Agenda item

20/02207/FUL - 315 Station Road, Westcliff-on-Sea (Chalkwell Ward)

Minutes:

Proposal: Demolish existing buildings at former hand car wash site and erect no. 4 three storey dwellings and no.2 two storey dwellings with integral garages and associated amenity space, layout landscaping and form vehicular accesses onto Station Road (Amended Proposal)

Applicant: Mr Ari Feferkom

Agent: Mr Pantazis of Redwoods Projects Ltd

 

Resolved:-  That planning permission be GRANTED subject to the following conditions:

 

01  The development hereby permitted shall be begun not later than 3 years beginning with the date of this permission.

 

Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.

 

02  The development hereby approved shall be carried out in accordance with the approved plans: E 00, E 01, P01 REV A, P02 REV A, P03, P04 REV A, P05, P06 REV A, P07, P08 REV A, P09, P10 REV A, P11, P12 REV A, P13, P14 REV A, P15, P16 REV A, P17, P18 REV B, P19 REV B, P20 REV A, P21 REV B, P22 REV A, MGS40163-3DM-01 REV A.

 

Reason: To ensure the development is carried out in accordance with the development plan.

 

03  The materials to be used on the external surfaces of the development hereby approved, including roof, walls and fenestration, shall be in accordance with the details which have previously been submitted to and approved in writing by the Local Planning Authority under the provisions of this condition or such alternative details as may be approved under the terms of this condition. The development shall be carried out solely in complete accordance with the approved details before it is brought into first use.

 

Reason: In the interest of visual amenity in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1 and DM3, and the advice contained within the National Design Guide (2019) and the Design and Townscape Guide (2009).

 

04  Within the first available planting season (October to March inclusive) following the first use of the development hereby approved, a soft landscaping scheme shall be implemented and completed in full accordance with details that have previously been submitted to and approved in writing by the Local Planning Authority. The soft landscaping scheme shall include measures to enhance the biodiversity on site, details of the species to be planted, the treatment of the ground before planting and maintenance details. It should also include details as to how the proposed planting of street trees would be achieved.

 

Within a period of five years from the completion of the development hereby approved, or from the date of the planting of any tree or any tree planted in its replacement, if any tree planted as part of the approved landscaping scheme is removed, uprooted, destroyed, dies, or becomes, in the opinion of the local planning authority, seriously damaged or defective, another tree of the same species and size as that of the original tree shall be planted in the same place or in accordance with alternative tree replacement details approved under the scope of this planning condition.

 

Reason: In the interest of visual amenity in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1 and DM3, and the advice contained within the National Design Guide (2019) and the Design and Townscape Guide (2009).

 

05  The use of the development hereby approved shall not commence until and unless a hard landscaping scheme has been carried out and implemented solely in full accordance with details which have previously been submitted to and approved in writing by the Local Planning Authority. The hard landscaping scheme shall include details of materials to be used on hardsurfacing as well as elevations and details of materials for any boundary treatment of the site, including boundaries within the site.

 

Reason: In the interest of visual amenity in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1 and DM3, and the advice contained within the National Design Guide (2019) and the Design and Townscape Guide (2009).

 

06  Notwithstanding the details submitted and otherwise hereby approved, the dwellings hereby approved shall not be brought into first use unless internal storage space in line with the nationally described space standards, at least 2.5m2 for all three-bed units and 3m2 for all four-bed units, excluding kitchen cupboards and wardrobes less than 0.72m2 in a double bedroom and 0.36m2 in a single bedroom, have first been provided and made available on site in line with details that have previously been submitted to and agreed in writing by the Local Planning Authority.

 

Reason: To ensure the development hereby approved provide high quality internal layouts to meet the needs of future residents in accordance with the National Planning Policy Framework (2019), Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1, DM3 and DM8 of the Development Management Document (2015) and the advice contained within the Design and Townscape Guide (2009), the National Housing Standards (2015) and the Technical Housing Standards Policy Transition Statement (2015).

 

07  Notwithstanding the details submitted and otherwise hereby approved, the development hereby approved shall be constructed to ensure that the dwellings comply with building regulation M4 (2) “accessible and adoptable dwellings” prior to their first occupation.

