Agenda item

17/01319/FULM - Empire Theatre, Alexandra Street, Southend on Sea (Milton Ward)

Minutes:

Proposal:  Erect four storey building comprising 24 self-contained flats with balconies and terraces, associated amenity space, form parking, form commercial units (Use Classes A1, A2 and A3) and a non-residential institution unit (Class D1) fronting Clarence Street at ground floor level

Applicant:  Sky Eagle Properties Limited

Agent:  Phase 2 Planning

 

Resolved: 

 

(a)  That the Deputy Chief Executive (Place), Director of Planning and Transport or Group Manager of Planning & Building Control be to GRANT PLANNING PERMISSION,  subject to completion of a PLANNING AGREEMENT under section 106 of the Town and Country Planning Act 1990 (as amended) and all appropriate legislation to secure the provision of:

 

  5 affordable units comprising 3 affordable rent units and 2 shared ownership units. The mix to include 3 x 1 bedroom and 2 x 2 bedroom flats.

  a financial contribution towards secondary education provision of £9042.42 (index-linked), specifically for Eastwood Academy, which is payable prior commencement to the development

 

(b)  The Deputy Chief Executive (Place), Director of Planning and Transport or the Group Manager (Planning & Building Control) be authorised to determine the application upon completion of the above obligation, so long as planning permission when granted and the obligation when executed, accords with the details set out in the report submitted and the conditions listed below:

 

01  The development hereby permitted shall be begun not later than 3 years beginning with the date of this permission.

 

Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.

 

02  The development shall be carried out in accordance with the approved plans: 1267-01 Revision B; 1267-09; 1267-10 Revision J; 1267-11; 1267-12; 1267-13; 1267-14; 1267-15; 1267-24 Revision H; 1267-25 Revision G; 1267-03 Revision M; 1267-04 Revision L; 1267-05 Revision H; 1267-06 Revision H; 1267-27 Revision A; 1267-50 Revision C.

 

Reason: To ensure the development is carried out in accordance with the development plan.

 

03  Notwithstanding the details shown on the plans submitted and otherwise hereby approved the development hereby permitted shall not commence, other than for groundworks and site preparation works, unless and until details and appropriately sized samples of the materials to be used for all the external surfaces of the proposed buildings at the site including facing materials, roof detail, windows, doors, including fire doors to the stairwells and commercial units, balustrading, fascia, soffits, balconies, balustrades, screening, fascia’s, shopfronts and forecourt area have been submitted to and approved in writing by the local planning authority. The works must then be carried out in full accordance with the approved materials, details and specifications before the dwellings or non-residential units hereby approved are first occupied.

 

Reason: To safeguard character and appearance of the area and amenities of neighbouring occupiers in accordance with Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1 and DM3 of the Development Management Document (2015) and the Design and Townscape Guide (2009). Given the nature of the development propose, the details sought and the objectives of the condition it is fundamental that information required is provided prior to the commencement of any development.

 

04  Notwithstanding the details shown on the plans hereby approved no development shall take place, other than demolition ground and site preparation works, until there has been submitted to and approved by the Local Planning Authority a scheme of hard and soft landscaping for the site.  This shall include details of the number, size and location of the trees and shrubs to be planted together with a planting specification, details of measures to enhance biodiversity within the site; details of the treatment of all hard and soft surfaces (including any earthworks to be carried out) and all means of enclosing and subdividing the site and/or any amenity areas.

 

Reason: In the interests of visual amenity and the amenities of occupiers and to ensure a satisfactory standard of landscaping pursuant to Policies KP2 and CP4 of the Core Strategy, Policies DM1 and DM3 of the Development Management Document (2015) and the Design and Townscape Guide (2009).

 

05  All planting in the approved landscaping scheme shall be carried out within the first available planting season following first occupation of any of the residential or commercial units within the development.  Any shrubs dying, removed, being severely damaged or becoming seriously diseased within five years of planting shall be replaced with trees or shrubs of such size and species as may be agreed with the Local Planning Authority. Hard landscaping and means of enclosure shall be implemented in full accordance with the approved scheme prior to occupation of any part of the development hereby approved.

