).

 

06  Notwithstanding the details shown in the plans submitted and otherwise hereby approved none of the buildings hereby granted planning permission shall be occupied unless and until plans and other appropriate details are submitted to the Local Planning Authority and approved in writing which specify the size, design, obscurity,  materials and location of all privacy screens to be fixed to the proposed buildings. Before a building hereby approved is occupied the building shall be implemented in full accordance with the details and specifications approved under this condition and shall be permanently retained as such thereafter.

 

Reason: In the interests of the residential amenity of adjoining residents and the character and appearance of the area and to ensure that the development complies with the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1 and DM3 and the Design and Townscape Guide (2009).

 

07  Notwithstanding the information submitted with the application, no development other than moving of on-site spoil heaps, shall be undertaken, unless and until a field investigation including a programme of archaeological recording and analysis, a watching brief and details of the measures to be taken should any archaeological finds be discovered, has been submitted to and approved in writing by the local planning authority. The approved recording/watching brief and measures are to be undertaken throughout the course of the works affecting below ground deposits and are to be carried out by an appropriately qualified archaeologist. The subsequent recording and analysis reports shall be submitted to the local planning authority before the development is brought into first use.

 

Reason: Required to allow the preservation by record of archaeological deposits and to provide an opportunity for the watching archaeologist to notify all interested parties before the destruction of any archaeological finds in accordance with the National Planning Policy Framework (2019) and Policy DM5 of the Development Management Document (2015).

 

08  No development above ground level shall be undertaken unless and until details of existing and proposed site levels at and surrounding the site have been submitted to and approved in writing by the local planning authority. The development shall be undertaken and completed at the levels indicated on the approved drawing.

 

Reason: In the interests of the residential amenity of adjoining residents and the character and appearance of the area and to ensure that the development complies with the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1 and DM3 and the Design and Townscape Guide (2009).

 

Construction related conditions

 

09  No development shall take place, including any works of demolition, unless and until a Demolition and Construction Management Plan and Strategy to include Noise and Dust Mitigation Strategies has been submitted to, and approved in writing by the local planning authority. The approved Demolition and Construction Management Plan and Strategy shall be adhered to in full throughout the construction period. The Statement shall provide, amongst other things, for:

 

i)  the parking of vehicles of site operatives and visitors

ii)  loading and unloading of plant and materials

iii) storage of plant and materials used in constructing the development

iv)  the erection and maintenance of security hoarding 

v)  measures to control the emission of dust, dirt and noise during construction

vi)  a scheme for recycling/disposing of waste resulting from construction works that does not allow for the burning of waste on site.

vii)  a dust management plan to include mitigation and boundary particulate monitoring during demolition and construction. 

viii)  details of the duration and location of any noisy activities.

 

Reason: This is required in the interests of the amenities of nearby and surrounding occupiers pursuant to Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1 and DM3 of the Development Management Document (2015).

 

10  Demolition or construction works associated with this permission shall not take place outside 08:00 hours to 18:00 hours Mondays to Fridays and 08:00hours to 13:00hours on Saturdays and at no time on Sundays or Bank Holidays.

 

Reason: In order to protect the amenities of surrounding occupiers and to protect the character the area in accordance with Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

Landscaping and ecology conditions

 

11 Notwithstanding the details shown on the plans hereby approved no development shall take place, other than ground and site preparation works, unless and until there has been submitted to and approved in writing by the Local Planning Authority a scheme of hard and soft landscaping for the site and a landscaping phasing plan setting out the timescales for the implementation of the hard and soft landscaping.

 

This shall include full details of the number, size and location of the trees and shrubs to be planted together with a planting specification, details of measures to enhance biodiversity within the site; details of the treatment of all hard and soft surfaces, including any earthworks to be carried, all means of enclosing the site and full details of the play equipment, benches and associated facilities proposed.

 

All landscaping in the approved landscaping scheme shall be carried out in accordance with the timescales specified in the approved landscaping phasing plan.  Any shrubs dying, removed, being severely damaged or becoming seriously diseased within five years of planting shall be replaced with trees or shrubs of such size and species as may be agreed with the Local Planning Authority.