 

Reason: To ensure the development hereby approved provide high quality and flexible internal layouts to meet the changing needs of residents in accordance with the National Planning Policy Framework (2019), Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1, DM3 and DM8 of the Development Management Document (2015) and the advice contained within the Design and Townscape Guide (2009).

 

08  Notwithstanding the details submitted and otherwise hereby approved, no development above ground floor slab level shall take place until a detailed noise and vibration assessment has been submitted to and approved in writing by the Local Planning Authority. The assessment shall include noise and vibration mitigation measures where needed along with a mechanism for verification of their effectiveness on site after they have been carried out. The assessment shall also contain the details for a review mechanism. The mitigation proposed shall ensure that the rating level of noise within the internal areas determined by the procedures in British Standards BS:4142:2014, shall not exceed the safety levels advised by the World Health Organisation. The assessment shall be carried out by a suitably qualified and experienced consultant. The mitigation measures as recommended by the assessment shall be implemented in full prior to the first occupation of the dwellings and maintained on site as approved for the lifetime of the development.

 

Reason: In the interest of the living conditions of intended future occupiers of the approved development in accordance with the National Planning Policy Framework (2019), Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1 and DM3 of the Development Management Document (2015).

 

09  Notwithstanding the details shown in the plans submitted and otherwise hereby approved none of the buildings hereby granted planning permission shall be occupied unless and until plans and other appropriate details which specify the size, design, obscurity, materials and location of all privacy screens to be fixed to the proposed buildings are submitted to and approved in writing by the Local Planning Authority. Before each dwelling hereby approved is occupied the privacy screens as applicable to that dwelling shall be implemented in full accordance with the details and specifications approved under this condition and shall be permanently retained as such thereafter.

 

Reason: In the interests of the residential amenity of adjoining residents and the living conditions of future occupiers in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1, DM3 and DM8 and the Design and Townscape Guide (2009).

 

10  Demolition or construction works for the approved development on site, loading or unloading of goods or materials during demolition or construction works shall only be taken at or dispatched from the site between 8 am to 6 pm on weekdays, between 8 am and 1 pm on Saturdays and not at any time on Sundays and Public Holidays.

 

Reason: In the interest of the residential amenity of nearby occupiers in accordance with the National Planning Policy Framework (2019), Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1 and DM3 of the Development Management Document (2015).

 

11  No development shall take place, including any works of demolition, until and unless a Construction Method Statement has been submitted to, and approved in writing by, the local planning authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide, amongst other things, for: i) the parking of vehicles of site operatives and visitors ii) loading and unloading of plant and materials iii) storage of plant and materials used in constructing the development iv) the erection and maintenance of security hoarding v) measures to control the emission of noise, dust and dirt during construction vi) a scheme for recycling/disposing of waste resulting from demolition and construction works that does not allow for the burning of waste on site vii) details of drainage/surface water, including foul drainage, to ensure the proposal does not discharge onto Network Rail land viii) scaffolding ix) piling x) lighting xi) future maintenance of the site.

 

Reason: In the interest of the residential amenity of nearby occupiers and the highway and rail safety in accordance with the National Planning Policy Framework (2019), Policies KP2, CP3 and CP4 of the Core Strategy (2007), Policies DM1, DM3 and DM15 of the Development Management Document (2015).

 

12  The dwellings hereby approved shall not be occupied unless and until the parking provision shown on the approved plans P01 REV A, P02 REV A, P03, P10 REV A and P11 has been provided and made available for use on site. The parking spaces shall be retained for the lifetime of the development for the purposes of car parking solely for residents of the approved dwellings on site and their visitors.

 

Reason: To ensure the provision of adequate parking in accordance with Policy CP3 of the Core Strategy (2007) and Policies DM3, DM8 and DM15 of Development Management Document (2015).

