Agenda item

21/02084/FUL - Land Rear of Southend Mosque and Islamic Trust, 191 - 197 West Road, Westcliff on Sea (Prittlewell Ward)

Minutes:

Proposal: Erect 2no. dwellinghouses with associated amenity and parking

Applicant: Mr Jerry O'Connor

Agent: Ankur Architects

 

Resolved:-

 

That planning permission be GRNATED subject to the following conditions:

 

GRANT PLANNING PERMISSION subject to the following conditions:

 

01 The development hereby permitted shall begin not later than three years from the date of this decision.

 

Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990

 

02 The development hereby permitted shall be carried out in accordance with the following approved 01, 11, 12-P1, 13-P1, 14, 15-P1, 16-P1, 17-P1, 18, 19-P1, 20-P1, 26.

 

Reason: To ensure that the development is carried out in accordance with the Development Plan.

 

03 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than construction up to ground floor slab level shall take place unless and until full product details of the materials to be used on all the external elevations of the development hereby approved, including walls including decorative brickwork elements, roof, windows and doors, fascia and soffits, rainwater goods and boundaries have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details before it is brought into first use.

 

Reason: To safeguard the visual amenities of the area, in accordance with the National Planning Policy Framework (2021) Core Strategy (2007) policies KP2 and CP4, Development Management Document (2015) Policy DM1 and advice contained within the Southend Design and Townscape Guide (2009). 

 

04 The northeast panes of the first floor window on the east elevation of the northern most property and the two first floor bathroom windows of the development hereby approved shall only be glazed in obscure glass (the glass to be obscure to at least Level 4 on the Pilkington Levels of Privacy, or such equivalent as may be agreed in writing with the Local Planning Authority ) and fixed shut up to a height of not less than 1.7m above the relevant room’s internal finished floor level before the occupation of the extension hereby approved and the windows shall be retained as such in perpetuity. In the case of multiple or double glazed units at least one layer of glass in the relevant units shall be glazed in obscure glass to at least Level 4.

 

Reason: To protect the privacy and environment of people in proposed and neighbouring residential properties, in accordance with the National Planning Policy Framework (2021), Core Strategy (2007) policy CP4, Development Management Document (2015) policy DM1, and advice contained within the Design and Townscape Guide (2009).

 

05 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than construction up to ground floor slab level shall take place until full details of both hard and soft landscape works to be carried out at the site have been submitted to and approved in writing by the Local Planning Authority. The approved hard landscaping works shall be carried out prior to first occupation of the development and the soft landscaping works within the first planting season following first occupation of the development, unless otherwise agreed in writing by the Local Planning Authority. The details submitted shall include, but not limited to:-

 

(i) Existing and proposed finished site levels or contours. 

(ii) Details of means of enclosure, of the site including any gates or boundary walls and fencing. 

(iii) Hard surfacing materials. 

(iv) Full details of the number, size and location of the trees, shrubs and plants to be retained and planted together with a planting specification and tree management plan.

(v) Details of measures to enhance biodiversity within the site.

 

Any trees or shrubs dying, removed, being severely damaged or becoming seriously diseased within five years of planting shall be replaced with trees or shrubs of such size and species as may be agreed with the Local Planning Authority.

 

Reason: In the interests of the visual amenity of the area and the amenities of occupiers and to ensure a satisfactory standard of landscaping pursuant to Policy DM1 of the Development Management Document (2015)  and Policy CP4 of the Core Strategy (2007)

 

06 The 2 car parking spaces and the associated new vehicular accesses for the spaces to access the public highway at the site as shown on approved plan 13-P1 shall be provided and made available for use prior to the first occupation of the dwellings hereby approved. The car parking spaces and the associated vehicular access to and from the public highway shall thereafter be permanently retained solely for the parking of vehicles and the accessing of the car parking spaces in connection with the occupiers of the dwellings hereby approved and their visitors.

 

Reason: To ensure that satisfactory off-street car parking is provided in the interests of residential amenity and highways efficiency and safety, in accordance with the National Planning Policy Framework (2021), Core Strategy (2007) policy KP2, Development Management Document (2015) policy DM15 and the Southend Design and Townscape Guide (2009). 

 

07 A scheme detailing how at least 10% of the total energy needs of the development will be supplied using on site renewable sources shall be submitted to, agreed in writing by the Local Planning Authority and implemented in full in accordance with the approved details prior to the first occupation of the development hereby approved. This provision shall be made for the lifetime of the development.

 

Reason: To minimise the environmental impact of the development through efficient use of resources and better use of sustainable and renewable resources in accordance with the National Planning Policy Framework (2021), Core Strategy (2007) policy KP2 and CP4, Development Management Document (2015) policy DM2 and the Southend Design and Townscape Guide (2009).

 

08 Prior to occupation of the development hereby approved, appropriate water efficient design measures as set out in Policy DM2 (iv) of the Development Management Document to limit internal water consumption to 105 litres per person per day (lpd) (110 lpd when including external water consumption), to include measures of water efficient fittings, appliances and water recycling systems such as grey water and rainwater harvesting shall be implemented for the whole development and retained in perpetuity.

 

Reason: To minimise the environmental impact of the development through efficient use of water in accordance with the National Planning Policy Framework (2021), Core Strategy (2007) Policy KP2, Development Management Document (2015) Policy DM2 and Design and Townscape Guide (2009).

 

09 The development hereby approved shall be carried out in a manner to ensure the dwellings comply with building regulation M4 (2) ‘accessible and adaptable dwellings’ before they are occupied.

 

Reason: To ensure the residential units hereby approved provides a high quality and flexible internal layout to meet the changing needs of residents in accordance with National Planning Policy Framework (2021), Core Strategy (2007) policy KP2, Development Management Document (2015) policy DM8 and the advice contained in the Southend Design and Townscape Guide.

