19/00552/FULM - 25 Roots Hall Avenue, Southend-on-Sea (Prittlewell Ward)

Minutes:

Proposal: Demolish existing building and erect 3 storey block comprising of 12 self-contained flats with associated car parking and amenity space, refuse and cycle stores and vehicular access onto Roots Hall Avenue (Amended Proposal)

Applicant: Mrs Ayandare

Agent: RD Architecture Ltd

 

Resolved:-

 

That PLANNING PERMISSION be GRANTED subject to the following conditions:

 

(a) - DELEGATE to the Director of Planning and Transport or Group Manager of Planning & Building Control to GRANT PLANNING PERMISSION subject to the following conditions and subject to completion of a PLANNING AGREEMENT UNDER SECTION 106 of the Town and Country Planning Act 1990 (as amended) and all appropriate legislation to secure the provision of:

 

  • A financial contribution towards secondary education provision of £12,810.10 (index linked) towards a project at Chase High School, or similar expansion of another local secondary school.

 

(b) The Director of Planning and Transport or the Group Manager (Planning & Building Control) be authorised to determine the application upon completion of the above obligation, so long as planning permission when granted and the obligation when executed, accords with the details set out in the report submitted and the conditions listed below:

 

01 - The development hereby permitted shall be begun not later than 3 years beginning with the date of this permission.

 

Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.

 

02 - The development shall be carried out in accordance with the approved plans: 1594/230/P5, 1594/230/P4, 1594/150/P2, 1594/140/P3, 1594/130/P2,  1594/250/P11, 1594/251/P11,   1594/260/P10, 1594/261/P7.

 

Reason: To ensure the development is carried out in accordance with the development plan.

 

03 - Notwithstanding the details shown on the plans submitted and otherwise hereby approved the development hereby permitted shall not commence, other than for groundworks and site preparation works, unless and until details and appropriately sized samples of the materials to be used for all the external surfaces of the proposed development including facing materials, roof detail, windows, doors, fascia, balconies, and balustrades have been submitted to and approved in writing by the local planning authority. The works must then be carried out and completed in full accordance with the approved materials, details and specifications before the dwellings hereby approved are first occupied.

 

Reason: To safeguard character and appearance of the area in accordance with Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1 and DM3 of the Development Management Document (2015) and the Design and Townscape Guide (2009).

 

04 - Notwithstanding the details shown on the plans hereby approved no development shall take place, other than demolition ground and site preparation works, until there has been submitted to and approved by the Local Planning Authority a scheme of hard and soft landscaping for the site.  This shall include details of the number, size and location of the trees and shrubs to be planted together with a planting specification, details of the treatment of all hard and soft surfaces and all means of enclosing the site.

 

All planting in the approved landscaping scheme shall be carried out within the first available planting season following first occupation of any of the residential units within the development.  Any shrubs dying, removed, being severely damaged or becoming seriously diseased within five years of planting shall be replaced with trees or shrubs of such size and species as may be agreed with the Local Planning Authority. Hard landscaping and means of enclosure shall be implemented in full accordance with the approved scheme prior to first occupation of any part of the development hereby approved.

 

Reason: In the interests of visual amenity and to ensure a satisfactory standard of landscaping pursuant to Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1 and DM3 of the Development Management Document (2015) and the Design and Townscape Guide (2009).

 

05 - The development shall not be first occupied until 8 on site car parking spaces have been provided and made available for use in full accordance with drawing 1594/250/P11. The parking spaces shall be permanently maintained thereafter solely for the parking of occupiers of and visitors to the development.

 

Reason: To ensure that adequate car parking is provided and retained to serve the development in accordance with Policy DM15 of the Council’s Development Management Document (2015) and Policy CP3 of the Core Strategy (2007).

 

06 - Before the development is first occupied, the development hereby approved shall be carried out in a manner to ensure that a minimum of 2 of the flats hereby approved comply with the building regulation M4 (3) ‘wheelchair user dwellings’ standard and the remaining 10 flats comply with the building regulation part M4(2) ‘accessible and adaptable dwellings’ standard.

