23/00305/FUL - 77 - 83 West Road, Westcliff-on-Sea (Westborough Ward)

Minutes:

Resolved:

 

That planning permission be granted, subject to the following conditions:

 

01 The development hereby permitted shall begin no later than three years from the date of this decision.

 

Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.

 

02 The development hereby approved shall be carried out in accordance with the approved plans: 3002A_50revC; 3002A_51 revC; 3002A_52revC; 3002A_100revC; 3002A_200revC; 3002A_201revD; 3002A_202revC; 3002A_203rev C; 3002A_204rev C; 3002A_E100

 

Reason: To ensure the development is carried out in accordance with the development plan.

 

03 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, the development hereby permitted shall not commence, other than demolition or site preparation works, unless and until full details and specifications of the materials to be used for all the external surfaces of the development at the site including facing materials, roof detail, windows, doors, fascia and soffits and the privacy screens have been submitted to and approved in writing by the Local Planning Authority. The works must then be carried out in full accordance with the approved details before the dwellings hereby approved are first occupied.

 

Reason: In the interest of visual amenity in accordance with the National Planning Policy Framework (2021), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1 and DM3, and the advice contained within the National Design Guide (2021) and the Southend-on-Sea Design and Townscape Guide (2009).

 

04 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, the development hereby permitted shall not commence, other than demolition or site preparation works unless and until full details of both hard and soft landscape works to be carried out at the site have been submitted to and approved in writing by the Local Planning Authority. The approved hard landscaping works shall be carried out prior to first occupation of the development and the soft landscaping works within the first planting season following first occupation of the development. The details submitted shall include, but not limited to:

 

i. means of enclosure, of the site including any gates or boundary fencing;

ii. pedestrian access and circulation areas;

iii. hard surfacing materials;

iv. details of the number, size and location of the shrubs and plants to planted together with a planting specification

 

Any trees or shrubs dying, removed, being severely damaged or becoming seriously diseased within five years of planting shall be replaced with trees or shrubs of such size and species as may be agreed with the Local Planning Authority.

 

Reason: In the interests of visual amenity and the amenities of occupiers and to ensure a satisfactory standard of landscaping and tree protections measures are implemented pursuant to Policy DM1 of the Development Management Document (2015) and Policy CP4 of the Core Strategy (2007)

05 Notwithstanding the information submitted with this application, prior to the first occupation of the development hereby approved, full details (including elevations) shall be submitted to and approved in writing by the Local Planning Authority identifying the provision of secure and enclosed refuse and recycling storage for the approved development at the site. The approved refuse and recycling storage shall be provided in full and made available for use by the occupants of the approved dwellings prior to the first occupation of the dwellings hereby approved and shall be retained as such for the lifetime of the development.

 

Reason: In the interest of visual amenity and to ensure the provision of adequate waste storage in accordance with the National Planning Policy Framework (2021), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1, DM3 and DM8, and the advice contained within the National Design Guide (2021), the Southend-on-Sea Design and Townscape Guide (2009), and the Waste Storage, Collection and Management Guide for New Developments (2019).

 

06 Construction and demolition works for the approved development on site shall only be undertaken between 8 am to 6 pm on weekdays, between 8 am and 1 pm on Saturdays and not at any time on Sundays and Bank and Public Holidays.

 

Reason: In the interest of the residential amenity of nearby occupiers in accordance with the National Planning Policy Framework (2021), Policies KP2 and CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

07 The cycle parking spaces shown on approved plan 3002A_100revC shall be provided and made available for use at the site prior to the first occupation of the dwellings hereby approved.

 

Reason: To ensure that secure cycle parking is provided to serve the development in accordance with Policies CP3 of the Core Strategy (2007) and Policy DM15 of the Development Management Document (2015).

08 Prior to first occupation of the development hereby approved details of energy efficiency and other sustainability measures to be included in the scheme, including the provision of at least 10% of the energy needs of the development hereby approved being provided from onsite renewable sources, shall be submitted to, agreed in writing by the Local Planning Authority under the terms of this condition and implemented on site in accordance with the agreed details. The agreed measures shall be maintained on site as approved thereafter.

 

Reason: To minimise the environmental impact of the development through efficient use of resources and better use of sustainable and renewable resources in accordance with the National Planning Policy Framework (2021), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policy DM2, and the advice contained within the National Design Guide (2021) and the Southend-on-Sea Design and Townscape Guide (2009).

 

09 The dwellings hereby approved shall incorporate water efficient design measures set out in Policy DM2 (iv) of the Development Management Document to limit internal water consumption to 105 litres per person per day (lpd) (110 lpd when including external water consumption), including measures of water efficient fittings, appliances and water recycling systems such as grey water and rainwater harvesting before they are occupied.

 

Reason: To minimise the environmental impact of the development through efficient use of resources and better use of sustainable and renewable resources in accordance with the National Planning Policy Framework (2021), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policy DM2, and the advice contained within the National Design Guide (2021) and the Southend-on-Sea Design and Townscape Guide (2009).

 

10 In the event that contamination is found at any time when carrying out the approved development, development must stop and it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken, and where remediation is necessary, a remediation scheme must be prepared and submitted for the approval in writing by the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing by the Local Planning Authority.

