Agenda item

17/00821/AMDT - Crown Secretarial College Ltd, 411 - 415 Sutton Road, Southend-on-Sea (Victoria Ward)

Minutes:

Proposal: Application to vary condition 2 (approved plans) of planning permission 16/01503/FULM (Demolish existing buildings, erect 3 storey block comprising of 44 flats, 252sq. m retail commercial floor space at ground floor, communal amenity space, landscaping, parking and associated works) dated 29/03/2017 to alter elevations, alter layout, alter unit mix.

Applicant:  Dove Jeffrey Homes Ltd

Agent:  FRONT Architecture Ltd

 

Resolved:  (a)  That the Deputy Chief Executive (Place), Director of Planning and Transport or Group Manager of Development Control & Building Control be DELEGATED to GRANT PLANNING PERMISSION subject to completion of a PLANNING AGREEMENT UNDER SECTION 106 of the Town and Country Planning Act 1990 (as amended) and all appropriate legislation to seek the following:

 

  A minimum of 9 units of affordable rented housing units (20% of overall provision) comprising 2x1 bed and 7x2 bed units.

  Traffic Regulation Order contribution of £4,000

  Provision of Travel Packs for residents.

  Retail Travel Plan.

 

(b)  The Deputy Chief Executive (Place) Director for Planning and Transport or the Group Manager (Planning & Building Control) be authorised to determine the application upon completion of the above obligation, so long as planning permission when granted and the obligation when executed, accords with the details set out in the report submitted and the conditions listed below:

 

01  The development hereby permitted shall be begun not later than 3 years beginning with the date of the original permission (29th March 2017).

 

Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990

 

02  The development shall be carried out in accordance with the approved plans: FRNT_16.563_200_P5 site plan and streetscene; FRNT_16.563_201_P4 Block A floor plans;  FRNT_16.563_202_P4 Block B floor plans; FRNT_16.563_204_P4 Block A elevations; FRNT_16.563_205_P4 Block B elevations; FRNT_16.563_203_P3 Block C Floor Plans; FRNT_16.563_206_P4   Block C elevations: Location plan 001. 

 

Reason: To ensure the development is carried out in accordance with the development plan.

 

03  No construction works above the floor slab level shall take place until samples of the materials to be used in the construction of the external elevations of the building hereby permitted, including balconies, balustrades, screening, fenestration, front porches and hoods have been submitted to and approved in writing by the local planning authority. Development shall be carried out only in accordance with the approved details.

 

Reason: To safeguard character and appearance of surrounding area in accordance with Policies KP2 and CP4 of the Core Strategy 2007, Policy DM1 and DM3 of the Development Management Document 2015 and the Design and Townscape Guide 2009

 

04  Hard and Soft Landscaping shall be carried out in accordance with details approved under application 17/00884/AD and plan No 2244-17 received on 14th August 2017 unless otherwise agreed in writing with the Local Planning Authority.  Hard Landscaping shall be completed prior to first occupation of the development and soft landscaping/planting shall be completed within the planting season following first occupation of the development. (or within any other time limit agreed in writing with the local planning authority)  The landscaping shall be permanently retained thereafter. If any trees are removed or found to be dying, severely damaged or diseased within 5 years of planting them, they must be replaced with trees of a similar size and species.

 

Reason: In the interests of visual amenity and the amenities of occupiers and to ensure a satisfactory standard of landscaping pursuant to Policy CP4 of the Core Strategy (2007) and Policy DM1 and DM3  of the Development Management Document 2015.

 

05  The development shall not be occupied until space has been laid out within the site in accordance with drawing No. 200 P4 for cars to be parked and for the loading and unloading of vehicles and for vehicles to turn so that they may enter and leave the site in forward gear.  The parking spaces shall be permanently retained thereafter for the parking of occupiers, staff and visitors to the development. 

 

Reason: To ensure that adequate car parking is provided and retained to serve the development in accordance with Policies CP3 of the Core Strategy (2007) and Policy DM15 of the Development Management Document 2015.

