Proposal: Demolish former disused garage sites to rear of 16 Eagle Way (Site 1A) and former compound site (Site 1B) and redevelop sites comprising of 5 terrace dwellinghouses with associated parking and amenity space (site 1A) and erect four storey block of 16 self-contained flats with communal garden and cycle store to rear, lay out associated parking and form additional vehicular access to north of site (1B) on to Eagle Way

Applicant: Southend on Sea Borough Council

Agent: AK Design Partnership LLP

 

Resolved: -

 

That PLANNING PERMISSION be GRANTED subject to the following conditions:

 

01 The development hereby permitted shall begin not later than three years of the date of this decision

 

Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990

 

02 The development hereby permitted shall be carried out in accordance with the following approved plans 4760.111 PL8, 4760.113 PL2, 4760.116 PL6, 4760.117 PL3, 4760.118 PL4

 

Reason: To ensure that the development is carried out in accordance with the Development Plan.

 

03 No development can commence unless and until a scheme for securing the timing and delivery of all of the dwellings hereby approved (21 dwellings)  as affordable dwellings, including their location, tenure and mix has been submitted to and approved in writing by the Local Planning Authority. Such a scheme must include a suitable means to secure the continuing provision of the 21 units as affordable housing. No housing in the scheme can be occupied until it has been built and management handed over to South Essex Homes in accordance with the terms set out in the scheme approved under this condition.   

 

Reason: A pre-commencement condition is necessary to ensure that the affordable housing is secured for the lifetime of the development in accordance with Core Strategy (2007) Policies CP6 and CP8.

 

04 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition and construction up to ground floor slab level shall take place until a brick sample and full product details of the materials to be used on all the external elevations, including walls, roof, doors and windows, balconies, canopies, soffits and boundaries have been submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details before it is brought into use.

 

Reason: To safeguard the visual amenities of the area, in accordance with the National Planning Policy Framework (2019) Core Strategy (2007) policy KP2 and CP4, Development Management Document (2015) Policy DM1 and advice contained within the Southend Design and Townscape Guide (2009).  

 

05 The 44 car parking spaces, including 6 disabled car parking spaces and the associated vehicular access for the spaces to access the public highway, shown on approved plans 4760.111-PL8 and 4760.116-PL6 shall be provided and made available for use at the site prior to the first occupation of the dwellings hereby approved. The car parking spaces noted on the approved plan and the associated vehicular access to and from the public highway shall thereafter be permanently retained as such.  

 

Reason: To ensure that satisfactory off-street car parking is provided in the interests of residential amenity and highways efficiency and safety, in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) policy KP2, Development Management Document (2015) policy DM15 and the Southend Design and Townscape Guide (2009). 

 

06 Notwithstanding  the details  shown  on  the  plans  submitted  and  otherwise  hereby approved, the development hereby permitted shall not be first occupied unless and until a car park management plan has been submitted to and approved in writing by  the  local  planning  authority.  The  car  park  management  plan  must  be

implemented in full accordance with the details approved under this condition prior to first occupation of any part of the development hereby approved and shall be maintained as such in perpetuity.   

 

Reason: To ensure that adequate car parking arrangements are provided to serve the  development  in  accordance  with  Policy  DM15  of  the  Council's  Development Management Document (2015) and Policy CP3 of the Core Strategy (2007).

 

07 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works above a ground floor slab level shall take place until full details of both hard and soft landscape works and proposed boundary treatment have been submitted to and approved in writing by the local planning authority.  These details shall include:

 

i)          proposed finished levels or contours;

ii)         Details for the means of enclosure of the amenity areas,

iii)        Details for the soft landscape works shall include the number, size and location of the trees, shrubs and plants to be planted together with a planting specification and the initial tree planting and tree staking details. 

iv)        Measures to enhance biodiversity.

 

The hard landscaping shall be implemented in full accordance with the approved details before the development is occupied or brought into use. The soft landscaping shall be completed before the end of the first planting season following first occupation of the building. Any trees or shrubs dying, removed, being severely damaged or becoming seriously diseased within five years of planting shall be replaced with trees or shrubs of such size and species as may be agreed with the Local Planning Authority

?

