Agenda item

20/01641/BC3 - Garages Rear Of 40, 42, 44 and 46 Anson Chase, Shoeburyness (Shoeburyness Ward)

Minutes:

Proposal: Demolish existing garages, erect two bed bungalow with associated amenity space and parking

Applicant:  Mr Martin Berry of Southend Borough Council

Agent:  Mr David Lloyd of AK Design Partnership LLP

 

Resolved:-

 

(a)      That the Interim Director of Planning or Group Manager of Planning & Building Control be DELEGATED to GRANT PLANNING PERMISSION subject to the following conditions and following the completion of a PLANNING AGREEMENT UNDER SECTION 106 of the Town and Country Planning Act 1990 (as amended) and any other appropriate legislation to secure the provision of a financial contribution of £125.58 (index linked) to mitigate the potential disturbance to European designated sites in accordance with the Essex Coast Recreational disturbance Avoidance Mitigation Strategy or the securing of this same payment by other suitable means.

 

(b)      The Interim Director of Planning or the Group Manager (Planning & Building Control) be authorised to determine the application upon completion of the above requirement, so long as planning permission when granted and, where it is used, the obligation when executed, accords with the details set out in the report submitted and the conditions listed below:

 

01 The development hereby permitted shall begin not later than three years of the date of this decision

 

Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990

 

02 The development hereby permitted shall be carried out in accordance with the following approved plans 4760.102 –PL5

 

Reason: To ensure that the development is carried out in accordance with the Development Plan.

 

03 Prior to its occupation the materials for the external surfaces of the dwellings hereby approved shall be as set out on plan reference 4760.102-PL5 or any other details that have previously been submitted to and approved in writing by the local planning authority.

 

Reason: To safeguard the visual amenities of the area, in accordance with the National Planning Policy Framework (2019) Core Strategy (2007) policy KP2 and CP4, Development Management Document (2015) Policy DM1 and advice contained within the Southend Design and Townscape Guide (2009).  

 

04 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works above a lower ground floor slab level shall take place until full details of both hard and soft landscape works and proposed boundary treatment have been submitted to and approved in writing by the local planning authority.  These details shall include:

 

i.) proposed finished levels or contours;

ii.) Details for the means of enclosure of the amenity area;

iii.) Details for the soft landscape works shall include the number, size and location of the trees, shrubs and plants to be planted together with a planting specification and the initial tree planting and tree staking details. 

 

The hard landscaping shall be implemented in full accordance with the approved details before the development is occupied or brought into use. The soft landscaping shall be completed before the end of the first planting season following first occupation of the building.

?

Reason: In the interests of visual amenity and the amenities of occupiers and to ensure a satisfactory standard of landscaping pursuant to Policy CP4 of the Core Strategy (2007) and policies DM1 and DM3 of the Development Management Document (2015) and advise contained within the Southend Design and Townscape Guide (2009).  

 

05 The four car parking spaces and the associated vehicular access for the spaces to access the public highway, shown on approved plan 4760.102-PL5 shall be provided and made available for use at the site prior to the first occupation of the dwelling hereby approved. The car parking spaces noted on the approved plan as 1 and 2 and the associated vehicular access to and from the public highway shall thereafter be permanently retained solely for the parking of vehicles and the accessing of the car parking spaces in connection with the occupiers of the dwelling hereby approved and their visitors. The remaining two parking spaces to the south of the proposed dwelling shall be permanently retained for public use.

 

Reason: To ensure that satisfactory off-street car parking is provided in the interests of residential amenity and highways efficiency and safety, in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) policy KP2, Development Management Document (2015) policy DM15 and the Southend Design and Townscape Guide (2009). 

 

06 No drainage infrastructure associated with this development shall be undertaken until details of the design implementation; maintenance and management of a scheme for surface water drainage works (incorporating Sustainable Urban Drainage (SuDs) Principles) have been submitted to and approved by the local planning authority. The approved scheme shall be implemented, in accordance with the approved details before the development is occupied or brought into use and be maintained as such thereafter in perpetuity.

 

Reason: To prevent flooding by ensuring the satisfactory storage and disposal of surface water from the site for the lifetime of the development and to prevent environmental and amenity problems arising from flooding in accordance with the National Planning Policy Framework (2019), Policy KP2 and CP4 of the Core Strategy (2007) and Policy DM2 of the Development Management Document (2015)

 

07 Prior to occupation of the dwelling hereby approved, appropriate water efficient design measures as set out in Policy DM2 (iv) of the Development Management Document to limit internal water consumption to not more than 105 litres per person per day (lpd) (110 lpd when including external  water  consumption), to include measures of water efficient fittings, appliances and water recycling systems such as grey water and rainwater harvesting shall be implemented for the development and thereafter retained in perpetuity.

 

Reason: To minimise the environmental impact of the development through efficient use of water in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) Policy KP2, Development Management Document (2015) Policy DM2 and advice contained within the Southend Design and Townscape Guide (2009).