 

 

 

 

Reason: To ensure the residential units hereby approved provide high quality and flexible internal layouts to meet the changing needs of residents in accordance with National Planning Policy Framework, (2019), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1, DM8 and Design and Townscape Guide (2009).

 

07 - Prior to the first occupation of the development hereby approved a scheme detailing how at least 10% of the total energy needs of the development will be supplied using on site renewable sources must be submitted to and agreed in writing prior to occupation of the development hereby approved by the Local Planning Authority and implemented in full prior to the first occupation of any part of the development.

This provision shall be made for the lifetime of the development.

 

Reason: In the interests of providing sustainable development and ensuring a high quality of design in accordance with Policy KP2 of the Core Strategy (2007) and the Design and Townscape Guide (2009).

08 - Prior to first occupation of the development hereby approved water efficient design measures set out in Policy DM2 (iv) of the Development Management Document to limit internal water consumption to 105 litres per person  per  day  (lpd)  (110  lpd  when  including  external  water  consumption), including measures of water efficient fittings, appliances and water recycling systems such as grey water and rainwater harvesting shall be installed in the development hereby approved and be retained in perpetuity thereafter.

 

Reason: To minimise the environmental impact of the development through efficient use of water in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) Policy KP2, Development Management Document (2015) Policy DM2 and the Councils Design and Townscape Guide (2009).

 

09 - Demolition or construction works associated with this permission shall not take place outside 08:00 hours to 18:00 hours Mondays to Fridays and 08:00hours to 13:00hours on Saturdays and at no time on Sundays or Bank Holidays.

 

Reason: In order to protect the amenities of surrounding occupiers and to protect the character the area in accordance with Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

10 - Notwithstanding the details shown on the submitted plans, and otherwise hereby approved, prior to the first occupation of the dwellings hereby approved, details shall be submitted to and approved in writing by the local planning authority identifying the amended location and details of the refuse and recycling stores. The approved refuse and recycling facilities shall be provided in full and made available for use by the occupants of the dwellings prior to the first occupation of the dwellings hereby approved and be retained as such in perpetuity.

 

Reason:  To ensure that the development is provided with satisfactory refuse and recycling storage in the interests of highway safety and visual amenity and to protect the character of the surrounding area, in accordance with Policies KP2 and CP3 of the Core Strategy (2007) and  Policy DM15 of the Development Management Document (2015).

 

11 - Notwithstanding the details shown on the plans submitted and otherwise hereby approved, the development hereby permitted shall not be commenced other than for demolition works unless and until a drainage strategy, surface water management strategy, and SuDS design statement has been submitted to and approved in writing by the local planning authority.

 

The drainage strategy and SuDS design statement must be implemented in full accordance with the details approved under this condition before the development hereby approved is first occupied or brought into first use.

 

Reason:  To ensure the approved development does not increase flood risk elsewhere in accordance with National Planning Policy Framework (2019), Core Strategy (2007) Policies KP1, KP2 and KP3 and Development Management Document (2015) Policies DM6 and DM14.

 

12 - Notwithstanding the information submitted with the application, no development shall be undertaken other than demolition works, unless and until a programme of archaeological recording and analysis, a watching brief and details of the measures to be taken should any archaeological finds be discovered, has been submitted to and approved in writing by the local planning authority. The approved recording/watching brief and measures are to be undertaken throughout the course of the works affecting below ground deposits and are to be carried out by an appropriately qualified archaeologist. The subsequent recording and analysis reports shall be submitted to the local planning authority before the development is brought into first use.

 

Reason: To allow the preservation by record of archaeological deposits and to provide an opportunity for the watching archaeologist to notify all interested parties before the destruction of any archaeological finds in accordance with the National Planning Policy Framework (2019) and Policy DM5 of the Development Management Document (2015).