Reason: In the interests of visual amenity and the amenities of occupiers and to ensure a satisfactory standard of landscaping pursuant to Policy CP4 of the Core Strategy (2007) and policies DM1 and DM3 of the Development Management Document (2015) and advise contained  within the Southend Design and Townscape Guide (2009).  

 

08 Prior to the commencement of development the tree protective fences as shown on plan reference 4760-118-PL4 shall be installed. The protective measures shall remain in place throughout the construction phase of the development. Implementation of the development shall be undertaken only in full accordance with British Standard 3998 and British Standard 5837 including supervision of works by a qualified arboriculturalist.

 

Reason: A pre-commencement condition is justified to ensure the trees on and close to the site are adequately protected during building works in the interests of visual amenity and in accordance with Core Strategy (2007) policies KP2 and CP4, Development Management Document (2015) policy DM1 and advice contained within the Southend Design and Townscape Guide (2009).

 

09 The first floor windows on the side elevation of house plot 5 shall only be glazed in obscure glass (the glass to be obscure to at least Level 4 on the Pilkington Levels of Privacy) and fixed shut up to a height of not less than 1.7m above first floor level before the occupation of the dwellings hereby approved and shall be retained as such in perpetuity.  In the case of multiple or double glazed units at least one layer of glass in the relevant units shall be glazed in obscure glass to at least Level 4.

 

Reason:  To protect the privacy and environment of people in proposed and neighbouring residential properties, in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) policy CP4, Development Management Document (2015) policy DM1, and advice contained within the Design and Townscape Guide (2009).

 

10 The flatted development hereby approved shall not be occupied or brought into use until the refuse and recycling storage facilities are provided and made available for use by the occupiers in full accordance with the details shown on approved drawing number 4760.118 PL4 or any other details that have been previously submitted to and agreed in writing by the Local Planning Authority. The refuse and recycling facilities shall be permanently retained as such thereafter. 

 

Reason:  To ensure that the development is satisfactorily serviced and that satisfactory waste management is undertaken in the interests of highway safety and visual amenity and to protect the character of the surrounding area, in accordance with Policies KP2 and CP3 of the Core Strategy (2007) and Policy DM15 of the Development Management Document (2015).

 

11 The flatted development hereby approved shall not be occupied or brought into use until the cycle storage facilities are provided in full and made available for use by the occupiers in accordance with the details shown on drawing number 4760.118 PL4 or any other details that have been previously submitted to and agreed in writing by the Local Planning Authority. The cycle storage facilities shall be permanently retained as such thereafter. 

 

Reason:  To ensure the provision of adequate cycle parking in accordance with policies DM8 and DM15 of The Development Management Document (2015).

 

12 No development shall take place, until a Construction Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be fully adhered to throughout the construction period. The Statement shall provide, amongst other things, for:

 

a)         The parking of vehicles of site operatives and visitors

b)         Loading and unloading of plant and materials

c)         Storage of plant and materials used in constructing the development

d)         The erection and maintenance of security hoarding including measures to ensure the protection of the existing grass verges to the north section of the site to be retained.

e)         Measures to control the emission of noise, dust and dirt during construction

f)          A scheme for recycling/disposing of waste resulting from construction works that does not allow for the burning of waste on site.

 

Reason: This pre-commencement condition is needed in the interests of visual amenity and the amenities of neighbouring occupiers pursuant to Policy CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

13 Prior to the first occupation of any dwelling, details of the Residential Travel Packs shall be submitted to and approved in writing by the local planning authority. The approved travel packs shall then be provided to each dwelling within 1 month of their first occupation. 

 

Reason: In the interests of sustainability in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2, CP3 and CP4, Development Management Document (2015) Policy DM15, and Design and Townscape Guide (2009).

