Agenda item

19/02255/FULM - 245 Sutton Road, Southend-on-Sea (Victoria Ward)

Minutes:

Proposal:  Demolish existing building, erect five storey building comprising 22 self-contained flats with balconies to all elevations, terrace to rear at ground floor level and layout parking at lower ground floor level

Applicant:  Argent Developers

Agent:  Mr Lewis Cullerton of DAP Architecture

 

Resolved:-

 

(a)  That the Interim Director of Planning or Group Manager of Planning & Building Control be DELEGATED to GRANT PLANNING PERMISSION subject to the following conditions following the completion of a PLANNING AGREEMENT under SECTION 106 of the TOWN AND COUNTRY PLANNING ACT 1990 (as amended) and any other appropriate legislation to secure the provision of:

 

• a financial contribution of £2,762.76 (index linked) to mitigate the potential for disturbance to European designated sites in accordance with the Essex Coast Recreational disturbance Avoidance Mitigation Strategy or the securing of this same payment by other suitable means

 

(b)  The Interim Director of Planning or the Group Manager (Planning & Building Control) be authorised to determine the application upon completion of the above obligation, so long as planning permission when granted and, where it is used, the obligation when executed, accords with the details set out in the report submitted and the conditions listed below:

 

01 The development hereby permitted shall begin not later than three years of the date of this decision.

 

Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990

 

02 The development hereby permitted shall be carried out in accordance with the following approved plans 200.03, 201.03, 202.03, 203.04, 204.03, 205.03, 206.02, 001.02

 

Reason: To ensure that the development is carried out in accordance with the Development Plan.

 

03 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition and construction up to ground floor slab level shall take place until full product details of the materials to be used on all the external elevations, including walls, roof, windows and doors, balconies and terraces, ramp, brise soleil, rainwater goods and boundaries have been submitted to and approved in writing by the local planning authority. The development shall only be carried out in accordance with the approved details before it is brought into use.

 

Reason: To safeguard the visual amenities of the area, in accordance with the National Planning Policy Framework (2019) Core Strategy (2007) policy KP2 and CP4, Development Management Document (2015) Policy DM1 and advice contained within the Southend Design and Townscape Guide (2009).  

 

04 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition of the existing building shall take place until full details of both hard and soft landscape works to be carried out at the site have been submitted to and approved in writing by the local planning authority. The approved hard landscaping works shall be carried out prior to first occupation of the development and the soft landscaping works within the first planting season following first occupation of the development, unless otherwise agreed in writing by the local planning authority. The details submitted shall include, but not limited to: -

 

i) Proposed finished site levels or contours; 

ii) Means of enclosure, of the site including any gates or boundary fencing; 

iii) hard surfacing materials; 

iv) Full details of the amenity deck including associated structures (e.g. benches, planters, lighting etc.).;

v) Full details of the number, size and location of the trees, shrubs and plants to be retained and planted together with a planting specification and tree management plan.

vi) Full details of tree protection fencing to protect the existing trees to be retained adjacent to the rear boundary of the site.

vii) Details of measures to enhance biodiversity within the site.

 

Any trees or shrubs dying, removed, being severely damaged or becoming seriously diseased within five years of planting shall be replaced with trees or shrubs of such size and species as may be agreed with the Local Planning Authority

 

Reason: In the interests of visual amenity of the area and the amenities of occupiers and to ensure a satisfactory standard of landscaping pursuant to Policy DM1 of the Development Management Document (2015) and Policy CP4 of the Core Strategy (2007)

 

05 The 22 car parking spaces (including 2 disabled spaces) shown on approved plan 202.03 shall be provided and made available for use at the site prior to the first occupation of the dwellings hereby approved. The car parking spaces and the associated vehicular access to and from the public highway shall thereafter be permanently retained solely for the parking of vehicles and the accessing of the car parking spaces in connection with the occupiers of the dwelling hereby approved and their visitors.

 

Reason: To ensure that satisfactory off-street car parking is provided in the interests of residential amenity and highways efficiency and safety, in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) policy KP2, Development Management Document (2015) policy DM15 and the Southend Design and Townscape Guide (2009). 

 

06 The development shall not be occupied or brought into use until the refuse and recycling storage facilities are provided and made available for use by the occupiers in full accordance with the details shown on approved drawing number 201.03. The refuse and recycling facilities shall be permanently retained as such thereafter. 

 

Reason:  To ensure that the development is satisfactorily serviced and that satisfactory waste management is undertaken in the interests of highway safety and visual amenity and to protect the character of the surrounding area, in accordance with Policies KP2 and CP3 of the Core Strategy (2007) and Policy DM15 of the Development Management Document (2015).

 

07 Prior to the first occupation of the dwellings hereby approved an updated waste management plan shall be submitted to and approved by the local planning authority. The development shall only be implemented in accordance with the approved details from first occupation for the proposed use and be maintained as such in perpetuity.