 

13 - Notwithstanding the details shown in the plans submitted and otherwise hereby approved, the development hereby granted consent shall not be occupied or brought into first use unless and until plans are submitted to the Local Planning Authority and approved in writing which clearly specify all the windows and other openings in the development that are to be permanently glazed with obscured glass and fixed shut or provided with only a fanlight (or other similar) opening and the manner and design in which these windows and openings are to be implemented. The development hereby permitted shall be implemented in full accordance with the details approved under this condition before it is first occupied or brought into use and shall be permanently retained as such thereafter. The windows included within such agreed scheme shall be glazed in obscure glass which is at least Level 4 on the Pilkington Levels of Privacy, or such equivalent as may be agreed in writing with the local planning authority. Top hung lights agreed within such scheme shall be a minimum of 1.7 metres above internal floor level. In the case of multiple or double glazed units at least one layer of glass in the relevant units shall be glazed in obscure glass to at least Level 4. The windows shall be retained in accordance with the agreed details in perpetuity thereafter.

 

Reason: In the interests of the residential amenity and the living conditions of the future occupiers of the development and to ensure that the development complies with the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) policies DM1 and DM3 and The Design and Townscape Guide (2009). 

 

14 - Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no development above ground floor slab level shall be undertaken unless and until a noise assessment and full details of the acoustic mitigation to be provided within the development, including all glazing and ventilation have been submitted to and approved in writing by the local planning authority. The development must be completed in accordance with the approved details prior to the first occupation of the development and thereafter retained as such in perpetuity.

 

Reason: To safeguard the residential amenity of the future occupiers in accordance with policy DM1 of the Development Management Document (2015) and Policies KP2 and CP4 of the Core Strategy (2007).

 

15 - Other than for demolition and site clearance, no development shall take place until a site investigation of the nature and extent of any land contamination present has been carried out in accordance with a methodology which has previously been submitted to and approved in writing by the local planning authority.

 

The results of the site investigation shall be made available to the local planning authority before any construction begins. If any contamination is found during the site investigation, a report specifying the measures to be taken to remediate the site to render it suitable for the development hereby permitted shall be submitted to and approved in writing by the local planning authority before any construction begins. The site shall be remediated in accordance with the approved remediation measures before the development hereby approved is occupied and evidence to demonstrate that the remediation has taken place shall be submitted in writing to the Local Planning Authority before the development is occupied. 

 

If, during the course of development, any contamination is found which has not been identified in the site investigation, development shall stop and additional measures for the remediation of this source of contamination shall be submitted to and approved in writing by the local planning authority. The remediation of the site shall incorporate the approved additional measures and these shall be fully implemented before the site is occupied.

 

Reason: To ensure that any contamination on the site is identified and treated so that it does not harm anyone who uses the site in the future, and to ensure that the development does not cause pollution to Controlled Waters in accordance with Core Strategy (2007) Policies KP2 and CP4 and Policies DM1 and DM14 of the Development Management Document (2015). 

 

16 - The development shall not be first occupied until the secure, covered cycle parking spaces to serve the development as shown on drawing 1594/250/P11 have been provided at the site and made available for use for occupiers of the development in full accordance with the approved plans. The approved facility shall be permanently maintained thereafter. 

 

Reason:  To ensure the provision of adequate cycle parking and refuse storage in accordance with Policy CP3 of the Core Strategy (2007) and Policies DM3, DM8 and DM15 of Development Management Document (2015).

 

17 - Notwithstanding the details shown on the plans submitted and otherwise hereby approved, the development hereby permitted shall not be first occupied unless and until a car park management plan has been submitted to and approved in writing by the local planning authority. The car park management plan must be implemented in full accordance with the details approved under this condition before the dwellings hereby approved are first occupied and maintained in perpetuity.

 

Reason: To ensure that adequate car parking arrangements are provided to serve the development in accordance with Policy DM15 of the Council’s Development Management Document (2015) and Policy CP3 of the Core Strategy (2007).