 

14 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, including the Drainage Strategy Report reference 200372 dated Dec 2020 and associated Drainage Plans references DBS200372-01A, DBS200372-02, DBS200372-03, DBS200372-04, the development hereby permitted shall not be commenced other than for demolition works unless and until the remaining information required in relation to sustainable drainage at the site has been submitted to and approved in writing by the local planning authority. The following additional information on the proposed sustainable drainage system shall be provided:

 

a)         The proposed drainage strategy for the permeable pavement elements should be assessed based on the infiltration results. It should be noted that permeable pavement systems are compatible with low infiltration soils but different construction details may be required.

b)         The design and statement should incorporate further consideration to other applicable types of SuDS (e.g. permeable pavement in car park spaces, green roofs, raingardens, swales, etc). Where these are not implemented, a valid justification should be provided. 

c)         A plan showing the areas positively drained into the system should be provided.

d)         The type and location of flow control device should be shown on the plan. 

e)         Exceedance flow routes should be shown on the plan.

f)          Construction details of permeable pavement, underground storage and flow controls should be provided.

g)         Calculations or justification should be provided to confirm that the proposed discharge is below the pre-development discharge rates. 

h)        Evidence of acceptance from Anglian Water is required for the discharge.

i)          Evidence of acceptance form Anglian water is required for the two sewer diversions.

j)          Confirmation is required that no additional catchment area is proposed to be discharged into the sewer in relation to the pre-development status.

k)         The method used to calculate the attenuation storage calculation (BRE Digest 365) is only applicable to infiltration systems. An acceptable calculation method for attenuation storage  (see chapter 24 in CIRIA SuDS Manual C753) should be used and detailed calculations provided.

l)          The statement should incorporate a section on water quality.

m)        Apart from the sewer diversions, the drainage strategy does not include the proposals for the foul drainage on the site. These proposals should be included in the report and drawing.

n)        Details of management of health and safety risks in relation to the drainage design should be provided.

o)         A method statement detailing the effect of surface water during the construction phase should be provided.

p)         A SuDS Management Plan should be provided and should include details of the body who will be responsible for the drainage maintenance, the required maintenance activities, the maintenance schedules and any access points and easements. 

 

The approved scheme shall be implemented  in accordance with the approved details before the development is occupied or brought into use and be maintained as such thereafter in perpetuity.

 

Reason: To prevent flooding by ensuring the satisfactory storage and disposal of surface water from the site for the lifetime of the development and to prevent environmental and amenity problems arising from flooding in accordance with the National Planning Policy Framework (2019), Policy KP2 and CP4 of the Core Strategy (2007) and  Policy DM2 of the Development Management Document  (2015)

 

15 Prior to occupation of the dwellings hereby approved, appropriate water efficient design measures as set out in Policy DM2 (iv) of the Development Management Document to limit internal water consumption to not more than 105 litres per person per day (lpd) (110 lpd when including external  water  consumption), to include measures of water efficient fittings, appliances and water recycling systems such as grey water and rainwater harvesting shall be implemented for the development and thereafter retained in perpetuity.

 

Reason: To minimise the environmental impact of the development through efficient use of water in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) Policy KP2, Development Management Document (2015) Policy DM2 and advice contained within the Southend Design and Townscape Guide (2009).

 

16 A scheme detailing how at least 10% of the total energy needs of the development will be supplied using on site renewable sources shall be submitted to, agreed in writing by the Local Planning Authority and implemented in full in accordance with the approved details prior to the first occupation of the dwelling hereby approved. This provision shall be made for the lifetime of the development.

 

Reason: To minimise the environmental impact of the development through efficient use of resources and better use of sustainable and renewable resources in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) policy KP2 and CP4, Development Management Document (2015) policy DM2 and the Southend Design and Townscape Guide (2009).

 

17 The development hereby approved shall be carried out in a manner to ensure that at least 10% of the dwellings, a minimum of 3 units, comply with building regulation M4(3) ‘wheelchair user dwellings’ and the remaining dwellings comply with building regulation M4 (2) ‘accessible and adaptable dwellings’ before it is occupied.

 

Reason: To ensure the residential unit hereby approved provides a high quality and flexible internal layout to meet the changing needs of residents in accordance with National Planning Policy Framework (2019), Core Strategy (2007) policy KP2, Development Management Document (2015) policy DM8 and the advice contained in the Southend Design and Townscape Guide (2009).