 

13  No drainage related works shall take place or installed on site unless and until surface water drainage works have been submitted to and approved in writing by the local planning authority. The drainage works shall be carried out solely in full accordance with the approved details prior to the first occupation of the development hereby approved. Before any details are submitted to the local planning authority an assessment shall be carried out of the potential for disposing of surface water by means of a sustainable drainage system, having regard to Defra's non-statutory technical standards for sustainable drainage systems (or any subsequent version), and the results of the assessment shall have been provided to the local planning authority. Where a sustainable drainage scheme is to be provided, the submitted details shall:

i) provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site and the measures taken to prevent pollution of the receiving groundwater and/or surface waters;

ii) include a timetable for its implementation; and,

iii) provide, a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public authority or statutory undertaker and any other arrangements to secure the operation of the scheme throughout its lifetime.

 

Reason: To ensure the approved development does not increase flood risk elsewhere in accordance with National Planning Policy Framework (2019), Core Strategy (2007) Policies KP1, KP2 and KP3.

 

14  Prior to occupation of the development hereby approved details of energy efficiency and other sustainability measures to be included in the scheme, including the provision of at least 10% of the energy needs of the development hereby approved being provided from onsite renewable sources, shall be submitted to, agreed in writing by the Local Planning Authority and implemented on site in accordance with the agreed details.

 

Reason: To minimise the environmental impact of the development through efficient use of resources and better use of sustainable and renewable resources in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policy DM2, and the advice contained within the National Design Guide (2019) and the Design and Townscape Guide (2009).

 

15  The dwellings hereby approved shall incorporate water efficient design measures set out in Policy DM2 (iv) of the Development Management Document to limit internal water consumption to 105 litres per person per day (lpd) (110 lpd when including external water consumption), including measures of water efficient fittings, appliances and water recycling systems such as grey water and rainwater harvesting before they are occupied.

 

Reason: To minimise the environmental impact of the development through efficient use of resources and better use of sustainable and renewable resources in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policy DM2, and the advice contained within the National Design Guide (2019) and the Design and Townscape Guide (2009).

 

The Local Planning Authority has acted positively and proactively in determining this application by identifying matters of concern within the application (as originally submitted) and negotiating, with the Applicant, acceptable amendments to the proposal to address those concerns. As a result, the Local Planning Authority has been able to grant planning permission for an acceptable proposal, in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework. The detailed analysis is set out in a report on the application prepared by officers.

 

Informatives:

 

1.  Please note that the development which is the subject of this application is liable for a charge under the Community Infrastructure Levy (CIL) Regulations 2010 (as amended) and it is the responsibility of the landowner(s) to ensure they have fully complied with the requirements of these regulations. A failure to comply with the CIL regulations in full can result in a range of penalties. For full planning permissions, a CIL Liability Notice will be issued by the Council as soon as practicable following this decision notice. For general consents, you are required to submit a Notice of Chargeable Development (Form 5) before commencement; and upon receipt of this, the Council will issue a CIL Liability Notice including details of the chargeable amount and when this is payable. If you have not received a CIL Liability Notice by the time you intend to commence development, it is imperative that you contact S106andCILAdministration@southend.gov.uk to avoid financial penalties for potential failure to comply with the CIL Regulations 2010 (as amended). If the chargeable development has already commenced, no exemption or relief can be sought in relation to the charge and a CIL Demand Notice will be issued requiring immediate payment. Further details on CIL matters can be found on the Planning Portal (www.planningportal.co.uk/info/200136/policy_and_legislation/70/community_infrastructure_levy) or the Council's website (www.southend.gov.uk/cil).

 

2.  You should be aware that in cases where damage occurs during construction works to the highway in implementing this permission that Council may seek to recover the cost of repairing public highways and footpaths from any party responsible for damaging them. This includes damage carried out when implementing a planning permission or other works to buildings or land. Please take care when carrying out works on or near the public highways and footpaths in the Borough.

 

3.  Your attention is drawn to the advice given by Network Rail and you are advised to contact the Network Rail’s Asset Protection (ASPRO) team via AssetProtectionAnglia@networkrail.co.uk to discuss the scheme in detail, and to ascertain the impact the proposed development will have on Network Rail infrastructure.

 

4.  The applicant is encouraged to provide electric vehicle charging points within each of the garages of the development in accordance with Policy DM15 which encourages their provision wherever practical and feasible.

 

5.  Your attention is drawn to condition 4 and the requirement to submit details as to how the proposed planting of street trees would be achieved as part of the soft landscaping scheme of the site.

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.