 

Reason: In the interests of visual amenity, biodiversity and the amenities of occupiers and to ensure a satisfactory standard of landscaping pursuant to Policies KP2 and CP4 of the Core Strategy, Policies DM1 and DM3 of the Development Management Document (2015) and the Design and Townscape Guide (2009).

 

12  All of the landscaped areas and open space including play equipment, benches and associated facilities hereby approved shall be provided prior to the first occupation of any part of the phase of the development hereby approved they fall within and shall be retained and maintained in perpetuity for the occupants of the development and the wider community.

 

Reason: in the interests of amenity in accordance with the National Planning Policy Framework (2019) and Policies KP2 and CP4 of the Core Strategy, Policies DM1 and DM3 of the Development Management Document (2015) and the Design and Townscape Guide (2009).

 

13  The development hereby approved shall be implemented and operated thereafter in strict accordance with the biodiversity mitigation measures outlined at paragraph 8.7.2 of the Environmental Statement which includes mitigation in relation to habitats, rare plants, amphibians, reptiles, breeding birds, badgers, mammals and bats. Prior to the commencement of the development, other than for demolition and site preparation works, a timescale for the implementation of these measures shall be submitted to the Local Planning Authority and approved in writing. The measures shall be implemented in accordance with the approved timescale.

 

Reason: In the interest of biodiversity in accordance with National Planning Policy Framework (2019) and Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

14  The development hereby approved shall be implemented and operated thereafter in strict accordance with the findings, recommendations and mitigation measures of the Breeding Bird Survey by D F Clark Bionomique Ltd dated 23 July 2020 ref. DFCP 3398 including the mitigation measures outlined at paragraph 6.5 of the report.

 

Reason: In the interest of biodiversity in accordance with National Planning Policy Framework (2019) and Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

15  The development hereby approved shall be implemented and operated thereafter in accordance with the findings, recommendations and mitigation measures of the Great Crested Newt and Mammal Report by D F Clark Bionomique Ltd dated 23 July 2020 ref. DFCP 3398 including the mitigation measures outlined at Chapter 6 of the report.

 

Reason: In the interest of biodiversity in accordance with National Planning Policy Framework (2019) and Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

16  The development hereby approved shall be implemented in strict accordance with the ecological enhancement measures outlined at paragraphs 8.7.6, 8.7.7 and 8.7.8 of the Environmental Statement. Prior to the commencement of the development, other than for demolition and site preparation works, a timescale for the implementation of these measures shall be submitted to the Local Planning Authority and approved in writing. The measures shall be implemented in accordance with the approved timescale.

 

Reason: In the interest of biodiversity in accordance with National Planning Policy Framework (2019) and Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

17  The development hereby approved shall be implemented and operated thereafter in strict accordance with the findings, recommendations and mitigation measures contained within the Botany reports submitted, including the mitigation at paragraph 5.2 of the Botany Survey by D F Clark Bionomique Ltd dated 8 June 2020 ref. DFCP 3398 and the mitigation and avoidance measures outlined in chapter 5 of the Botanical Survey by The Landscape Partnership dated 28 July 2020 ref. E20841.

 

Reason: In the interest of biodiversity in accordance with National Planning Policy Framework (2019) and Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

Trees

 

18  The development hereby approved shall be undertaken in strict accordance with the findings, recommendations and conclusions of the Arboricultural Impact Assessment by D F Clark Bionomique Ltd dated 27 May 2020 ref DFCP 3398 including the mitigation outlined within Chapter 5 and the Tree Protection Plans included in Appendix 5 of the report ref. DFCP 3398 TPP (1 of 5, 2 of 5, 3 of 5, 4 of 5 and 5 of 5).

 

Reason: In the interests of the character and appearance of the area and to ensure that the development complies with the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1 and DM3 and the Design and Townscape Guide (2009).

