Agenda item
16/01475/FULM - Grand Hotel, Broadway, Leigh on Sea (Leigh Ward)
- Meeting of Development Control Committee, Wednesday, 5th July, 2017 2.00 pm (Item 122.)
- View the declarations of interest for item 122.
Minutes:
Proposal: Convert existing hotel into mixed use comprising of basement wine bar and health club, ground floor restaurants and terrace, 19 self-contained flats on three floors, form new mansard roof and penthouse roof extension and three storey rear extension with mansard roof, external alterations, install extract/ventilation equipment and solar PV panels, layout parking, associated landscaping and form new vehicular access onto Broadway
Applicant: 460 Leisure Ltd
Agent: Mr Kieron Lilley
Mr O’Boyle, a local resident, spoke as an objector to the application. Mr Lilley, the Applicant’s Agent responded.
Planning Permission REFUSED for the following reasons:
01 The development, by reason of the design, mass, scale, siting and size of the proposed fourth floor penthouse roof extension and the increased scale and detailed design of the enlarged mansard roof, would have a detrimental impact on and be significantly harmful to the character and appearance of the locally listed building and the Leigh Cliff Conservation Area more widely. The development is therefore considered to be unacceptable and contrary to the National Planning Policy Framework (2012), policies KP2 and CP4 of the Southend Core Strategy (2007), policies DM1, DM3 and DM5 of the Southend Development Management Document (2015) and the advice contained in the Design and Townscape Guide (2009).
02 The submission does not include a completed formal undertaking to secure an appropriate financial contribution to the provision of education facilities in the borough, to mitigate the demand for such facilities generated by the development proposed. The application is therefore unacceptable and contrary to the National Planning Policy Framework and Policies KP2, KP3 and CP6 of the Southend Core Strategy (2007).
The Local Planning Authority has acted positively and proactively in determining this application by identifying matters of concern with the proposal and discussing those with the Applicant. Unfortunately, it has not been possible to resolve those matters within the timescale allocated for the determination of this planning application and therefore, the proposal is not considered to be sustainable development. However, the Local Planning Authority has clearly set out, within its report, the steps necessary to remedy the harm identified within the reasons for refusal - which may lead to the submission of a more acceptable proposal in the future. The Local Planning Authority is willing to provide pre-application advice in respect of any future application for a revised development.
Informative
Please note that this application would be liable for a payment under the Community Infrastructure Levy Regulations 2010 (as amended) if planning permission had been granted. Therefore if an appeal is lodged and subsequently allowed, the CIL liability will be applied. Any revised application would also be CIL liable.
Supporting documents:
- Report of Deputy Chief Executive (Place), item 122. PDF 411 KB
- Location Plan, item 122. PDF 328 KB
- Site Plan, item 122. PDF 249 KB
- 1622-01 Existing Floor Plans, item 122. PDF 321 KB
- 1622-14 Existing Elevations, item 122. PDF 148 KB
- 1622-07D Existing & Proposed Block Plans, item 122. PDF 197 KB
- 1622-06E Proposed Elevations Sheet 2, item 122. PDF 516 KB
- 1622-02F Proposed Ground Floor Plan, item 122. PDF 844 KB
- 1622-03F Proposed First & Second Floor Plans, item 122. PDF 224 KB
- 1622-04F Proposed Third Floor & Penthouse, item 122. PDF 207 KB
- 1622-08B Planning Section A-A, item 122. PDF 101 KB
- 1622-09D Proposed Basement, item 122. PDF 470 KB
- 1622-12A Proposed Ground Floor Plan Ventilation, item 122. PDF 250 KB
- 1622-11A Proposed Basement Ventilation, item 122. PDF 83 KB
- 1622-13A Proposed Roof Plan, item 122. PDF 314 KB
- Soft Landscape Plan, item 122. PDF 822 KB