 

Reason:  To ensure that the development is satisfactorily serviced and that satisfactory waste management is undertaken in the interests of highway safety and visual amenity and to protect the character of the surrounding conservation area, in accordance with Policies KP2, CP3 and CP4 of the Core Strategy (2007) and Policies DM1, DM5 and DM15 of the Development Management Document (2015).

 

08 The development shall not be occupied or brought into use until the cycle storage facilities are provided in full and made available for use by the occupiers in accordance with the details shown on drawing number 202.03. The cycle storage facilities shall be permanently retained as such thereafter. 

 

Reason:  To ensure the provision of adequate cycle parking in accordance with policies DM8 and DM15 of The Development Management Document (2015).

 

09 Prior to the first occupation of any dwelling, details of the Residential Travel Packs shall be submitted to and approved in writing by the local planning authority. The approved travel packs shall then be provided to each dwelling within 1 month of occupation. 

 

Reason: In the interests of sustainability in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) Policies KP2, CP3 and CP4, Development Management Document (2015) Policy DM15, and Design and Townscape Guide (2009).

 

10 The development hereby approved shall be carried out in a manner to ensure that a minimum of two of the dwellings comply with building regulations M4(3) ‘wheelchair user dwellings’ and the remaining 20 dwellings comply with building regulation M4 (2) ‘accessible and adaptable dwellings’ before they are occupied.

 

Reason: To ensure the residential units hereby approved provides a high quality and flexible internal layout to meet the changing needs of residents in accordance with National Planning Policy Framework (2019), Core Strategy (2007) policy KP2, Development Management Document (2015) policy DM8 and the advice contained in the Southend Design and Townscape Guide (2009).

 

11 A scheme detailing how at least 10% of the total energy needs of the development will be supplied using on site renewable sources shall be submitted to, agreed in writing by the Local Planning Authority and implemented in full in accordance with the approved details prior to the first occupation of the dwellings hereby approved. This provision shall be made for the lifetime of the development.

 

Reason: To minimise the environmental impact of the development through efficient use of resources and better use of sustainable and renewable resources in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) policy KP2 and CP4, Development Management Document (2015) policy DM2 and the Southend Design and Townscape Guide (2009).

 

12 Prior to occupation of the dwellings hereby approved, appropriate water efficient design measures as set out in Policy DM2 (iv) of the Development Management Document to limit internal water consumption to not more than 105 litres per person per day (lpd) (110 lpd when including external  water  consumption), to include measures of water efficient fittings, appliances and water recycling systems such as grey water and rainwater harvesting shall be implemented for the development and thereafter retained in perpetuity.

 

Reason: To minimise the environmental impact of the development through efficient use of water in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) Policy KP2, Development Management Document (2015) Policy DM2 and advice contained within the Southend Design and Townscape Guide (2009).

 

13 With the exception of below ground investigation work and removal of the previous structures on site, no development shall take place until and unless the following details have been submitted to and approved in writing by the local Planning Authority.

 

i)  An instructive investigation (Phase II Site Investigation) must be undertaken in order to quantify the risks identified by the Phase 1 Site Investigation. The investigation must be undertaken in accordance with the scope of work outlined in the Phase 1 Contamination Assessment, by MLM Consulting Engineers reference 775649-REP-ENV-001 dated 13 Oct 2017. The Phase II report must be submitted to the Local planning authority for approval. The assessment must be undertaken by a competent person in accordance with British Standards 10175:2011 (Investigation of potentially contaminated sites – Code of Practice) and the Environment Agency/DEFRA ‘Model Procedures for the Management of Land Contamination.

ii) Where the Phase II Investigation Report identifies any unacceptable risk or risks, a detailed Site Remediation Strategy to deal with land contamination and /or pollution of controlled waters affecting the site shall be submitted and approved by the local planning authority.  With the exception of below ground investigation work and removal of the previous structures on site, no development shall take place until and unless this Site Remediation Strategy has been approved in writing by the local planning authority.

 

iii) The site shall be remediated in accordance with the approved Site Remediation Strategy before the construction of the development hereby approved begins. A Validation Report for the Site Remediation Strategy shall be submitted to and agreed in writing by the local planning authority before completion of the development or occupation of the premises (whichever comes first).

 

iv) If, during the development, land contamination not previously considered is identified, then the Local Planning Authority shall be notified immediately and no further works shall be carried out until a method statement detailing a scheme for dealing with suspect contamination has been submitted to and agreed in writing with the Local Planning Authority

 

The remediation of the site shall incorporate the approved remediation measures and shall be carried out in full before the building is occupied.

 

Reason: To ensure that any contamination on the site is identified and treated so that it does not harm anyone who uses the site in the future, and to ensure that the development does not cause pollution to Controlled Waters in accordance with Core Strategy (2007) Policies KP2 and CP4 and Policies DM1 and DM14 of the Development Management Document (2015).