 

Parking and highway conditions

 

19  The onsite car parking spaces comprising 210 spaces for the flats, and 198 spaces for houses hereby approved shall be provided and made available for use in full accordance with drawing 032- S2-P003 Rev. H, prior to first occupation of any part of the phase of the development hereby approved they fall within, together with properly constructed vehicular access to the adjoining highway, all in accordance with the approved plans. The parking spaces shall be permanently maintained thereafter solely for the parking of occupiers of and visitors to the development.

 

19a The onsite car parking spaces comprising 16 spaces for the commercial (Class A1, A2 and A3) uses and 78 spaces for the Health Centre (Class D1) use hereby approved shall be provided and made available for use in full accordance with drawing 032- S2-P003 Rev. H, prior to first occupation of any part of the phase of the development hereby approved they fall within, together with properly constructed vehicular access to the adjoining highway, all in accordance with the approved plans. The parking spaces shall be permanently maintained thereafter solely for the parking of occupiers of and visitors to the development.

 

Reason: To ensure that adequate car parking is provided and retained to serve the development in accordance with Policy DM15 of the Council’s Development Management Document (2015) and Policy CP3 of the Core Strategy (2007).

 

20  The development shall not be first occupied or brought into first use unless and until full details of the covered and secure cycle parking to serve the health centre, commercial and residential parts of the development hereby approved have been submitted to and approved in writing by the local planning authority. Each building in the development shall be carried out in accordance with those approved details before the building is first occupied or brought into first use and the development shall be retained as such in perpetuity.

 

Reason: To ensure that adequate cycle parking is provided and retained to serve the commercial development in accordance with Policies KP2 and CP3 of the Core Strategy (2007) and Policies DM1 and DM15 of the Development Management Plan (2015).

 

21  The approved Travel Plan (ref. Travel Plan dated July 2020 ref. IT1971TPF_22.07.20_Issued) shall be fully implemented prior to first use of the development hereby approved and be maintained thereafter in perpetuity. For the first three years at the end of each calendar year a document setting out the monitoring of the effectiveness of the Travel Plan and setting out any proposed changes to the Plan to overcome any identified issues and timescales for doing so must be submitted to and approved in writing by the local planning authority. The agreed adjustments shall be implemented in accordance with the agreed conclusions and recommendations.

 

Reason: In the interests of sustainability, accessibility, highways efficiency and safety, residential amenity and general environmental quality in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2, CP3 and CP4, Development Management Document (2015) Policy DM15, and Design and Townscape Guide (2009).

 

22  Notwithstanding the details shown on the plans submitted and otherwise hereby approved, the development hereby permitted shall not be first occupied unless and until a car park management plan has been submitted to and approved in writing by the local planning authority. The car park management plan must be implemented in full accordance with the details approved under this condition prior to first occupation of any part of the phase of the development hereby approved they fall within and shall be maintained as such in perpetuity.

 

Reason: To ensure that adequate car parking arrangements are provided to serve the development in accordance with Policy DM15 of the Council’s Development Management Document (2015) and Policy CP3 of the Core Strategy (2007).

 

23  Prior to the first occupation of any dwelling, details for the Residential Travel Packs shall be submitted to and approved in writing by the local planning authority. The approved travel packs shall then be provided to each dwelling within 1 month of occupation. 

 

Reason: In the interests of sustainability in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2, CP3 and CP4, Development Management Document (2015) Policy DM15, and Design and Townscape Guide (2009).

 

Waste Management 

 

24  No part of the commercial (Classes A1-A3) or Health Centre (Class D1) uses hereby approved, shall be brought into first use unless and until a waste management plan which includes full details of refuse and recycling storage and servicing arrangements has been submitted to and agreed in writing by the Local Planning Authority. The waste management and servicing of the development shall be carried out solely in accordance with the approved details from the first use of the development.

 

Reason: To ensure that the development is satisfactorily serviced and that satisfactory waste management is undertaken in the interests of highway safety and visual amenity and to protect the character of the surrounding area, in accordance with Policies KP2 and CP3 of the Core Strategy (2007) and Policy DM15 of the Development Management Document (2015) and Design and Townscape Guide (2009).