 

06  The development shall not be occupied until a car park management plan for the development has been submitted to and agreed in writing by the Local Planning Authority.  The development shall only be occupied in accordance with the agreed management plan.

 

Reason: To ensure that the car parking is satisfactorily managed in the interests of traffic management and highway safety in accordance with Policies KP2 and CP3 of the Core Strategy (2007) and Policy DM15 of the Development Management Document (2015)

 

07  The development shall not be occupied until a waste management plan and service plan has been submitted to and agreed in writing by the Local Planning Authority.  The waste management and servicing of the development shall thereafter be carried out only in accordance with the approved details. 

 

Reason:  To ensure that the development is satisfactorily serviced and that satisfactory waste management is undertaken in the interests of highway safety and visual amenity and to protect the character of the surrounding area, in accordance with Policies KP2 and CP3 of the Core Strategy (2007)  and  Policy DM15 of the Development Management Document (2015).

 

08  The development shall not be occupied until details of the secure, covered cycle parking spaces to serve the residential development and cycle parking spaces to serve the retail/commercial unit have been submitted to and agreed in writing by the Local Planning Authority. The approved scheme shall be implemented prior to first occupation and shall be retained thereafter. 

 

Reason: To ensure that adequate cycle parking is provided and retained to serve the development in accordance with Policies CP3 of the Core Strategy (2007) DPD1 and Policy DM15 of the Development Management Document (2015).

 

09  Construction shall be carried out in accordance with the Construction Method Statement approved under application 17/00883/AD unless otherwise agreed in writing with the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period.

 

Reason: In the interests of visual amenity and to protect the amenities of occupiers of the development and surrounding occupiers pursuant to Policies CP4 of the Core strategy (2007) and policies DM1 and DM3 of the Development Management Document (2015).

 

10  Before the retail use hereby permitted begins a scheme for the installation of equipment to control the emission of fumes and smell from the premises shall be submitted to and approved in writing by the Local Planning Authority. The scheme as approved shall be implemented before the retail unit is occupied. All equipment installed as part of the scheme shall thereafter be operated and maintained in accordance with the manufacturer's instructions.

 

Reason: In order to protect the amenities of occupiers of the development and surrounding occupiers and to protect the character and visual amenities of the area in accordance with policies Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015)

 

11  With reference to BS4142, the noise rating level arising from all plant and extraction/ventilation equipment should be at least 5dB(A) below the prevailing background at 3.5 metres from ground floor façades and 1 metre from all other façades of the nearest noise sensitive property with no tonal or impulsive character. 

 

Reason: In order to protect the amenities of occupiers of the development surrounding occupiers and to protect the character and visual amenities of the area in accordance with policies Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015.)

 

12  The retail use hereby permitted shall not be open to customers outside the following times: 07:00 to 23:00 hours on any day.

 

Reason: In order to protect the amenities of occupiers of the development surrounding occupiers and to protect the character and amenities of the area in accordance with policies Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015)

 

13  No deliveries or refuse collection shall be taken at or despatched from the retail unit outside the hours of 07:00-19:00hours Mondays to Fridays and 08:00-13:00hours on Saturdays nor at any time on Sundays, Bank or Public Holidays.

 

Reason: In order to protect the amenities of occupiers of the development surrounding occupiers and to protect the character and amenities of the area in accordance with policies Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

14  Other than the demolition, grubbing up of foundations and site clearance, no development shall take place until a site investigation of the nature and extent of contamination has been carried out in accordance with a methodology approved under application ref 17/00953/AD. The results of the site investigation shall be made available to the local planning authority before any construction begins.

 

If any contamination is found during the site investigation, a report specifying the measures to be taken to remediate the site to render it suitable for the development hereby permitted shall be submitted to and approved in writing by the local planning authority. The site shall be remediated in accordance with the approved measures before development begins. 

 

If, during the course of development, any further contamination is found which has not been identified in the site investigation, additional measures for the remediation of this source of contamination shall be submitted to and approved in writing by the local planning authority. The remediation of the site shall incorporate the approved additional measures before the development is brought into use.