 

Reason: In the interests of visual amenity and to ensure a satisfactory standard of landscaping, pursuant to Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

06  The development shall not be occupied until 8 on site car parking spaces have been provided and made available for use in full accordance with drawing 1267-03 Revision M, together with properly constructed vehicular access to the adjoining highway, all in accordance with the approved plans.  The parking spaces shall be permanently maintained thereafter solely for the parking of occupiers of and visitors to the development.

 

Reason: To ensure that adequate car parking is provided and retained to serve the development in accordance with Policy DM15 of the Council’s Development Management Document (2015) and Policy CP3 of the Core Strategy (2007).

 

07  The development shall not be occupied until the secure, covered cycle parking spaces to serve the development as shown on drawing 1267-03 Revision M have been provided at the site and made available for use for occupiers of the development in full accordance with the approved plans. The approved facility shall be permanently maintained thereafter. 

 

Reason:  To ensure the provision of adequate cycle parking and refuse storage in accordance with Policy CP3 of the Core Strategy (2007) and Policies DM3, DM8 and DM15 of Development Management Document (2015).

 

08  Prior to the occupation of any of the residential units within the development hereby approved, each dwelling shall be provided with a Residential Travel Information Pack, containing information on public transport services within the area, which has been previously submitted to and agreed in writing by the Local Planning Authority.

 

Reason:  In the interests of sustainability and highways efficiency in accordance with the National Planning Policy Framework (2012), Core Strategy (2007) Policies KP1, KP2, KP3 and CP3 and Development Management Document (2015) Policy DM15.

 

09  No part of the mixed use development hereby approved shall be occupied until a waste management plan has been submitted to and agreed in writing by the Local Planning Authority.  The waste management and servicing of the development shall thereafter be carried out solely in accordance with the approved details which shall include details of refuse storage facilities and waste servicing arrangements.

 

Reason:  To ensure that the development is satisfactorily serviced and that satisfactory waste management is undertaken in the interests of highway safety and visual amenity and to protect the character of the surrounding area, in accordance with Policies KP2 and CP3 of the Core Strategy (2007) and Policy DM15 of the Development Management Document (2015) and Design and Townscape Guide (2009).

 

10  Notwithstanding the details shown in the plans submitted and otherwise hereby approved none of the building hereby granted consent shall be occupied unless and until plans and other appropriate details are submitted to the Local Planning Authority and approved in writing which specify all windows in the proposed buildings that are to be permanently glazed with obscured glass and fixed shut or provided with only a fanlight opening and the manner and design in which these windows are to be implemented. Before the buildings hereby approved are occupied the development shall be implemented in full accordance with the details and specifications approved under this condition and shall be permanently retained as such thereafter.

 

Reason: In order to protect the amenities of occupiers of the development surrounding occupiers and to protect the character the area in accordance with policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

11  Notwithstanding the details shown in the plans submitted and otherwise hereby approved none of the building hereby granted consent shall be occupied unless and until plans and other appropriate details are submitted to the Local Planning Authority and approved in writing which specify the size, design, materials and location of all privacy screens to be fixed to the proposed buildings. Before the buildings hereby approved are occupied the development shall be implemented in full accordance with the details and specifications approved under this condition and shall be permanently retained as such thereafter.

 

Reason: In order to protect the amenities of occupiers of the development surrounding occupiers and to protect the character the area in accordance with policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

12  No extraction and ventilation equipment for the proposed non-residential uses shall be installed until and unless full details of its location, design and technical specifications and a report detailing any mitigation measures proposed in respect of noise and odour impacts has been submitted to, and approved in writing by, the Local Planning Authority. The installation of extraction equipment shall be carried out in full accordance with the approved details and specifications and any noise and odour mitigation measures undertaken in association with the agreed details before the extraction and ventilation equipment is brought into use. With reference to British Standards BS4142 the noise rating level arising from all plant and extraction/ventilation equipment shall be at least 5dbB(A) below the prevailing background at 3.5 metres from the ground floor facades and 1m from all other facades of the nearest noise sensitive property with no tonal or impulsive character.