 

25  The residential dwellings hereby approved shall not be first occupied unless and until full details of the refuse and recycling stores have been submitted to and approved in writing by the local planning authority. The approved refuse and recycling stores shall be provided in accordance with the approved plans and details and shall be made available for use prior to the first occupation of the dwelling to which they relate and shall be retained as such in perpetuity.

 

Reason: To ensure that the development provides adequate refuse and recycling facilities in the interests of highway safety and visual amenity and to protect the character of the surrounding area, in accordance with Policies KP2 and CP3 of the Core Strategy (2007) and Policy DM15 of the Development Management Document (2015) and Design and Townscape Guide (2009).

 

Flood and Drainage conditions

 

26  Before any phase of the development hereby approved is occupied or brought into use that phase shall have been implemented and undertaken in strict accordance with the findings, recommendations and mitigation measures, including within Chapter 5, and including the minimum floor levels as set out within Chapter 5 (no habitable accommodation below 6.50m Above Ordinance Datum (AOD)) and the resilience measures as outlined within parts 5.30, 5.31, 5.32 and 5.33 of the submitted Flood Risk Assessment by Ardent ref.185320-01B dated July 2020. All less vulnerable uses (non-living residential apartment space and commercial) finished floor levels, to be set at a minimum level of 3.0m AOD. For more vulnerable uses (living and sleeping accommodation – residential and health centre) minimum finished floor levels to be set at 6.5m AOD.

 

Reason: To ensure the approved development is safe and does not increase flood risk elsewhere in accordance with National Planning Policy Framework (2019), Core Strategy (2007) Policies KP1, KP2 and KP3..

 

27  The development hereby approved shall be undertaken and operated in accordance with the Flood Response Plan submitted by Ardent ref. 185320-08B dated July 2020 including its recommendations at Chapter 4.

 

Reason:  To ensure the approved development is safe in flood risk terms in accordance with National Planning Policy Framework (2019), Core Strategy (2007) Policies KP1, KP2 and KP3.

 

28  No drainage infrastructure associated with this consent shall be undertaken at this site unless and until full details of the drainage infrastructure and a drainage strategy have been submitted to and approved in writing by the local planning authority. The strategy submitted shall apply the sustainable drainage principles and the sustainable drainage hierarchy. Where more sustainable methods of drainage are discounted clear evidence and reasoning for this shall be included within the strategy submitted. The approved drainage infrastructure and strategy shall be implemented in full accordance with the approved scheme prior to the first occupation of any part of the phase of the development hereby approved they fall within and be retained as such thereafter.

 

Reason: To ensure satisfactory drainage of the site in accordance with Policy KP2 of the Core Strategy (2007) and Development Management Document (2015) Policy DM14.

 

29  Notwithstanding the provisions of the Town and Country Planning Act 1990 (As amended) or the Town and Country Planning (General Permitted Development)  Order 2015 (as amended), or any order revising or re-enacting that legislation with or without modification, no garages or undercroft parking areas nor any non-habitable accommodation in the scheme below a level of 6.50m AOD shall be converted into habitable accommodation at any time.

 

Reason:  To ensure the approved development is safe in flood risk terms in accordance with National Planning Policy Framework (2019), Core Strategy (2007) Policies KP1, KP2 and KP3.

 

Noise and odour related conditions

 

30  No extraction and ventilation equipment for the proposed non-residential uses hereby approved (Classes A1-A3 and D1) shall be installed until and unless full details of their location, design, appearance  and technical specifications and a report detailing any mitigation measures proposed in respect of noise and odour impacts has been submitted to, and approved in writing by, the Local Planning Authority. The installation of extraction equipment shall be carried out in full accordance with the approved details and specifications and any noise and odour mitigation measures undertaken in association with the agreed details before the extraction and ventilation equipment is brought into first use. With reference to British Standard BS4142 the noise rating level arising from all plant and extraction/ventilation equipment shall be at least 5dbB(A) below the prevailing background at 3.5 metres from the ground floor facades and 1m from all other facades of the nearest noise sensitive property with no tonal or impulsive character.