 

08 A scheme detailing how at least 10% of the total energy needs of the development will be supplied using on site renewable sources shall be submitted to, agreed in writing by the Local Planning Authority and implemented in full in accordance with the approved details prior to the first occupation of the dwelling hereby approved. This provision shall be made for the lifetime of the development.

 

Reason: To minimise the environmental impact of the development through efficient use of resources and better use of sustainable and renewable resources in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) policy KP2 and CP4, Development Management Document (2015) policy DM2 and the Southend Design and Townscape Guide (2009).

 

09 The development hereby approved shall be carried out in a manner to ensure the dwellinghouse complies with building regulation M4 (2) ‘accessible and adaptable dwellings’ before it is occupied.

 

Reason: To ensure the residential unit hereby approved provides a high quality and flexible internal layout to meet the changing needs of residents in accordance with National Planning Policy Framework (2019), Core Strategy (2007) policy KP2, Development Management Document (2015) policy DM8 and the advice contained in the Southend Design and Townscape Guide (2009).

 

10 With the exception of below ground investigation work and removal of the previous structures on site including the hardstanding, no development shall take place until and unless the following details have been submitted to and approved in writing by the local Planning Authority:

 

i) Notwithstanding the conclusions of the Combined Phase I and Phase II Site Investigation Report by agb Environmental reference P3220.1.0 dated 20 December 2018, due to the potential for gas migration and made ground at the site as noted in Table 6.18 and Table 12.1 of this report, a detailed Site Remediation Strategy to deal with land contamination and /or pollution of controlled waters affecting the site shall be submitted to and approved in writing by the local planning authority.

 

ii) The site shall be remediated as necessary in accordance with the approved Site Remediation Strategy before the construction of the development hereby approved begins. A Validation Report for the Site Remediation Strategy shall be submitted to, and agreed in writing by the local planning authority before completion of the development or occupation of the dwelling hereby approved (whichever comes first).

 

iii) If, during the development, land contamination not previously considered is identified, then the Local Planning Authority shall be notified immediately and no further works shall be carried out until a method statement detailing a scheme for dealing with suspect contamination has been submitted to and agreed in writing with the Local Planning Authority

 

The remediation of the site shall incorporate the approved remediation measures and shall be carried out in full before the building is occupied.

 

Reason: To ensure that any contamination on the site is identified and treated so that it does not harm anyone who uses the site in the future, and to ensure that the development does not cause pollution to Controlled Waters in accordance with Core Strategy (2007) Policies KP2 and CP4 and Policies DM1 and DM14 of the Development Management Document (2015).

 

11 Construction Hours for the development hereby approved shall be restricted to 8am – 6pm Monday to Friday, 8am - 1pm Saturday and not at all on Sundays or Bank Holidays.

 

Reason: In the interests of visual amenity and the amenities of neighbours and to ensure a satisfactory standard of landscaping pursuant to Policy CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

(c)  In the event that the planning obligation or other means of securing the financial contribution referred to in part (a) above has not been completed by 2nd December 2020 or an extension of this time as may be agreed, the Interim Director of Planning or Group Manager Planning & Building Control be authorised to refuse planning permission for the application on the grounds that the development would not provide adequate mitigation for the potential disturbance to European designated site, contrary to National and Local planning policy. 

 

INFORMATIVES

 

01 Please note that the development the subject of this application is liable for a charge under the Community Infrastructure Levy (CIL) Regulations 2010 (as amended) and it is the responsibility of the landowner(s) to ensure they have fully complied with the requirements of these regulations. A failure to comply with the CIL regulations in full can result in a range of penalties. For full planning permissions, a CIL Liability Notice will be issued by the Council as soon as practicable following this decision notice. For general consents, you are required to submit a Notice of Chargeable Development (Form 5) before commencement; and upon receipt of this, the Council will issue a CIL Liability Noticeincluding details of the chargeable amount and when this is payable.

 

If you have not received a CIL Liability Notice by the time you intend to commence development it is imperative that you contact S106andCILAdministration@southend.gov.uk to avoid financial penalties for potential failure to comply with the CIL Regulations 2010 (as amended). If the chargeable development has already commenced, no exemption or relief can be sought in relation to the charge and a CIL Demand Notice will be issued requiring immediate payment. Further details on CIL matters can be found on the Planning Portal:

(www.planningportal.co.uk/info/200136/policy_and_legislation/70/community_infrastructure_levy) or the Council's website (www.southend.gov.uk/cil).  

 

02 You should be aware that in cases where damage occurs during construction works to the highway in implementing this permission that Council may seek to recover the cost of repairing public highways and footpaths from any party responsible for damaging them. This includes damage carried out when implementing a planning permission or other works to buildings or land. Please take care when carrying out works on or near the public highways and footpaths in the Borough.

 

03 The applicant is encouraged to provide electric vehicle charging points at the site in accordance with Policy DM15 which encourages their provision wherever practical and feasible.

 

The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including planning policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework.  The detailed analysis is set out in a report on the application prepared by officers.

 

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.