Agenda item

18/01812/FUL - 258 Westborough Road, Westcliff-on-Sea (Westborough Ward)

Minutes:

Proposal: Change of use of doctors surgery (Class D1) into six self-contained flats (Class C3), erect first floor extension, two storey front and rear extensions, single storey extension with terrace to rear at first floor level, install balcony to rear, terrace to front, cycle and refuse store to rear, layout parking to rear, amenity space to rear and side and alter elevations (Amended Proposal).

Applicant: 22nd Century Property Ltd

Agent: Phase 2 Planning

 

Resolved: That PLANNING PERMISSION be GRANTED subject to the following conditions:

 

01. The development hereby permitted shall begin not later than three years from the date of this decision.

 

Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.

 

02. The development hereby permitted shall be carried out in accordance with the following approved plans: 17.201/01 F, 17.201/02 F, 17.201/03 F, 17.201/04 F, 17.201/05 F, 17.201/06 F, 17.201/07 F, 17.201/08 F, 17.201/09 F, 17.201/10 E, 17.201/11 F, 17.201/12 F, 17.201/13 E, 17.201/14 F, 17.201/15 E, 17.201/16, and additional materials specifications in the letter from BDA ref. 17.150/DC.

 

Reason: To ensure that the development is carried out in accordance with the provisions of the Development Plan.

 

03. The proposed balustrade to the south elevation of the balcony at the rear of Flat 6 shall be provided in full as shown on the approved plans before the dwelling is occupied, at a height of 1.7m above finished floor level and shall only be glazed in obscure glass (the glass to be obscure to at least Level 4 on the Pilkington Levels of Privacy, or such equivalent as may be agreed in writing with the local planning authority) and shall be retained as such in perpetuity unless otherwise agreed in writing by the local planning authority.

 

Reason: To protect the privacy and environment of people in neighbouring residential properties, in accordance with the National Planning Policy Framework, Policies KP2 and CP4 of the Southend-on-Sea Core Strategy (2007), Policies DM1 and DM3 of the Southend-on-Sea Development Management Document (2015) and the advice contained within the Southend-on-Sea Design and Townscape Guide (2009).

 

04. From the commencement of the works associated with the implementation of this consent through to their completion the tree within the site near the junction of Westborough Road and Tintern Avenue shall be protected in full accordance with the requirements of British Standard 5837:2012.

 

Reason: In the interests of visual amenity and to maintain the positive contribution made by the established tree to the character and appearance of the area. This is as set out in the National Planning Policy Framework, Policies KP2 and CP4 of the Southend-on-Sea Core Strategy (2007), Policies DM1 and DM3 of the Southend-on-Sea Development Management Document (2015) and the advice contained within the Southend-on-Sea Design and Townscape Guide (2009).

 

05. The approved hard landscaping works including boundary treatments shall be carried out prior to first occupation of the development and the soft landscaping works within the first planting season following first occupation of the development, unless otherwise agreed in writing by the local planning authority. Any trees or shrubs dying, removed, being severely damaged or becoming seriously diseased within five years of planting shall be replaced with trees or shrubs of such size and species as may be agreed with the Local Planning Authority.

 

Reason: In the interests of visual amenity and the amenities of occupiers and to ensure a satisfactory standard of landscaping is implemented pursuant to Policy DM1 of the Development Management Document and Policy CP4 of the Core Strategy.

 

06. Prior to the first occupation of the flats hereby approved the car parking shown on the plans hereby approved shall be provided and made available for use by the occupants of the proposed dwellings and thereafter be retained as such in perpetuity.

 

Reason: To ensure the provision of adequate car parking in accordance with the National Planning Policy Framework, Policies KP2 and CP3 of the Southend-on-Sea Core Strategy (2007), Policy DM15 of the Southend-on-Sea Development Management Document (2015) and the advice contained within the Southend-on-Sea Design and Townscape Guide (2009).

 

07. Prior to the first occupation of the flats hereby approved the refuse store and cycle storage shown on the plans hereby approved shall be provided and made available for use by the occupants of the proposed dwellings and thereafter be retained as such in perpetuity.

 

Reason: To ensure the provision of adequate car parking in accordance with the National Planning Policy Framework, Policies KP2 and CP3 of the Southend-on-Sea Core Strategy (2007), Policy DM15 of the Southend-on-Sea Development Management Document (2015) and the advice contained within the Southend-on-Sea Design and Townscape Guide (2009).

 

08. A scheme detailing how at least 10% of the total energy needs of the buildings will be supplied using on site renewable sources must be submitted to and agreed in writing by the Local Planning Authority and implemented in full prior to first occupation. This provision shall be made for the lifetime of the development.

 

Reason: In the interests of providing sustainable development in accordance with Policy KP2 of the Southend-on-Sea Core Strategy (2007), and  Policy DM2 of the Southend-on-Sea Development Management Document (2015).

 

09. The development hereby approved shall incorporate water efficient design measures set out in Policy DM2 (iv) of the Development Management Document to limit internal water consumption to 105 litres per person  per  day  (lpd)  (110  lpd  when  including  external  water  consumption), including measures of water efficient fittings, appliances and water recycling systems such as grey water and rainwater harvesting, before it is occupied.

 

Reason: To minimise the environmental impact of the development through efficient use of water in accordance with the National Planning Policy Framework, Policy KP2 of the Southend-on-Sea Core Strategy (2007), Policy DM2 of the Southend-on-Sea Development Management Document (2015) and the advice contained within the Southend-on-Sea Design and Townscape Guide (2009).

 

10. Construction hours for the development hereby approved shall be restricted to 8am to 6pm Monday to Friday, 8am to 1pm on Saturdays and not at all on Sundays or Bank Holidays.

 

Reason: To protect the environment of people in neighbouring residential properties, in accordance with the National Planning Policy Framework, Policies KP2 and CP4 of the Southend-on-Sea Core Strategy (2007), Policies DM1 and DM3 of the Southend-on-Sea Development Management Document (2015) and the advice contained within the Southend-on-Sea Design and Townscape Guide (2009).

 

11. Notwithstanding the details shown in the plans submitted and otherwise hereby approved the development hereby granted consent shall not be occupied or brought into use unless and until plans are submitted to the Local Planning Authority and approved in writing which clearly specify all the windows and other openings within the development that are to be permanently glazed with obscured glass and fixed shut or provided with only a fanlight (or other similar) opening and the manner and design in which these windows and openings are to be implemented. The development herby permitted shall be implemented in full accordance with the details approved under this condition before it is first occupied or brought into use and shall be permanently retained as such thereafter.

 

Reason: To protect the privacy and environment of future occupiers, in accordance with the National Planning Policy Framework, Policies KP2 and CP4 of the Southend-on-Sea Core Strategy (2007), Policies DM1 and DM3 of the Southend-on-Sea Development Management Document (2015) and the advice contained within the Southend-on-Sea Design and Townscape Guide (2009).

 

The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including planning policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework.  The detailed analysis is set out in a report on the application prepared by officers.

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.