 

Reason: To protect the amenities of the occupiers from undue noise and disturbance in order to protect their amenities in accordance with Core Strategy (2007) policies KP2 and CP4, Policies DM1, DM3 and DM8 of the Development Management Document (2015) and Design and Townscape Guide (2009).

 

31  None of the commercial (Classes A1-A3) or health centre (Class D1) uses hereby approved shall be first occupied or brought into first use unless and until full details of the operating and opening times of that unit have been submitted to and approved in writing by the local planning authority. Each unit shall subsequently be operated only in full accordance with the details approved under this condition.

 

Reason:  To protect residential amenity and general environmental quality in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2 and CP4, and Policies DM1 and DM3 of the Development Management Document (2015).

 

32  Commercial refuse collection and delivery times for the development hereby approved shall not take place outside 08:00 hours to 18:00 hours Mondays to Fridays and 08:00hours to 13:00hours on Saturdays and at no time on Sundays or Bank Holidays.

 

Reason: In order to protect the amenities of surrounding occupiers and to protect the character the area in accordance with Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

Use class conditions

 

33  The commercial (Classes A1-A3) and Health Centre (Class D1) uses hereby approved, as identified on plan number 032-S2-P401 rev. F shall only be used for purposes falling within use classes A1, A2 or A3 or D1 as defined under the Town and Country Planning (Use Classes) Order 1987 (as amended) on the date this application was submitted and shall not be used for any other purpose, including any purpose permitted under amendments to the Town and Country Planning (Use Classes) Order 1987 since the application was submitted nor any change of use permitted under the Town and Country Planning (General Permitted Development) Order 2015 (as amended) or in any provisions equivalent to those in any statutory instrument revoking and re-enacting these Orders, with or without modification.

 

Reason: To ensure the development is implemented in accordance with the permission sought and to enable the Local Planning Authority to retain control of the use of the floorspace within the Use Class specified so that occupation of the premises does not prejudice amenity and wider objectives of the planning system,  in accordance with the National Planning Policy Framework (2019), Policies KP2 and CP4 of the Southend-on-Sea Core Strategy (2007) and Policies DM1 and DM3 of the Southend-on-Sea Development Management Document (2015).

 

Accessibility

 

34  No development other than site preparation works shall take place until and unless  details have been submitted to and approved in writing by the Local Planning Authority to show how at least 10% and a specified number of the dwellings will be built  in compliance with the building regulation M4(3) ‘wheelchair user dwellings’ standard with all of the remaining dwellings complying with the building regulation part M4(2) ‘accessible and adaptable dwellings’ standard. Each approved dwelling shall be constructed to comply with either building regulation M4(2) or M4(3) in accordance with the approved details prior to its first occupation.

 

Reason: To ensure the residential units hereby approved provides high quality and flexible internal layouts to meet the changing needs of residents in accordance with National Planning Policy Framework, (2012), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1, DM8 and Design and Townscape Guide (2009).

 

Lighting

 

35  No external lighting shall be installed in the development hereby approved unless it is in accordance with details that have previously been submitted to and approved in writing by the local planning authority. The ditch corridors shall not be illuminated directly or as a result of light spillage.

 

Reason: In the interest of the safety and amenities of the area, in the interests of biodiversity and to protect the amenities of surrounding occupiers in accordance with policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

36  No development above ground floor level shall be undertaken unless and until a Light Assessment has been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details in perpetuity.

 

Reason: In the interest of the safety and amenities of the area, in the interests of biodiversity and to protect the amenities of surrounding occupiers in accordance with policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

Sustainability

 

37  Prior to construction of the development hereby approved above ground floor slab level a scheme detailing how at least 10% of the total energy needs of the development will be supplied using on site renewable sources must be submitted to and agreed in writing by the Local Planning Authority. A building in the scheme shall not be occupied until it has been implemented in accordance with the details approved under this condition. This provision shall be made for the lifetime of the development.

 

Reason: In the interests of providing sustainable development and ensuring a high quality of design in accordance with Policy KP2 of the Core Strategy (2007) and the Design and Townscape Guide (2009).