 

Reason: To protect the amenities of the occupiers from undue noise and disturbance in order to protect their amenities in accordance with Core Strategy (2007) policies KP2 and CP4, Policies DM1, DM3 and DM8 of the Development Management Document (2015) and Design and Townscape Guide (2009).

 

13  The noise mitigation measures outlined in the Environmental Noise Assessment Report No. dB/Phase2/91064Noise/ML/001 dated 26th June 2017 to protect future residents of the building from the impact of vehicular noise along Alexandra Street and Clarence Street and noise from surrounding commercial activity including glazing and ventilation measures shall be implemented in their entirety prior to occupation of the dwellings hereby approved and shall be maintained in perpetuity thereafter.

 

Reason: To protect the amenities of the occupiers from undue noise and disturbance in order to protect their amenities in accordance with Core Strategy (2007) policies KP2 and CP4, Policies DM1, DM3 and DM8 of the Development Management Document (2015) and Design and Townscape Guide (2009).

 

14  The non-residential units hereby approved shall not be open for customers outside the following hours: - 0700 hours to 2300 hours on any day.

 

Reason:  To protect residential amenity and general environmental quality in accordance with the National Planning Policy Framework, Core  Strategy (2007), Policies KP2 and CP4, and Policies DM1 and DM3 of the Development Management Document (2015).

 

15  The development shall not be occupied until a waste management plan and service delivery plan has been submitted to and agreed in writing by the Local Planning Authority.  The waste management and servicing of the development shall thereafter be carried out only in accordance with the approved details in perpetuity. 

 

Reason: In order to protect the amenities of occupiers of the development surrounding occupiers and to protect the character the area in accordance with policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

16  Other than the demolition, grubbing up of foundations and site clearance, no development shall take place until a site investigation of the nature and extent of any land contamination present has been carried out in accordance with a methodology which has previously been submitted to and approved in writing by the local planning authority.

 

The results of the site investigation shall be made available to the local planning authority before any construction begins. If any contamination is found during the site investigation, a report specifying the measures to be taken to remediate the site to render it suitable for the development hereby permitted shall be submitted to and approved in writing by the local planning authority before any construction begins. The site shall be remediated in accordance with the approved remediation measures before the development hereby approved is occupied and evidence to demonstrate that the remediation has taken place shall be submitted in writing to the Local Planning Authority before the development is occupied. 

 

If, during the course of development, any contamination is found which has not been identified in the site investigation, development shall stop and additional measures for the remediation of this source of contamination shall be submitted to and approved in writing by the local planning authority. The remediation of the site shall incorporate the approved additional measures and these shall be fully implemented before the site is occupied.

 

Reason: To ensure that any contamination on the site is identified and treated so that it does not harm anyone who uses the site in the future, and to ensure that the development does not cause pollution to Controlled Waters in accordance with Core Strategy (2007) Policies KP2 and CP4 and Policies DM1 and DM14 of the Development Management Document (2015). 

 

17  Before the development is occupied or brought into use, the development hereby approved shall be carried out in a manner to ensure that 2 of the flats hereby approved comply with the building regulation M4 (3) ‘wheelchair user dwellings’ standard and the remaining 22 flats comply with building regulation part M4(2) ‘accessible and adaptable dwellings’ standard.

 

Reason: To ensure the residential units hereby approved provides high quality and flexible internal layouts to meet the changing needs of residents in accordance with National Planning Policy Framework, (2012), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1, DM8 and Design and Townscape Guide (2009).

 

18  Details of the external lighting to be installed in the development hereby approved including for the public right of way within the application site shall be submitted to and approved in writing by the local planning authority before any part of the development is first occupied or brought into use.  Development shall be carried out in accordance with those approved details before the development is occupied or brought into use. 