 

10 No drainage infrastructure, including earthworks, associated with this development hereby approved shall be undertaken until details of the design implementation; maintenance and management of a scheme for surface water drainage works (incorporating Sustainable Urban Drainage (SuDs) Principles in  line with The Sustainable Drainage Systems Design Guide for Essex Minor Applications https://www.essexdesignguide.co.uk/suds/further-guidance/minor-applications/ ) have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented in accordance with the approved details before the development is occupied or brought into use and shall be maintained as such thereafter in perpetuity.

 

Reason: To prevent flooding by ensuring the satisfactory storage and disposal of surface water from the site for the lifetime of the development and to prevent environmental and amenity problems arising from flooding in accordance with the National Planning Policy Framework (2021), Policy KP2 and CP4 of the Core Strategy (2007) and Policy DM2 of the Development Management Document (2015).

 

11 Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended), or any Order or Act of Parliament revoking and re-enacting that Order with or without modification, no extensions or detached buildings shall be erected at the development hereby approved specified within Schedule 2, Part 1, Classes A, B, D, E and F of the Town and Country Planning (General Permitted Development) Order 2015 without the receipt of express planning permission in writing from the Local Planning Authority .

 

Reason:  To enable the Local Planning Authority to regulate and control development in the interest of the amenity of neighbouring properties and to safeguard the character of the area in accordance the National Planning Policy Framework (2021), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policy DM1 and the Southend Design and Townscape Guide (2009).

 

12 The site subject of this approval shall be remediated in full accordance with the Phase 1 Geo-Environmental Desk Study Report by Brown 2 Green reference 2311/Rpt1v2 dated October 2021, Geo-Environmental Site Investigation Report by Brown 2 Green reference 2311/Rpt2v2 dated October 2021 and Remediation Method Statement by Brown 2 Green reference 2311/Rpt3v2 dated October 2021 before the construction of the development hereby approved begins. A Validation Report for the Site Remediation Strategy shall be submitted to, and agreed in writing by, the Local Planning Authority before completion of the development or occupation of the dwellings (whichever comes first).

 

In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority.  An investigation and risk assessment must be undertaken, and where remediation is necessary a remediation scheme musty be prepared submitted for the approval in writing of the Local Planning Authority.

 

Reason: To ensure that any contamination on the site is identified and treated so that it does not harm anyone who uses the site in the future, and to ensure that the development does not cause pollution to Controlled Waters in accordance with Core Strategy (2007) Policies KP2 and CP4 and Policies DM1 and DM14 of the Development Management Document (2015).

 

13 No development shall take place, until and unless a Construction Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be fully adhered to throughout the construction period. The Statement shall provide, amongst other things, for:

 

(i) the parking of vehicles of site operatives and visitors

(ii) loading and unloading of plant and materials

(iii) storage of plant and materials used in constructing the development

(iv) the erection and maintenance of security hoarding including measures to ensure the protection of the street tree.

(v) measures to control the emission of dust and dirt during construction.

(vi) a scheme for recycling/disposing of waste resulting from demolition and construction works that does not allow for the burning of waste on site or pollution of the site.

(vii) Measures to mitigate the impact of noise during construction.

 

Reason: This pre-commencement condition is needed in the interests of visual amenity and the amenities of neighbouring occupiers pursuant to Policy CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

14 Construction Hours for the development hereby approved shall be restricted to 8am – 6pm Monday to Friday, 8am - 1pm Saturday and not at all on Sundays or Bank Holidays.

 

Reason: In the interests of the amenities of neighbours pursuant to Policy CP4 of the Core Strategy (2007) and Policy DM1 of the Development Management Document (2015).

 

Informatives:

 

01 Please note that the development the subject of this application is liable for a charge under the Community Infrastructure Levy (CIL) Regulations 2010 (as amended) and it is the responsibility of the landowner(s) to ensure they have fully complied with the requirements of these regulations. A failure to comply with the CIL regulations in full can result in a range of penalties. For full planning permissions, a CIL Liability Notice will be issued by the Council as soon as practicable following this decision notice. For general consents, you are required to submit a Notice of Chargeable Development (Form 5) before commencement; and upon receipt of this, the Council will issue a CIL Liability Notice including details of the chargeable amount and when this is payable. If you have not received a CIL Liability Notice by the time you intend to commence development it is imperative that you contact S106andCILAdministration@southend.gov.uk to avoid financial penalties for potential failure to comply with the CIL Regulations 2010 (as amended). If the chargeable development has already commenced, no exemption or relief can be sought in relation to the charge and a CIL Demand Notice will be issued requiring immediate payment. Further details on CIL matters can be found on the Planning Portal (www.planningportal.co.uk/info/200136/policy_and_legislation/70/community_infrastructure_levy) or the Council's website (www.southend.gov.uk/cil).  

 

02 You should be aware that in cases where damage occurs during construction works to the highway in implementing this permission that Council may seek to recover the cost of repairing public highways and footpaths from any party responsible for damaging them. This includes damage carried out when implementing a planning permission or other works to buildings or land. Please take care when carrying out works on or near the public highways and footpaths in the Borough.

 

03 The applicant is encouraged to include electric vehicle charging points at the site which is in accordance with Policy DM15 which encourages their provision wherever practical and feasible.

 

The Local Planning Authority has acted positively and proactively in determining this application by identifying matters of concern within the application (as originally submitted) and negotiating, with the Applicant, acceptable amendments to the proposal to address those concerns.  As a result, the Local Planning Authority has been able to grant planning permission for an acceptable proposal, in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework.  The detailed analysis is set out in a report on the application prepared by officers.

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.