 

38  Prior to construction of the development hereby approved above ground floor slab level details of the water efficient design measures set out in Policy DM2 (iv) of the Development Management Document to limit internal water consumption to 105 litres per person  per  day  (lpd)  (110  lpd  when  including  external  water  consumption), including measures of water efficient fittings, appliances and water recycling systems such as grey water and rainwater harvesting shall be included within the development and shall be submitted to and agreed in writing by the Local Planning Authority. A building in the scheme shall not be occupied until it has been implemented in accordance with the details approved under this condition and shall be retained as such in perpetuity.

 

Reason: To minimise the environmental impact of the development through efficient use of water in accordance with the National Planning Policy Framework, Core Strategy (2007) Policy KP2, Development Management Document (2015) Policy DM2 and the Councils Design and Townscape Guide (2009).

 

39  No part of the  non-residential development hereby approved shall take place above ground floor slab level until evidence that the development is registered with a BREEAM certification body and a pre-assessment report (or design stage certificate with interim rating if available) has been submitted indicating that the development can achieve Very Good BREEAM level.

 

Reason: This condition is required in the interests of providing a sustainable development, in accordance with Policies KP2 and CP4 of the Core Strategy (2007) and Policy DM2 of the Development Management Document (2015).

 

40  No part of any non-residential building hereby approved shall be first occupied unless and until a final Certificate has been issued certifying that BREEAM (or any such equivalent national measure of sustainable building which replaces that scheme) rating “Very Good” has been achieved for that building.

 

Reason: In the interests of providing a sustainable development, in accordance with Policies KP2 and CP4 of the Core Strategy (2007) and Policy DM2 of the Development Management Document (2015).

 

Contamination and associated conditions

 

41  A. Site Characterisation

No development other than site preparation works shall take place, on any of the phase of the development hereby approved they fall within, until and unless an assessment of the nature and extent of contamination has been submitted to and approved in writing by the Local Planning Authority. This assessment must be undertaken by a competent person, and shall assess any contamination on the site, whether or not it originates on the site.

 

Moreover, it must include:

 

(i) a survey of the extent, scale and nature of contamination;

(ii) an assessment of the potential risks to: human health, property, existing or proposed, including buildings, crops, livestock, pets, woodland and service lines and pipes, adjoining land, ground waters and surface waters, ecological systems, archaeological sites and ancient monuments;

 

B. Submission of Remediation Scheme

No development other than site preparations works shall take place, on any part of the phase of the development hereby approved they fall within, until and unless a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment has been submitted to and approved in writing by the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, an appraisal of remedial options, and proposal of the preferred option(s), and a timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation.

 

C. Implementation of Approved Remediation Scheme

The remediation scheme shall be implemented in accordance with the approved timetable of works. Within 3 months of the completion of measures identified in the approved remediation scheme, a validation report that demonstrates the effectiveness of the remediation carried out must be submitted to the Local Planning Authority.

 

D. Reporting of Unexpected Contamination

In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing within 7 days to the Local Planning Authority and once the Local Planning Authority has identified the part of the site affected by the unexpected contamination development must be halted on that part of the site. An assessment must be undertaken in accordance with the requirements of condition 1, and where remediation is necessary a remediation scheme, together with a timetable for its implementation, must be submitted to and approved in writing by the Local Planning Authority in accordance with the requirements of condition 2. The measures in the approved remediation scheme must then be implemented in accordance with the approved timetable. Following completion of measures identified in the approved remediation scheme a validation report must be submitted to and approved in writing by the Local Planning Authority in accordance with condition 3.

 

E. Long Term Monitoring and Maintenance

E1)  No development shall take place, on any part of the phase of the development hereby approved they fall within, until a monitoring and maintenance scheme to include monitoring the long-term effectiveness of the proposed remediation over a period of 5 years, and the provision of reports on the same must both be submitted to and approved in writing by the Local Planning Authority.

 

E2) Following completion of the measures identified in that scheme and when the remediation scheme is complete, reports that demonstrate the effectiveness of the monitoring and maintenance carried out must be submitted to the Local Planning Authority.