Reason: In the interest of the safety and amenities of the area, and to protect the amenities of surrounding occupiers in accordance with policies  KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

19  Prior to occupation of the development hereby approved a scheme detailing how at least 10% of the total energy needs of the development will be supplied using on site renewable sources must be submitted to and agreed in writing prior to occupation of the development hereby approved by the Local Planning Authority and implemented in full prior to the first occupation of any part of the development. This provision shall be made for the lifetime of the development.

 

Reason: In the interests of providing sustainable development in accordance with Policy KP2 of the Core Strategy (2007) and the Design and Townscape Guide (2009).

 

20  Prior to occupation any part of the development hereby approved details of the water efficient design measures set out in Policy DM2 (iv) of the Development Management Document to limit internal water consumption to 105 litres per person per day (lpd) (110 lpd when including external water consumption), including measures of water efficient fittings, appliances and water recycling systems such as grey water and rainwater harvesting shall be submitted to and approved in writing by the local planning authority. The development shall be implemented in accordance with the approved details before it is occupied and shall be retained as such in perpetuity.

 

Reason: To minimise the environmental impact of the development through efficient use of water in accordance with the National Planning Policy Framework, Core Strategy (2007) Policy KP2, Development Management Document (2015) Policy DM2 and the Councils Design and Townscape Guide (2009).

 

21  The drainage infrastructure associated with the development hereby approved shall be carried out in accordance with the Sustainable Urban Assessment carried out by Cannon Consulting Engineers reference CCE/U641/SWA-01 dated June 2017 before it is occupied. The sustainable drainage system shall be installed before occupation of the building and managed and maintained thereafter in perpetuity in accordance with the agreed drainage measures contained within the assessment.

 

Reason: To prevent flooding by ensuring the satisfactory storage and disposal of surface water from the site for the lifetime of the development and to prevent environmental and amenity problems arising from flooding in accordance with Policies KP2 and CP4 of the Core Strategy (2007) and Policy DM2 of the Development Management Document (2015).

 

22  No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be fully adhered to throughout the construction period. The Statement shall provide, amongst other things, for:

 

i)  the parking of vehicles of site operatives and visitors

ii)  loading and unloading of plant and materials

iii)  storage of plant and materials used in constructing the development

iv)  the erection and maintenance of security hoarding 

v)  measures to control the emission of dust and dirt during construction

vi)  A scheme for recycling/disposing of waste resulting from construction works that does not allow for the burning of waste on site.

 

Reason: A pre-commencement condition is needed in the interests of visual amenity and the amenities of neighbouring occupiers pursuant to Policy CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

23  The outdoor seating area for the non-residential uses as shown on drawing 1267-03 Revision M hereby approved shall not be open for customers outside the following hours: - 0700 hours to 1900 hours on any day.

 

Reason:  To  protect  residential  amenity  and  general  environmental quality in accordance with the National Planning Policy Framework, Core  Strategy (2007)  Policies KP2  and  CP4,  and  Policies DM1 and DM3 of the Development Management Document (2015).

 

24  Prior to occupation of the residential development hereby approved the D1 (community use) unit fronting Clarence Street as shown on drawing 1267-03 Revision M shall be fitted out and made fully available for future occupiers in accordance with details which shall have been previously submitted to the Local Planning Authority and agreed in writing.

 

Reason: To safeguard the character and amenities of the area and in particular to protect the amenities of nearby residential properties and the community use within the Borough, in accordance with Policy PA6 of the Southend Central Area Action Plan (2018), Policies KP2, CP4 and CP6 of the Core Strategy (2007), Policies DM1 and DM3 of the Development Management Document (2015).

 

25  Demolition or construction works associated with this permission shall not take place outside 08:00 hours to 18:00 hours Mondays to Fridays and 08:00hours to 13:00hours on Saturdays and at no time on Sundays or Bank Holidays.

