Agenda item

17/00664/FULM - Toomey Nissan, 831-837 London Road, Westcliff-on-Sea, SS0 9TE (Blenheim Park Ward)

Minutes:

Proposal:  Demolition of vacant car showroom and workshops, erect four storey building with retail (Class A1) at ground floor level, 31 retirement apartments above with balconies, install terrace at third floor to front elevation, layout parking and install vehicular access on to London Road (Amended Proposal)

Applicant:  Mr J. Brook, Laindon Holdings Limited

Agent:  Mr C. Green, Town Planning Services

 

Mr McLernon, a local resident, spoke as an objector to the application.  Mr Green, the applicant, responded.

 

Resolved:  That planning permission be GRANTED subject to the following conditions:

 

01.  The development hereby permitted shall be begun not later than 3 years beginning with the date of this permission.

 

Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990

 

02.  The development shall be carried out in accordance with the approved plans:  6766_P12; 6766_P11A; 6766_P300; 6766_P301.0B; 6766_P301.1C; 6766_P301.2C; 6766_P301.3C; 6766_P301.4C; 6766_P301.5C; 6766_P301.6; 6766_P306.1C; 6766_P307.2D; 6766_P307.3C; 6766/P307.1C.

 

Reason: To ensure the development is carried out in accordance with the development plan.

 

03.  Each of the units hereby permitted shall be only occupied by:

 

(i) persons aged 65 years or older; or

(ii) persons living as part of a single household in the development with such a person or persons aged 65 years or older; or

(iii) persons who were living as part of a single household in the development with such a person or persons who have since died.

 

Reason: To define the scope of this permission with respect to parking provision, amenity space, general living conditions and the provision of affordable housing and infrastructure required to support the development, in accordance with Core Strategy (2007) Policies KP2, KP3, CP4, CP6 and CP8 and Policies DM1 and DM3 of the Development Management Document (2015).

 

04  The  communal  spaces  and  guest facility as shown on the approved plans shall be provided before the proposal is occupied and shall not be altered or removed in  any  way and be retained in perpetuity  unless  otherwise  agreed  in  writing  by  the Local  Planning Authority. 

Reason: To ensure that amenity space and living conditions are safeguarded for future occupiers of the development in accordance with Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Council’s Development Management Document (2015) and advice contained within the Design and Townscape Guide (2009).

 

05.  Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works above the ground floor (parking) slab level shall take place until samples of the materials to be used in the construction of the external elevations of the building hereby permitted, including projecting elevational box details including projection, reveals, balustrade, lighting, entrance canopy, screening, fenestration, have been submitted to and approved in writing by the local planning authority. Development shall be carried out in full accordance with the approved details.

 

Reason: To safeguard character and appearance of surrounding area in accordance with Policies KP2 and CP4 of the Core Strategy (2007) and policies DM1 and DM3 of the Development Management Document (2015).

 

06.  The car parking spaces, cycle storage and refuse store shall be implemented in accordance with plan no.  6766/301.4  Revision  C  prior  to occupation  of  the  retail  and residential uses  hereby  approved  to provide not less than 29 car parking spaces for the residential use, 14 car parking spaces for the retail use and 5 cycle parking spaces and  shall  thereafter  be permanently  retained  unless  otherwise  agreed  in  writing  by  the  Local Planning Authority.  

 

Reason: To ensure that adequate car parking is provided and retained to serve the development in accordance with Policies CP3 of the Core Strategy (2007) and Policy DM15 of the Development Management Document (2015).

 

07.  Notwithstanding the details shown on the plans submitted otherwise hereby approved the development hereby permitted shall not be commenced until the Local Planning Authority has approved in writing a full scheme of highways works (including detailed designs and contract details) and the relevant associated highways approvals are in place, in relation to the new service layby and new pedestrian crossing point. The works shall thereafter be undertaken in accordance with the approved details and completed prior to first occupation of the development hereby approved unless otherwise agreed in writing by the local planning authority.

 

Reason: In the interests of highways management and safety in accordance with Core Strategy (2007) policies KP2, CP3, CP4; Development Management Document (2015) policy DM15.

 

08.  No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be fully adhered to throughout the construction period. The Statement shall provide, amongst other things, for:

 

i)  the parking of vehicles of site operatives and visitors

ii)  loading and unloading of plant and materials

iii)  storage of plant and materials used in constructing the development

iv)  the erection and maintenance of security hoarding 

v)  measures to control the emission of dust and dirt during construction

vi)  a scheme for recycling/disposing of waste resulting from demolition and construction works that does not allow for the burning of waste on site.