 

Investigation, remediation and verification must be undertaken by competent persons and in accordance with the Essex Contaminated Land Consortium's 'Land Affected by Contamination: Technical Guidance for Applicants and Developers' and DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11' and other current guidance deemed authoritative for the purposes.

 

Reason: In the interest of the residential amenity of future occupants of the scheme in accordance with the National Planning Policy Framework (2021), Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1, DM3 and DM14 of the Development Management Document (2015).

 

11 Prior to first use of the dwellings hereby approved, a Noise Impact Assessment must be conducted by a competent person to assess the potential impacts of existing commercial and transport infrastructure on the living conditions of future occupiers of the dwellings. The assessment must be made using the appropriate standards and methodology for the noise sources and best practice. A report on that noise impact assessment, which must include any mitigation measures needed for the proposal to meet the required noise standards, as specified below, must be submitted to the Local Planning Authority for approval in writing before the dwellings are first occupied.

The mitigation measures recommended in the submitted report shall ensure that the internal ambient noise levels of the proposed dwellings shall not exceed the guideline values in British Standards BS8233:2014 Table 4 as follows:

 

07:00 to 23:00

 

- Resting - Living room 35 dB LAeq,16hour

- Dining - Dining room/area 40 dB LAeq,16hour

- Sleeping/Daytime Resting - Bedroom 35 dB LAeq,16hour

23:00 to 07:00

 

- Sleeping/Night-time Bedroom 35 dB LAeq,8hour

The development must be implemented in full accordance with the mitigation and other details submitted in the report approved under this condition before the dwellings are first occupied and thereafter be maintained as such in perpetuity.

 

The applicant must have regard to thermal comfort and noise mitigation in accordance with Acoustic Ventilation and Overheating - Residential Design Guide by IOA and ANC when proposing any scheme. Where alternative means of ventilation and air cooling and heating are to be used the submitted report shall include full details of what they will comprise and demonstrate that:

 

- The alternative means of ventilation and cooling will not compromise any noise protection measures

- The alternative means of ventilation and cooling will not present an adverse noise or odour impact on occupants

- The alternative means of ventilation and cooling will enable optimum living conditions in all weather and with reference to climate change predictions

 

The means of ventilation must be in accordance with documents CIBSE Guide A:2015-Environmental Design, CIBSE TM52:2013-The limits of thermal comfort: avoiding overheating in European buildings and CIBSE TM59:2017-Design methodology for the assessment of overheating risk in homes. The alternative means of ventilation shall be implemented in full accordance with the details approved under this condition before the dwellings are first occupied and be maintained as such thereafter in perpetuity.

 

Reason: To protect the environment of people in the development and general environmental quality in accordance with Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1 and DM3 and the advice in the Southend-on-Sea Design and Townscape Guide (2009).

 

Positive and proactive statement:

 

The Local Planning Authority has acted positively and proactively in determining this application by identifying matters of concern within the application (as originally submitted) and negotiating, with the Applicant, acceptable amendments to the proposal to address those concerns. As a result, the Local Planning Authority has been able to grant planning permission for an acceptable proposal, in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework. The detailed analysis is set out in a report on the application prepared by officers.

 

Informatives:

 

1 Please note that the development which is the subject of this application is liable for a charge under the Community Infrastructure Levy (CIL) Regulations 2010 (as amended) and it is the responsibility of the landowner(s) to ensure they have fully complied with the requirements of these regulations. A failure to comply with the CIL regulations in full can result in a range of penalties. For full planning permissions, a CIL Liability Notice will be issued by the Council as soon as practicable following this decision notice. For general consents, you are required to submit a Notice of Chargeable Development (Form 5) before commencement; and upon receipt of this, the Council will issue a CIL Liability Notice including details of the chargeable amount and when this is payable. If you have not received a CIL Liability Notice by the time you intend to commence development, it is imperative that you contact S106andCILAdministration@southend.gov.uk to avoid financial penalties for potential failure to comply with the CIL Regulations 2010 (as amended). If the chargeable development has already commenced, no exemption or relief can be sought in relation to the charge and a CIL Demand Notice will be issued requiring immediate payment. Further details on CIL matters can be found on the Planning Portal (www.planningportal.co.uk/info/200136/policy_and_legislation/70/community_infrastructure_levy) or the Council's website (www.southend.gov.uk/cil).

 

2 You should be aware that in cases where damage occurs during construction works to the highway in implementing this permission that Council will seek to recover the cost of repairing public highways and footpaths from any party responsible for damaging them. This includes damage carried out when implementing a planning permission or other works to buildings or land. Please take care when carrying out works on or near the public highways and footpaths in the city.

 

3 Applicants are advised of the need to ensure the thermal comfort of dwellings under Regulation 40B of the Building Regulations 2010. The code of practice to the Regulations in Approved Document O requires an overheating mitigation strategy and assessment. This includes where noise protection measures require windows and openings to be closed.

 

4 The applicant is reminded that this permission does not bestow compliance with other regulatory frameworks. In particular, your attention is drawn to the statutory nuisance provisions within the Environmental Protection Act 1990 (as amended) and the noise provisions within the Control of Pollution Act 1974. Applicants should contact the Council's Regulatory Services Officer in Environmental Protection for more advice on 01702 215005 or at Regulatory Services, Southend-on-Sea City Council, Civic Centre, Victoria Avenue, Southend SS2 6ER.

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.