 

Reason: In order to protect the amenities of surrounding occupiers and to protect the character the area in accordance with Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

26  Notwithstanding the provisions of the Town and Country Planning (Use Classes) Order 1987 and the Town and Country Planning (General Permitted Development) Order 2015 (as amended) or any revocation, amendment or adaptation of these orders which for the time being maybe in force, the use class D1 unit hereby approved fronting Clarence Street designed for occupation for Class D1 Community purposes, as shown on drawing 1267-03 Revision M shall solely be used for purposes as an art gallery, museum or hall and for no other purpose without the receipt of express planning permission from the Local Planning Authority.

 

Reason: To ensure the unit is maintained in community uses to comply with Policy CP6 of the Core Strategy (2007) and Policy PA6 of the Southend Central Area Action Plan (2018).

 

27  The rating level of noise for internal activities (including amplified and unamplified music and human voices) at the site shall be at least 10dB(A) below the background noise level (with no tonal elements) to ensure inaudibility in noise sensitive premises. If noise modelling software is used to calculate the likely levels or impact of the noise then any actual measurement taken such as LA90 must be taken in accordance with BS7445. The assessment shall be carried out by a suitably qualified and experienced acoustic consultant who would normally be a member of the Institute of Acoustics.

 

Reason: To protect the amenities of the occupiers from undue noise and disturbance in order to protect their amenities in accordance with Core Strategy (2007) policies KP2 and CP4, Policies DM1, DM3 and DM8 of the Development Management Document (2015) and Design and Townscape Guide (2009).

 

(c)  In the event that the planning obligation referred to in part (a) above has not been completed by 29th June 2018 or an extension of this time as may be agreed, the Director of Planning and Transport or Group Manager Planning & Building Control be authorised to refuse planning permission for the application on the grounds that the development would not provide for affordable housing or education provision and that as such the proposal would be unacceptable and contrary to Policies KP2, KP3, CP6 and CP8 of the Core Strategy (2007).

 

Informatives

 

01  Please note that the development the subject of this application is liable for a charge under the Community Infrastructure Levy Regulations 2010 (as amended). Enclosed with this decision notice is a Community Infrastructure Levy (CIL) Liability Notice for the attention of the applicant and any person who has an interest in the land. This contains details including the chargeable amount, when this is payable and when and how exemption or relief on the charge can be sought.

 

You are advised that a CIL Commencement Notice (CIL Form 6) must be received by the Council at least one day before commencement of development. Receipt of this notice will be acknowledged by the Council. Please ensure that you have received both a CIL Liability notice and acknowledgement of your CIL Commencement Notice before development is commenced. Most claims for CIL relief or exemption must be sought from and approved by the Council prior to commencement of the development.

 

Charges and surcharges may apply, and exemption or relief could be withdrawn if you fail to meet statutory requirements relating to CIL. Further details on CIL matters can be found on the Council's website at www.southend

 

02  The applicant is reminded that this permission does not bestow compliance with other regulatory frameworks. In particular your attention is drawn to the statutory nuisance provisions within the Environmental Protection Act 1990 (as amended) and also to the relevant sections of the Control of Pollution Act 1974. The provisions apply to the construction phase and not solely to the operation of the completed development. Contact 01702 215005 for more information.

 

03  You should be aware that in cases where damage occurs during construction works to the highway in implementing this permission that Council may seek to recover the cost of repairing public highways and footpaths from any party responsible for damaging them. This includes damage carried out when implementing a planning permission or other works to buildings or land. Please take care when carrying out works on or near the public highways and footpaths in the Borough.

 

04  This permission is governed by a legal agreement between the applicant and the Borough Council under Section 106 of the Town and Country Planning Act 1990. The agreement relates to a financial contribution towards affordable housing and secondary education.

 

05  As part of the Residential Information Pack  required under condition 8 future occupiers’ attention should be drawn to the low level of on-site car parking included within the development.

 

The Local Planning Authority has acted positively and proactively in determining this application by identifying matters of concern within the application (as originally submitted) and negotiating, with the Applicant, acceptable amendments to the proposal to address those concerns.  As a result, the Local Planning Authority has been able to grant planning permission for an acceptable proposal, in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework.  The detailed analysis is set out in a report on the application prepared by officers.

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.