 

Reason: To ensure that any contamination on the site is identified and treated so that it does not harm anyone who uses the site in the future, and to ensure that the development does not cause pollution to Controlled Waters in accordance with Core Strategy (2007) policy KP2 and Policies DM1 and DM14 of the Development Management Document (2015)

 

15  No development shall take place until details of the implementation, maintenance and management of a scheme for surface water drainage works have been submitted to and approved by the local planning authority. The scheme shall be implemented and thereafter managed and maintained in accordance with the approved details. Those details shall include:

 

i)  An investigation of the feasibility of infiltration SUDS as the preferred approach to establish if the principles of any infiltration based surface water drainage strategy are achievable across the site, based on ground conditions.  Infiltration or soakaway tests should be provided which fully adhere to BRE365 guidance to demonstrate this.  Infiltration features should be included where infiltration rates allow; 

ii)  Drainage plans and drawings showing the proposed locations and dimensions of all aspects of the proposed surface water management scheme.  The submitted plans should demonstrate the proposed drainage layout will perform as intended based on the topography of the site and the location of the proposed surface water management features; 

iii)   a timetable for its implementation; and

vii)  a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public body or statutory undertaker, or any other arrangements to secure the operation of the sustainable drainage scheme throughout its lifetime.

 

Reason: To prevent flooding by ensuring the satisfactory storage and disposal of surface water from the site for the lifetime of the development and to prevent environmental and amenity problems arising from flooding in accordance with Policy KP2  and CP4 of the Core Strategy (2007) and area in accordance with Policy DM2 of the Development Management Document 2015.

 

16  Details of any external lighting shall be submitted to and approved in writing by the local planning authority before the retail use hereby permitted begins and residential apartments are occupied. The development shall be carried out in accordance with the approved details.  No additional external lighting shall be installed on the building without the consent of the Local Planning Authority. 

 

Reason: In the interest of the visual amenities and character of the area, and to protect the amenities of surrounding occupiers in accordance with policies  Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 of the Development Management Document (2015).

 

17  No construction works above the level of the floor slab shall take place until a scheme for protecting the proposed dwellings from noise from road traffic has been submitted to and approved in writing by the Local. Planning Authority.  The details shall include the insulation scheme including predicted internal Lmax and LAeq levels for the noise sources identified in the noise assessment.  Glazing and ventilation shall be selected with relevant acoustic properties as outlined in the Noise Assessment submitted with application 16/01503/FULM and dated 18 December 2014.  The agreed noise prevention measures will be installed prior to first occupation of the dwellings and retained at all times thereafter.

 

Reason: In order to the protect the amenities of future residents in accordance with policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

18  Demolition or construction works shall not take place outside 07:30hours to 18:00hours Mondays to Fridays and 08:00hours to 13:00hours on Saturdays nor at any time on Sundays or Bank Holidays.

 

Reason: In order to protect the amenities of occupiers of the development surrounding occupiers and to protect the character the area in accordance with policies Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

19  Landscape management of the development, including management responsibilities and maintenance for all landscape areas shall be carried out only  in accordance with details approved under application 17/00884/AD.

 

Reason: In the interests of visual amenity and the amenities of occupiers and to ensure a satisfactory standard of landscaping pursuant to Policy CP4 of the Core Strategy (2007) and Policy DM1 of the Development Management Document (2015.)

 

20  No construction works above the level of the floor slab shall take place until details of the proposed Photovoltaic cells set out in the Energy and Sustainability Statement by Fusion 13 submitted with application 16/01503/FULM have been submitted to and approved in writing by the Local Planning Authority.  The scheme as approved shall be implemented and brought into use on first occupation of the development. 

 

Reason: To ensure the development maximises the use of renewable and recycled energy, water and other resources, in accordance with Policy KP2 of the Core Strategy (2007) and Policy DM2 of the Development Management Document 2015.