 

18 - No development shall take place, until a Construction Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be fully adhered to throughout the construction period. The Statement shall provide, amongst other things, for:

 

i)  the parking of vehicles of site operatives and visitors

ii)  loading and unloading of plant and materials

iii)  storage of plant and materials used in constructing the development

iv)  the erection and maintenance of security hoarding 

v)  measures to control the emission of dust and dirt during construction

vi) a scheme for recycling/disposing of waste resulting from construction works that does not allow for the burning of waste on site.

 

Reason: This pre-commencement condition is needed in the interests of visual amenity and the amenities of neighbouring occupiers pursuant to Policy CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

(c) - In the event that the planning obligation referred to in part (a) above has not been completed by 16th August 2019 or an extension of this time as may be agreed, the Director of Planning and Transport or Group Manager Planning & Building Control be authorised to refuse planning permission for the application on the grounds that the development would not provide for education provision and that as such the proposal would be unacceptable and contrary to Policies KP2, KP3, CP6 and CP8 of the Core Strategy (2007).

 

The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including planning policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework.  The detailed analysis is set out in a report on the application prepared by officers.

 

Informatives:

 

01 Please note that the development the subject of this application is liable for a charge under the Community Infrastructure Levy Regulations 2010 (as amended). A Community Infrastructure Levy (CIL) Liability Notice will be issued as soon as practicable following this decision notice. This contains details including the chargeable amount, when this is payable and when and how exemption or relief on the charge can be sought. You are advised that a CIL Commencement Notice (CIL Form 6) must be received by the Council at least one day before commencement of development. Receipt of this notice will be acknowledged by the Council. Please ensure that you have received both a CIL Liability Notice and acknowledgement of your CIL Commencement Notice before development is commenced. Most claims for CIL relief or exemption must be sought from and approved by the Council prior to commencement of the development. Charges and surcharges may apply, and exemption or relief could be withdrawn if you fail to meet statutory requirements relating to CIL. Further details on CIL matters can be found on the Council's website at www.southend.gov.uk/cil.

 

02 You should be aware that in cases where damage occurs during construction works to the highway in implementing this permission that the Council may seek to recover the cost of repairing public highways and footpaths from any party responsible for damaging them. This includes damage carried out when implementing a planning permission or other works to buildings or land. Please take care when carrying out works on or near the public highways and footpaths in the borough.

 

03 Anglian Water has assets close to or crossing this site or there are assets subject to an adoption agreement. Therefore the site layout should take this into account and accommodate those assets within either prospectively adoptable highways or public open space. If this is not practicable then the sewers will need to be diverted at the developers cost under Section 185 of the Water Industry Act 1991, or in the case of apparatus under an adoption agreement, liaise with the owners of the apparatus. It should be noted that the diversion works should normally be completed before development can commence.

 

04 Notification of intention to connect to the public sewer under S106 of the Water Industry Act Approval and consent will be required by Anglian Water, under the Water Industry Act 1991. Contact Development Services Team 0345 606 6087.

 

05 A public sewer is shown on record plans within the land identified for the proposed development. It appears that development proposals will affect existing public sewers. It is recommended that the applicant contacts Anglian Water Development Services Team for further advice on this matter. Building over existing public sewers will not be permitted (without agreement) from Anglian Water.

 

06 No building will be permitted within the statutory easement width of 3 metres from the pipeline without agreement from Anglian Water. Please contact Development Services Team on 0345 606 6087.

 

07 The developer should note that the site drainage details submitted have not been approved for the purposes of adoption. If the developer wishes to have the sewers included in a sewer adoption agreement with Anglian Water (under Sections 104 of the Water Industry Act 1991), they should contact our Development Services Team on 0345 606 6087 at the earliest opportunity. Sewers intended for adoption should be designed and constructed in accordance with Sewers for Adoption guide for developers, as supplemented

by Anglian Water’s requirements.

 

08 It should be noted that future occupiers of the development will not be eligible for a town centre or resident parking permits.

 

 

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.