 

 

18 The development shall be carried out in full accordance with the recommendations set out in Sections 15.1 and 15.4 of the Combined Phase I and Phase II Site Investigation Report by agb Environmental reference P3220.1.0 dated 20 December 2018 before the development is occupied, including undertaking a watching brief by a competent person during any below ground works in accordance with the steps set out in paragraphs 15.1.2 and 15.4.2 If, during the development, land contamination not previously considered is identified, then the Local Planning Authority shall be notified immediately and no further works shall be carried out until a method statement detailing a scheme of mitigation for dealing with the additional contamination has been submitted to and agreed in writing with the Local Planning Authority. The approved scheme of additional contamination mitigation shall be implemented in full before the development is occupied.

 

Reason: To ensure that any contamination on the site is identified and treated so that it does not harm anyone who uses the site in the future, and to ensure that the development does not cause pollution to Controlled Waters in accordance with Core Strategy (2007) Policies KP2 and CP4 and Policies DM1 and DM14 of the Development Management Document (2015).

 

19 Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended), or any Order or Act of Parliament revoking and re-enacting that Order with or without modification, no extensions or detached buildings shall be erected at the dwellinghouses (plots 1-5) hereby approved specified within Schedule 2, Part 1, Classes A, B, D and E of the Town and Country Planning (General Permitted Development) Order 2015 without the receipt of express planning permission in writing from the Local Planning Authority.

 

Reason:  To enable the Local Planning Authority to regulate and control development in the interest of the amenity of neighbouring properties and to safeguard the character of the area in accordance the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policy DM1 and the Southend Design and Townscape Guide (2009).

 

20 Construction Hours for the development hereby approved shall be restricted to 8am – 6pm Monday to Friday, 8am - 1pm Saturday and not at all on Sundays or Bank Holidays.

 

Reason: In the interests of visual amenity and the amenities of neighbours and to ensure a satisfactory standard of landscaping pursuant to Policy CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

 

 

 

 

 

 

 

Informatives:

 

01 Please note that the development the subject of this application is liable for a charge under the Community Infrastructure Levy (CIL) Regulations 2010 (as amended) and it is the responsibility of the landowner(s) to ensure they have fully complied with the requirements of these regulations. A failure to comply with the CIL regulations in full can result in a range of penalties. For full planning permissions, a CIL Liability Notice will be issued by the Council as soon as practicable following this decision notice. For general consents, you are required to submit a Notice of Chargeable Development (Form 5) before commencement; and upon receipt of this, the Council will issue a CIL Liability Notice including details of the chargeable amount and when this is payable. If you have not received a CIL Liability Notice by the time you intend to commence development it is imperative that you contact S106andCILAdministration@southend.gov.uk to avoid financial penalties for potential failure to comply with the CIL Regulations 2010 (as amended).

 

02 You should be aware that in cases where damage occurs during construction works to the highway in implementing this permission that Council may seek to recover the cost of repairing public highways and footpaths from any party responsible for damaging them. This includes damage carried out when implementing a planning permission or other works to buildings or land. Please take care when carrying out works on or near the public highways and footpaths in the Borough.

 

03 The applicant is advised that the appropriate highways licences should be obtained prior to the commencement of the development.

 

04 The applicant is advised that the commitment to seek the nationally recognised security accreditation is welcomed by Essex Police and the applicant is invited to contact Essex Police who can provide support for this application at designingoutcrime@essex.police.uk 

 

05 The applicant is advised that Anglian Water has assets close to or crossing this site or there are assets subject to an adoption agreement. Therefore, the site layout should take this into account and accommodate those assets within either prospectively adoptable highways or public open space. If this is not practicable then the sewers will need to be diverted at the developers cost under Section 185 of the Water Industry Act 1991 or, in the case of apparatus under an adoption agreement, liaise with the owners of the apparatus. It should be noted that the diversion works should normally be completed before development can commence. Please contact Anglian Water at planningliaison@anglianwater.co.uk Reference 167627/1/0110592.

 

The Local Planning Authority has acted positively and proactively in determining this application by identifying matters of concern within the application (as originally submitted) and negotiating, with the Applicant, acceptable amendments to the proposal to address those concerns.  As a result, the Local Planning Authority has been able to grant planning permission for an acceptable proposal, in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework.  The detailed analysis is set out in a report on the application prepared by officers.

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.