 

21  Prior to the installation of any shopfront, the details of the design, materials, glazing, doors, shutters, signage and lighting shall be submitted to and approved in writing by the Local Planning Authority.  The retail unit development shall be carried out in accordance with the approved details before it is occupied and permanently retained thereafter.  

 

Reason: In order to protect the character and visual amenities of the area in accordance with policies KP2 and CP4 of the Core Strategy (2007) and Policy DM1 of the Development Management Document 2015.

 

22  Notwithstanding the provisions of the Town and Country Planning (Control of Advertisements) Regulations 2007, or any order revoking and re-enacting that Order with or without modification, no advertisement shall be displayed on the building without the prior written consent of the Local Planning Authority. 

 

Reason: In the interest of the visual amenities of the area in accordance with policies  KP2 and CP4 of the Core Strategy (2007) and  Policy DM1 and DM13 of the Development Management Document (2015).

 

23  Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any order revoking, re-enacting or modifying that Order), no structures such as canopies, fences, loggias, trellises or satellite or radio antennae shall be installed within the development or on the buildings unless otherwise agreed in writing by the Local Planning Authority. 

 

Reason: In order to protect the character and visual amenities of the development and surrounding area in accordance with policies KP2 and CP4 of the Core Strategy (2007) and Policy DM1 of the Development Management Document (2015)

 

24  The commercial floorspace hereby approved shall only be occupied for uses falling within Use Class A1 retail and shall not be used for any other purpose and for no other purpose including any within Classes A, C3 or D1 of the Town and Country Planning (Use Classes) Order 1987 as amended (or any statutory modification or re-enactment or replacement thereof (as the case may be) for the time being in force).  The hereby approved Use Class A1 retail floorspace shall also not be used for any alternative uses otherwise permitted under the provisions of any development order made under Section 59 of the Town and Country Planning Act 1990 (or any order revoking or re-enacting that Order).

 

Reason: In order to protect the amenities of occupiers of the development surrounding occupiers and to protect the character and amenities of the area in accordance with Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

25  The development shall be carried out in accordance with the Method Statements for Tree Protection and Tree Works approved under application17/00885/AD unless otherwise agreed in writing by the Local Planning Authority. 

 

Reason In the interests of amenity, to protect existing trees and to ensure a satisfactory standard of landscaping pursuant to Policy CP4 of the Core Strategy (2007) and policy DM1 of the Development Management Document (2015)

 

26  The development shall not be occupied until new accesses, removal of the existing redundant crossovers and street furniture, loading bays, on street car parking spaces and public realm improvements in accordance with details approved under application 17/00974/AD have been implemented in full and (prior to this) the Council as Highways Authority has approved in writing a full scheme of highways works and the relevant associated highways approvals are in place.

 

Reason: In the interests of sustainability, accessibility, highways management, efficiency and safety in accordance Core Strategy (2007) policies KP2, KP3 and CP3 and policies  DM1and DM15 of the Development Management Document (2015)

 

Informatives

 

01  The applicant is reminded that this permission does not bestow compliance with other regulatory frameworks. In particular your attention is drawn to the statutory nuisance provisions within the Environmental Protection Act 1990 (as amended) and also to the relevant sections of the Control of Pollution Act 1974. The provisions apply to the construction phase and not solely to the operation of the completed development. Contact 01702 215005 for more information.

 

02  For further guidance on the control of odour and noise from ventilation systems you are advised to have regard to – Guidance on the Control of Odour and Noise from Commercial Kitchen Exhaust Systems published by DEFRA. This can be downloaded free from www.DEFRA.Gov.UK

 

03  The applicant is reminded that this permission does not bestow compliance with the Licensing Act 2003. Applicants should contact the Council’s Licensing Team for more advice on 01702 215005.

 

04  Anglian Water has assets close to or crossing this site or there are assets subject to an adoption agreement. Therefore the site layout should take this into account and accommodate those assets within either prospectively adoptable highways or public open space. If this is not practicable then the sewers will need to be diverted at the developers cost under Section 185 of the Water Industry Act 1991. or, in the case of apparatus under an adoption agreement, liaise with the owners of the apparatus. It should be noted that the diversion works should normally be completed before development can commence.