 

Reason: To ensure that any contamination on the site is identified and treated so that it does not harm anyone who uses the site in the future, and to ensure that the development does not cause pollution to Controlled Waters in accordance with Core Strategy (2007) policy KP2 and Policies DM1 and DM14 of the Development Management Document (2015).

 

42  The development hereby approved shall be implemented and undertaken in strict accordance with the findings and recommendations and mitigation, as outlined in Section 10 of the Unexploded Ordnance Assessment by MACC ref. 6503 V.1.0 dated 11/05/2020.

 

Reason: In the interests of the residential amenity of the area in accordance with Core Strategy (2007) policy KP2 and Policies DM1 and DM14 of the Development Management Document (2015).

 

CCTV

 

43  NO CCTV shall be installed in the development hereby approved unless in accordance with details that have previously been submitted to and approved in writing by the local planning authority.

 

Reason: To safeguard character and appearance of the area and amenities of neighbouring occupiers in accordance with Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1 and DM3 of the Development Management Document (2015) and the Design and Townscape Guide (2009).

 

Air Quality

 

44  The development hereby approved shall be implemented and undertaken in strict accordance with the findings and recommendations and mitigation, as outlined in Tables 6.1 and 6.2 of the Air Quality Assessment by WYG ref. A117624. Prior to the commencement of the development, other than for demolition and site preparation works, a timescale for the implementation of these measures and mitigation shall be submitted to the Local Planning Authority and approved in writing. The measures shall be implemented in accordance with the approved timescale.

 

Reason: In the interests of the residential amenity of the area in accordance with Core Strategy (2007) policy KP2 and Policies DM1 and DM14 of the Development Management Document (2015).

 

(c)  In the event that the planning obligation or other means of securing the financial contribution referred to in part (a) above has not been completed by 8th January 2021 or an extension of this time as may be agreed, the Interim Director of Planning or Group Manager Planning & Building Control be authorised to refuse planning permission for the application on the grounds that the development would not provide adequate mitigation for the potential disturbance to European designated site, would not provide adequate levels of affordable housing, would not provide any secondary education contributions to mitigate the development, or the necessary highways contribution contrary to National and Local planning policy.

 

INFORMATIVES

 

01  Please note that the proposed development subject of this application is liable for a charge under the Community Infrastructure Levy (CIL) Regulations 2010 (as amended). The amount of levy due will be calculated at the time a reserved matters application is submitted. Further information about CIL can be found on the Planning Portal:

(www.planningportal.co.uk/info/200136/policy_and_legislation/70/community_infrastructure_levy) or the Council's website (www.southend.gov.uk/cil).  

 

02  You should be aware that in cases where damage occurs during construction works to the highway in implementing this permission that Council may seek to recover the cost of repairing public highways and footpaths from any party responsible for damaging them. This includes damage carried out when implementing a planning permission or other works to buildings or land. Please take care when carrying out works on or near the public highways and footpaths in the Borough.

 

03  Should the applicant require roads within the development adopted the Council’s highways tea should be contacted.

 

04  Anglian Water has assets close to or crossing this site or there are assets subject to an adoption agreement. Therefore, the site layout should take this into account and accommodate those assets within either prospectively adoptable highways or public open space. If this is not practicable then the sewers will need to be diverted at the developers cost under Section 185 of the Water Industry Act 1991. or, in the case of apparatus under an adoption agreement, liaise with the owners of the apparatus. It should be noted that the diversion works should normally be completed before development can commence.

 

05  The development site is within 15m of a sewage pumping station which requires access for maintenance and will have sewage infrastructure leading to it and cannot be easily relocated. The site layout should take this into account and accommodate this infrastructure type through a necessary cordon sanitaire, through public space or highway infrastructure to ensure that no development within 15 metres from the boundary of a sewage pumping station if the development is potentially sensitive to noise or other disturbance or to ensure future amenity issues are not created.