Reason: In the interests of visual amenity and to ensure a satisfactory standard of landscaping pursuant to Policy CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

09.  No development shall take place until a site investigation of the nature and extent of contamination at this site has been carried out in accordance with a methodology which has previously been submitted to and approved in writing by the Local Planning Authority. The results of the site investigation shall be made available to the local planning authority before any development begins. If any contamination is found during the site investigation, a report specifying the measures to be taken to remediate the site to render it suitable for the development hereby permitted shall be submitted to and approved in writing by the Local Planning Authority. The site shall be remediated in accordance with the approved measures before construction begins. If, during the course of development, any contamination is found which has not been identified in the site investigation construction shall stop immediately and additional measures for the remediation of this source of contamination shall be submitted to and approved in writing by the Local Planning Authority before construction continues. The remediation of the site shall incorporate the approved additional measures before construction continues. 

 

Reason: To ensure that any contamination on the site identified and treated so that it does not harm anyone who uses the site in the future, and to ensure that the development does not cause pollution to controlled waters in accordance with policy DM14 of the Development Management Document (2015).

 

10.  The retail unit hereby approved shall not be open for customers outside the following hours: - 07:00 hours to 23:00 hours Monday to Sundays and Bank Holidays.

 

Reason:  To  protect  residential  amenity  and  general  environmental quality in accordance with the National Planning Policy Framework, Core  Strategy (2007)  Policies KP2  and  CP4,  and  Policies DM1 and DM3 of the Development Management Document.

 

11.  All servicing of the site must take place between 07:00 to 23: 00 hours Monday to Sunday, with the exception of newspaper deliveries. Servicing includes loading and unloading goods from vehicles and transferring rubbish outside the building. 

 

Reason:  To  protect  residential  amenity  and  general  environmental quality in accordance with the National Planning Policy Framework, Core  Strategy (2007)  Policies KP2  and  CP4,  and  Policies DM1 and DM3 of the Development Management Document.

 

12.  No  dust  or  fume  extraction  or  filtration  equipment  or  air  conditioning, ventilation, or refrigeration equipment shall be installed at the site until full details of its design, siting, discharge points and predicted acoustic performance have been submitted to and approved by the Local Planning Authority. The equipment shall only be installed in accordance with the approved details and shall be maintained in good working order thereafter.

 

Reason: To safeguard the character and amenities of the area and in particular to protect the amenities of nearby residential occupiers of the development  in  accordance  with  Policies  KP2  and  CP4  of  the  Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

13.  No construction works above the slab level shall take place until full details of both hard and soft landscape works to take place at the site have been submitted to and approved in writing by the local planning authority.  These details shall include: proposed finished levels or contours; means of enclosure (including any gates to the car parks); car parking layouts;  other vehicle and pedestrian access and circulation areas;  hard surfacing materials;  minor artefacts and structures.  Details for the soft landscape works shall include the number, size and location of any shrubs, trees and plants to be planted together with a planting specification, the management of the site (e.g. the uncompacting of the site prior to planting) and the initial tree planting and tree staking details.  The development shall be implemented in full accordance with the approved details before it is occupied or brought into use.

 

Reason: In the interests of visual amenity and the amenities of occupiers and to ensure a satisfactory standard of landscaping pursuant to Policies KP2 and CP4 of the Core Strategy DPD1 with CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

14.  The development shall not be occupied until a waste management plan and service plan has been submitted to and agreed in writing by the Local Planning Authority.  The waste management and servicing of the development shall thereafter be carried out only in accordance with the approved details in perpetuity.  

 

Reason:  to ensure that the development is satisfactorily serviced and that satisfactory waste management is undertaken in the interests of highway safety and visual amenity and to protect the character of the surrounding area, in accordance with Policies KP2 and CP3 of the Core Strategy (2007) and  Policy DM15 of the Development Management Document (2015) and Design and Townscape Guide (2009).

 

15.  No development shall take place until details of the implementation, maintenance and management of a scheme for surface water drainage works (incorporating Sustainable Urban Drainage (SUDs) Principles) have been submitted to and approved by the Local Planning Authority. The scheme shall be implemented in accordance with the approved details before the development is occupied or brought into use and be maintained as such thereafter. Those details shall include:

 

i)   An investigation of the feasibility of infiltration SUDS as the preferred approach to establish if the principles of any infiltration based surface water drainage strategy are achievable across the site, based on ground conditions.  Infiltration or soakaway tests should be provided which fully adhere to BRE365 guidance to demonstrate this.  Infiltration features should be included where infiltration rates allow;

 

ii)  Drainage plans and drawings showing the proposed locations and dimensions of all aspects of the proposed surface water management scheme.  The submitted plans should demonstrate the proposed drainage layout will perform as intended based on the topography of the site and the location of the proposed surface water management features; 

 

iii)   a timetable for its implementation; and

 

vii)  a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public body or statutory undertaker, or any other arrangements to secure the operation of the sustainable drainage scheme throughout its lifetime.