 

05  An application to discharge trade effluent must be made to Anglian Water and must have been obtained before any discharge of trade effluent can be made to the public sewer. Anglian Water recommends that petrol / oil interceptors be fitted in all car parking/washing/repair facilities. Failure to enforce the effective use of such facilities could result in pollution of the local watercourse and may constitute an offence. Anglian Water also recommends the installation of a properly maintained fat traps on all catering establishments. Failure to do so may result in this and other properties suffering blocked drains, sewage flooding and consequential environmental and amenity impact and may also constitute an offence under section 111 of the Water Industry Act 1991.

 

06  There is clear evidence that the installation of Automatic Water Suppression Systems (AWSS) can be effective in the rapid suppression of fires. Essex County Fire and Rescue Service (ECFRS) therefore uses every occasion to urge building owners and developers to consider the installation of AWSS. ECFRS are ideally placed to promote a better understanding of how fire protection measures can reduce the risk of life, business continuity and limit the impact of fire on the environment and local economy. Even where not required under Building Regulation’s guidance, ECFRS would strongly recommend a risk base approach to the inclusion of AWSS, which can substantially reduce the risk to life and of property loss. We would also encourage developers to use them to allow design freedom, where it can be demonstrated that there is an equivalent level of safety and that the functional requirements of the regulations are met. 

 

07  The applicant is reminded that additional water supplies for fire fighting may be necessary for this development. The applicant is urged to contact the Water Technical Officer at Service Headquarters tel 01376 576342

 

08  Please note that the proposed development subject of this application is liable for a charge under the Community Infrastructure Levy Regulations 2010 (as amended). Enclosed with this decision notice is a CIL Liability Notice for the applicant’s attention and any other person who has an interest in the land. This contains details of the chargeable amount and how to claim exemption or relief if appropriate. There are further details on this process on the Council's website at www.southend.gov.uk/cil.

 

09  In relation to Condition 26; you are advised to contact Highways Engineer – Martin Warren; (Tel: 01702 215003) to discuss the requisite Highways Licence/Agreements under the Highways Act 1980. You are advised that a Highways Licence/Agreement needs to be in place before any works are carried out to the public highway and any works to public transport infrastructure (e.g. bus stops) will need to be carried out by a Council approved contractor.

 

10  Informative (approval of S73 applications where original permission granted post-CIL charging AND there is no net increase in floorspace):

Community Infrastructure Levy (CIL): This application has been made pursuant to Section 73 of the Town and Country Planning Act 1990 and as such CIL Regulation 9(6) applies. You are advised that as the amount of CIL payable would not change from the previous permission ref. 16/01503/FULM, the chargeable development is the development for which permission was granted by the previous permission as if that development was commenced. Therefore, CIL Liability Notice ref. 16/01503/FULM/0001 still applies to the permission hereby granted and is enclosed for your reference.

 

(c) In the event that the planning obligation referred to in part (a) above has not been completed by 20th September 2017 the Director of Planning and Transport or Group Manager (Planning & Building Control) be authorised to refuse planning permission for the application on the grounds  that the development will not :-

 

i) provide for improvements to the public highway and the public realm within the vicinity of the site;

ii) provide an effective means of enforcing/delivering a Travel Plan;

iii) provide for a satisfactory provision of public art;

iv) provide for a satisfactory method of servicing the development;

v) provide for affordable housing.

 

As such, the proposal would not make a satisfactory contribution towards the quality of the built environment within the vicinity of the site, would traffic congestion and be to the detriment of highway safety and is likely to place increased pressure on public services and infrastructure to the detriment of the general amenities of the area, contrary to Policies KP2, KP3, CP3, CP4 and CP6 of the Core Strategy, Policies DM1, DM3, DM7, and DM15 of the Development Management DPD 2015.

 

The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including planning policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework.  The detailed analysis is set out in a report on the application prepared by officers.

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.