Agenda item

21/01722/FUL - 137 Marine Parade, Leigh-on-Sea (West Leigh Ward)

Minutes:

Proposal: Erect dormers to north, west and south including a recessed balcony to south elevation, rooflights to the east, and extension of existing roof to create 1no. self-contained flat

Applicant: Natalie Batrouni

Agent: William Tozer Associates Ltd.

 

Resolved:-

 

That planning permission be GRANTED subject to the following conditions:

 

01 The development hereby permitted shall begin no later than three years from the date of this decision.

 

Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.

 

02 The development hereby approved shall be carried out in accordance with the approved plans: A/01/100; A/01/101/B; A/01/102/B; A/01/103/B; A/01/104; A/01/105; A/01/106; A/01/501; A/02/4101; A/02/4102; A/02/4103/D; A/02/4104/C; A/02/4105/C; A/02/4106/C, A/02/04107, A/02/4108.

 

Reason: To ensure the development is carried out in accordance with the development plan.

 

03 Notwithstanding the details shown on the plans submitted and otherwise hereby approved the works to construct the dormer windows which form part of this consent shall not commence unless and until full details and specifications of the materials to be used for all the external surfaces of the proposed extensions and alterations at the site including facing materials, roof detail, windows, doors and balustrade details have been submitted to and approved in writing by the local planning authority. The works must then be carried out in full accordance with the approved details before the dwelling hereby approved is first occupied.

 

Reason: In the interest of visual amenity in accordance with the National Planning Policy Framework (2021), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1 and DM3, and the advice contained within the National Design Guide (2021) and the Design and Townscape Guide (2009).

 

04 Prior to the first occupation of the development hereby approved, full details of refuse, recycling and secure covered bicycle storage facilities for the flat hereby approved shall be submitted to and approved in writing by the Local Planning Authority. Prior to first occupation of the development, the refuse, recycling and bicycle storage facilities shall be provided at the site and be made available for use in accordance with the approved details and retained in perpetuity thereafter. 

 

Reason:  In the interests of residential amenity for future occupants, to ensure the provision of adequate cycle parking and refuse and recycling stores and in the interests of visual amenity as set out in the National Planning Policy Framework (2021), Core Strategy (2007) policies KP2 and CP4 and Policies DM1, DM8 and DM15 of the Development Management Document (2015) and the guidance within the Design and Townscape Guide (2009).

 

05 Construction and demolition works for the approved development on site shall only be undertaken between 8 am to 6 pm on weekdays, between 8 am and 1 pm on Saturdays and not at any time on Sundays and Bank and Public Holidays.

 

Reason: In the interest of the residential amenity of nearby occupiers in accordance with the National Planning Policy Framework (2021), Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1 and DM3 of the Development Management Document (2015).

 

06 The proposed windows in the western elevation of the development hereby approved shall only be glazed in obscure glass (the glass to be obscure to at least Level 4 on the Pilkington Levels of Privacy) and fixed shut, except for any top hung fan light which shall be a minimum of 1.7 metres above internal finished floor level. The windows shall be retained as such in perpetuity and in the case of multiple or double-glazed units at least one layer of glass in the relevant units shall be glazed in obscure glass to at least Level 4 on the Pilkington scale.  

 

Reason: To safeguard the privacy and amenities of occupiers of neighbouring residential properties and the future occupiers of the proposed residential dwellings, in accordance with the National Planning Policy Framework (2021), Core Strategy (2007) policy CP4, Development Management Document (2015) Policy DM1 and advice contained in The Design and Townscape Guide (2009).

 

07 Prior to occupation of the development hereby approved details of energy efficiency and other sustainability measures to be included in the scheme, including the provision of at least 10% of the energy needs of the development hereby approved being provided from onsite renewable sources, shall be submitted to, agreed in writing by the Local Planning Authority and implemented on site in accordance with the agreed details.

 

Reason: To minimise the environmental impact of the development through efficient use of resources and better use of sustainable and renewable resources in accordance with the National Planning Policy Framework (2021), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policy DM2, and the advice contained within the National Design Guide (2021) and the Design and Townscape Guide (2009).

 

08 The dwelling hereby approved shall incorporate water efficient design measures set out in Policy DM2 (iv) of the Development Management Document to limit internal water consumption to 105 litres per person per day (lpd) (110 lpd when including external water consumption), including measures of water efficient fittings, appliances and water recycling systems such as grey water and rainwater harvesting before they are occupied.

 

Reason: To minimise the environmental impact of the development through efficient use of resources and better use of sustainable and renewable resources in accordance with the National Planning Policy Framework (2021), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policy DM2, and the advice contained within the National Design Guide (2021) and the Design and Townscape Guide (2009).

 

The Local Planning Authority has acted positively and proactively in determining this application by identifying matters of concern within the application (as originally submitted) and negotiating, with the Applicant, acceptable amendments to the proposal to address those concerns. As a result, the Local Planning Authority has been able to grant planning permission for an acceptable proposal, in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework. The detailed analysis is set out in a report on the application prepared by officers.

 

Informatives:

 

1.  Please note that the development which is the subject of this application is liable for a charge under the Community Infrastructure Levy (CIL) Regulations 2010 (as amended) and it is the responsibility of the landowner(s) to ensure they have fully complied with the requirements of these regulations. A failure to comply with the CIL regulations in full can result in a range of penalties. For full planning permissions, a CIL Liability Notice will be issued by the Council as soon as practicable following this decision notice. For general consents, you are required to submit a Notice of Chargeable Development (Form 5) before commencement; and upon receipt of this, the Council will issue a CIL Liability Notice including details of the chargeable amount and when this is payable. If you have not received a CIL Liability Notice by the time you intend to commence development, it is imperative that you contact S106andCILAdministration@southend.gov.uk to avoid financial penalties for potential failure to comply with the CIL Regulations 2010 (as amended). If the chargeable development has already commenced, no exemption or relief can be sought in relation to the charge and a CIL Demand Notice will be issued requiring immediate payment. Further details on CIL matters can be found on the Planning Portal (www.planningportal.co.uk/info/200136/policy_and_legislation/70/community_infrastructure_levy) or the Council's website (www.southend.gov.uk/cil).

 

2.  You should be aware that in cases where damage occurs during construction works to the highway in implementing this permission that Council may seek to recover the cost of repairing public highways and footpaths from any party responsible for damaging them. This includes damage carried out when implementing a planning permission or other works to buildings or land. Please take care when carrying out works on or near the public highways and footpaths in the Borough.

 

3.  No waste materials should be burnt on the site, instead being removed by licensed waste contractors. No dust emissions or fumes should leave the boundary of the site. Consideration should be taken to restricting the duration of noisy activities and in locating them away from the periphery of the site.

 

4.  The applicant is reminded that this permission does not bestow compliance with other regulatory frameworks. In particular, your attention is drawn to the statutory nuisance provisions within the Environmental Protection Act 1990 (as amended) and the noise provisions within the Control of Pollution Act 1974. Applicants should contact the Council’s Regulatory Services Officer in Environmental Protection for more advice on 01702 215005 or at Regulatory Services, Southend-on-Sea Borough Council, Civic Centre, Victoria Avenue, Southend SS2 6ER’.

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.