 

Reason: To prevent flooding by ensuring the satisfactory storage and disposal of surface water from the site for the lifetime of the development and to prevent environmental and amenity problems arising from flooding in accordance with Policies  KP2 and CP4 of the Core Strategy (2007) and  Policy DM2 of the Development Management Document (2015).

 

16.  A scheme detailing how at least 10% of the total energy needs of the development will be supplied using on site renewable sources must be submitted to and agreed in writing prior to occupation of the development hereby approved by the Local Planning Authority and implemented in full prior to the first occupation of the development. This provision shall be made for the lifetime of the development.

 

Reason: In the interests of providing sustainable development in accordance with Policy KP2 of the Core Strategy (2007) and Development Management Document (2015) Policy DM2.

 

17.  Demolition or construction works associated with this permission shall not take place outside 08:00 hours to 18:00hours Mondays to Fridays and 08:00hours to 13:00hours on Saturdays and at no time Sundays or Bank Holidays.

 

Reason: In order to protect the amenities of occupiers of the development surrounding occupiers and to protect the character the area in accordance with policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

18.  Notwithstanding the provisions of Part 3 of Schedule 2 of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) or any revocation, amendment or adaptation of this legislation of for the time being maybe in force, the retail floorspace hereby approved shall be used only for purposes falling within Use Class A1 and for no other purpose.

 

Reason: To safeguard the amenities of adjoining residents, in accordance with policies KP2 and CP4 of the Core Strategy, policies DM1 and DM3 of the Development Management Document and the Design and Townscape Guide.

 

19.  Before the development is occupied or brought into use, the development hereby approved shall be carried out in a manner to ensure the flats comply with Building Regulation part M4(2) ‘accessible and adaptable dwellings’.

 

Reason: To ensure the residential units hereby approved provides high quality and flexible internal layouts to meet the changing needs of residents in accordance with the National Planning Policy Framework, Core Strategy (2007) policy KP2, Development Management Document (2015) policy DM2 and Design and Townscape Guide (2009).

 

20.  The development shall not be occupied until details of the privacy screens to be installed at the site have been submitted to and approved in writing by the local planning authority. The development shall be occupied in full accordance with the approved details before it is occupied and be maintained as such in perpetuity thereafter.

 

Reason: To safeguard the privacy and amenities of occupiers of neighbouring residential properties and the future occupiers of the proposed residential dwellings in accordance with the National Planning Policy Framework (2012), Core Strategy (2007) policies KP2 and CP4, and Development Management Document (2015) Policies DM1 and DM3 and advice contained within the Design and Townscape Guide (2009).

 

21.  Prior to their occupation the proposed first floor windows in the north elevation serving the kitchen to flat 1 hereby approved shall be glazed in obscure glass (the glass to be obscure to at least Level 4 on the Pilkington Levels of Privacy, or such equivalent as may be agreed in writing with the local planning authority) and fixed shut and unopenable, except for any top hung light which shall be a minimum of 1.7 metres above internal floor level. In the case of multiple or double glazed units at least one layer of glass in the relevant units shall be glazed in obscure glass to at least Level 4. The windows shall be retained as such in perpetuity thereafter.

 

Reason: To safeguard the privacy and amenities of occupiers of neighbouring residential properties and the future occupiers of the proposed residential dwellings in accordance with the National Planning Policy Framework (2012), Core Strategy (2007) policies KP2 and CP4, and Development Management Document (2015) Policies DM1 and DM3 and advice contained within the Design and Townscape Guide (2009).

 

Informatives

 

1.   Please note that the development the subject of this application is liable for a charge under the Community Infrastructure Levy Regulations 2010 (as amended). A Community Infrastructure Levy (CIL) Liability Notice will be issued as soon as practicable following this decision notice. This contains details including the chargeable amount, when this is payable and when and how exemption or relief on the charge can be sought. You are advised that a CIL Commencement Notice (CIL Form 6) must be received by the Council at least one day before commencement of development. Receipt of this notice will be acknowledged by the Council.

 

Please ensure that you have received both a CIL Liability Notice and acknowledgement of your CIL Commencement Notice before development is commenced. Most claims for CIL relief or exemption must be sought from and approved by the Council prior to commencement of the development. Charges and surcharges may apply, and exemption or relief could be withdrawn if you fail to meet statutory requirements relating to CIL. Further details on CIL matters can be found on the Council's website at www.southend.gov.uk/cil.

 

2.  The applicant is reminded that this permission does not bestow compliance with other regulatory frameworks. In particular your attention is drawn to the statutory nuisance provisions within the Environmental Protection Act 1990 (as amended) and also to the relevant sections of the Control of Pollution Act 1974. The provisions apply to the construction phase and not solely to the operation of the completed development. Contact 01702 215005 for more information.

 

3.  In relation to condition 07 above, the works to existing highway will require a Section 278 agreement or Highways Licence.

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.