 

14 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, and in accordance with the Flood Risk and Surface Water Strategy by Ardent Consulting Engineers reference 172880-02 dated December 2019, the development hereby permitted shall not be commenced other than for demolition works unless and until a detailed  design of a surface water drainage scheme and surface water management strategy has been submitted to and approved in writing by the local planning authority. The details submitted shall include, but not limited to: -

 

i) An updated drainage layout plan confirming the manholes, downstream defender and hydro-brake flow control device cover and invert levels if a rising main is required to achieve the proposed connection point to the Anglian Water surface water sewer. Engineering plans should be updated accordingly along with supporting surface water calculations provided for each of the SuDS and critical drainage elements, including the flow control features, connection and discharge rates. 

ii) Calculations to demonstrate the hydraulic performance of the entire pipe network, including the proposed pipe network, for the 1 in 1 year, 1 in 30 year, 1 in 100 year and 1 in 100 year plus 40% climate change.

iii) An indication of exceedance overland flow routes, including provision for failure of a pump, should it be required.

iv) Provide a method statement regarding the management of surface water runoff during the construction phase of the project.

v) Evidence of consent from Anglian Water for the proposed discharge rate and connection location to the public sewer.

vi) surface water management strategy including evidence to demonstrate that the surface water hierarchy has been followed as stipulated in Building Regulations Part H.

vii) A maintenance plan for the SuDS and corresponding drainage infrastructure with details on the accessibility of the SuDS for future maintenance, and for a pump, should it be required.

 

The drainage strategy and SuDS design statement must be implemented in full accordance with the details approved under this condition before the development hereby approved is first occupied or brought into first use.

 

Reason:  To ensure the approved development does not increase flood risk elsewhere in accordance with National Planning Policy Framework (2019), Core Strategy (2007) Policies KP1, KP2 and KP3 and Development Management Document (2015) Policies DM6 and DM14.

 

15 No development shall take place, until a Construction Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be fully adhered to throughout the construction period. The Statement shall provide, amongst other things, for:

 

i) the parking of vehicles of site operatives and visitors

ii) loading and unloading of plant and materials

iii) storage of plant and materials used in constructing the development

iv) the erection and maintenance of security hoarding including measures to ensure the retention of trees to the rear of the site

v) measures to control the emission of dust and dirt during construction

vi) a scheme for recycling/disposing of waste resulting from construction works that does not allow for the burning of waste on site.

 

Reason: This pre-commencement condition is needed in the interests of visual amenity and the amenities of neighbouring occupiers pursuant to Policy CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

16 Construction Hours for the development hereby approved shall be restricted to 8am – 6pm Monday to Friday, 8am - 1pm Saturday and not at all on Sundays or Bank Holidays.

 

Reason: In the interests of visual amenity and the amenities of neighbours and to ensure a satisfactory standard of landscaping pursuant to Policy CP4 of the Core Strategy (2007) and Policies DM1 and DM3 of the Development Management Document (2015).

 

(c) In the event that the planning obligation or other means of securing the financial contribution referred to in part (a) above has not been completed by 10th December 2020 or an extension of this time as may be agreed, the Interim Director of Planning or Group Manager Planning & Building Control be authorised to refuse planning permission for the application on the grounds that the development would not provide adequate mitigation for the potential disturbance to European designated site, contrary to the National Planning Policy Framework (2019), Core Strategy (2007) Policy KP2 and Development Management Document (2015) Policy DM2. 

 

INFORMATIVES

 

01 Please note that the development the subject of this application is liable for a charge under the Community Infrastructure Levy (CIL) Regulations 2010 (as amended) and it is the responsibility of the landowner(s) to ensure they have fully complied with the requirements of these regulations. A failure to comply with the CIL regulations in full can result in a range of penalties. For full planning permissions, a CIL Liability Notice will be issued by the Council as soon as practicable following this decision notice. For general consents, you are required to submit a Notice of Chargeable Development (Form 5) before commencement; and upon receipt of this, the Council will issue a CIL Liability Notice including details of the chargeable amount and when this is payable. If you have not received a CIL Liability Notice by the time you intend to commence development it is imperative that you contact:

S106andCILAdministration@southend.gov.uk to avoid financial penalties for potential failure to comply with the CIL Regulations 2010 (as amended).

 

02 You should be aware that in cases where damage occurs during construction works to the highway in implementing this permission that Council may seek to recover the cost of repairing public highways and footpaths from any party responsible for damaging them. This includes damage carried out when implementing a planning permission or other works to buildings or land. Please take care when carrying out works on or near the public highways and footpaths in the Borough.

 

03 The applicant is advised that the appropriate highways licences should be obtained prior to the commencement of the development.

 

The Local Planning Authority has acted positively and proactively in determining this application by identifying matters of concern within the application (as originally submitted) and negotiating, with the Applicant, acceptable amendments to the proposal to address those concerns.  As a result, the Local Planning Authority has been able to grant planning permission for an acceptable proposal, in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework.  The detailed analysis is set out in a report on the application prepared by officers.

 

Supporting documents:

 

Get the best from this site

We use simple text files called 'cookies'. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used. For more information, including how to turn cookies off, see more about cookies - or simply click the Continue button to use this site as normal.