 

06  If the developer wishes to connect to the Anglian Water sewerage network they should serve notice under Section 106 of the Water Industry Act 1991. Anglian Water will then advise them of the most suitable point of connection. Notification of intention to connect to the public sewer under S106 of the Water Industry Act Approval and consent will be required by Anglian Water, under the Water Industry Act 1991. Contact Development Services Team 0345 606 6087.

 

07  Notification of intention to connect to the public sewer under S106 of the Water Industry Act Approval and consent will be required by Anglian Water, under the Water Industry Act 1991. Contact Development Services Team 0345 606 6087.

 

08  A public sewer is shown on record plans within the land identified for the proposed development. It appears that development proposals will affect existing public sewers. It is recommended that the applicant contacts Anglian Water Development Services Team for further advice on this matter. Building over existing public sewers will not be permitted (without agreement) from Anglian Water.

 

09  Building near to a public sewer - No building will be permitted within the statutory easement width of 3 metres from the pipeline without agreement from Anglian Water. Please contact Development Services Team on 0345 606 6087.

 

10  The developer should note that the site drainage details submitted have not been approved for the purposes of adoption. If the developer wishes to have the sewers included in a sewer adoption agreement with Anglian Water (under Sections 104 of the Water Industry Act 1991), they should contact our Development Services Team on 0345 606 6087 at the earliest opportunity. Sewers intended for adoption should be designed and constructed in accordance with Sewers for Adoption guide for developers, as supplemented by Anglian Water’s requirements.

 

11  Given the scale of the development, a Prior Consent under Section 61 COPA (1974) shall be required with Regulatory Services at Southend Borough Council. Construction and Demolition shall also be undertaken in accordance with London Good Practice Guide.

 

12  The additional SuDS and drainage information that will need to be submitted as part of condition 25 includes

i. Adoptable SuDS and drainage by Anglian Water need to be in line with the ‘Design and Construction Guidance’. Evidence of the agreement in principle with Anglian Water is required to ensure that the SuDS/drainage systems will be maintained in perpetuity.

ii. A plan showing the SuDS/drainage elements managed by the different parties (SBC, Anglian Water, Management Company) to be provided.

iii. Catchment plan showing impervious and pervious areas (positively and non-positively drained) to be provided.

iv. Greenfield runoff rates are calculated for all the site area. Greenfield runoff rates should be calculated for areas positively drained (pervious or impervious). It is unclear is all areas are positively drained (pervious and pervious) into the system, but calculations and modelling suggest that only impervious areas are positively drained. Greenfield runoff will need to be re-calculated. Also, the greenfield runoff rate for the 100 year should be reduced to take into account the extra discharge of Long-Term Storage. This could have an impact on the storage requirements.

v. Long Term Storage is estimated, but it is not clear how this is going to be provided in the site (i.e. part of main attenuation feature or separate storage area).

vi. The SuDS/drainage strategy should consider the effects of submerged outfalls in the Barge Pier Ditch.

vii. Consideration should be given to un-lining system in areas of less risk of high groundwater table and pollution (incl. consideration of land contamination).

viii. Exceedance routes to be shown on plan.

ix. Phasing Plan to be provided as part of the Drainage Strategy.

x. Management of Health and Safety Risks to be provided as part of the Drainage Strategy.

xi. Construction details (including flow controls) to be provided.

xii. Management of groundwater and land drainage (from external areas and from pervious areas within the development) to be provided

xiii. Additional information in line with Detailed Drainage Design Checklist (Essex County Council).

 

13  Max development height in this area is 161.46m AOD. All aspects of the development must comply with CAP168 and EASA regulations including lighting, landscaping and renewable energy sources.

 

14  The applicant is encouraged to provide electric vehicle charging points at the site in accordance with Policy DM15 which encourages their provision wherever practical and feasible.

 

15  The applicant is advised that refuse stores should not be prominently located within the development. As such it is recommended that the refuse stores are not located to the front of the dwellings.

 

16  The Council will need to retain access across the site to maintain its land and infrastructure in perpetuity.

 

17.  No waste as part of the development shall be burnt on site. 

 

The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including planning policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework. The detailed analysis is set out in a report on the application prepared by officers

 

 

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.